SHREE RAM RESIDENCY
RG-MH-90990 · RERA P52100046437 · Last updated on MahaRERA portal: 6 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 48 months
- 3 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHREE RAM RESIDENCY is a Residential / Group Housing project by SHREE RAM DEVELOPER in Pune, Maharashtra, registered with MahaRERA as P52100046437 on 28 Jul 2022. Possession is promised by 31 Dec 2027. The completion date has moved by 48 months from the original filing. 9 of the 20 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.
At a glance
Project
- NameSHREE RAM RESIDENCY
- TypeResidential / Group Housing
- Location
- KIWALE
- PUNE
- Pimpri Chinchawad (M Corp.)
- Haveli
- 412101
- Pincode412101
- RERA no.P52100046437
- ReraGenie IDRG-MH-90990
Builder
- NameSHREE RAM DEVELOPER
- Entity typePartnership
- PartnersNAGESH NANASO BHOSALE, BHAUSAHEB VITHOBA JAGDALE, KISHOR SHANKARRAO KATKAR, VINOD SUBHASH BHOSALE, YUVRAJ VITHOBA JAGDALE
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on28 Jul 2022
- Promised completion31 Dec 2027
- Revised completionRevised to 31 Dec 2027 (originally 31 Dec 2023)
- Buildings1 building record
- Documents filed78 files
Current status
Figures as on 6 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SHREE RAM RESIDENCY | NA | 5 | 5 | 20 | 0 | 20 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 6 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 95%.
SHREE RAM RESIDENCY: 81% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Progress on shared amenities15
As on 6 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 95% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 95% |
| Storm Water Drains | Yes | 95% |
| Landscaping & Tree Planting | Yes | 95% |
| Street Lighting | Yes | 95% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 95% |
| Energy managemcnt | Yes | 95% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 95% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 95% |
Parking filed20
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SHREE RAM RESIDENCY | NA | Rs 1.27 cr | Rs 1.83 cr |
| - | NA | Rs 14.11 lakh | Rs 20.34 lakh |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Aditya Pungavkar |
| Engineer | Rahul kapse |
| Engineer | Nikesh Manware |
| Chartered Accountant | Navdeep Jindal and Associates |
| Chartered Accountant | CA Dolly Gandhi |
| Partner | Role in project |
|---|---|
| SHREE RAM DEVELOPER | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDelay is on account of pending sanction, due to some technical issue. We are expecting to receive sanction this month.
Reason as filed by the promoterDue to significant shortfall of labor, which has impacted the progress of the project. Despite our best efforts to recruit additional workers and mitigate this issue, the situation has persisted, largely due to [bad weather conditions across multiple states disturbing home town farms, dengue/ chickenguniya outbreak in city, post-pandemic effects, etc.l. Additionally, unforeseen circumstances such as [supply chain delays, natural events, etc.] have further contributed to delays in the project schedule.
Reason as filed by the promoterThe project could not be completed within the stipulated validity period due to circumstances beyond our control, including technical issues in the execution process like delay in demarcation, shortage of labour during the construction period, and financial difficulties faced by the developer. These unavoidable challenges have caused delays in timely completion of the project.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 7 Jul 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 20 Feb 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 20 Feb 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 22 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed78
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2024-2025)File: Form 2A.pdf | 6 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 Mar 26.pdf | 26 May 2026 |
| Withdrawal Update Form 2File: Form-2 Mar_26 Sign.pdf | 26 May 2026 |
| Withdrawal Update Form 3File: Form-3 Sign Mar_26.pdf | 26 May 2026 |
| Form 2A (FY 2022-2023)File: Form 2A 22-23.pdf | 28 Mar 2026 |
| Form 2A (FY 2023-2024)File: Form 2A 23-24 1.pdf | 28 Mar 2026 |
| Form 2A (FY 2024-2025)File: Form 2A 24-25.pdf | 28 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold-Booked Inventory Mar 25.pdf | 17 Mar 2026 |
| Form 1File: Form-1.pdf | 17 Mar 2026 |
| Form 2File: FORM 2 Shree Ram Developers Mar 25.pdf | 17 Mar 2026 |
| Form 3File: Form 3 - Shree Ram Developers Signed.pdf | 17 Mar 2026 |
| Withdrawal Update Form 1File: Form-1 Sep_25.pdf | 17 Mar 2026 |
| Withdrawal Update Form 1File: Form-1 Dec_25.pdf | 17 Mar 2026 |
| Withdrawal Update Form 2File: FORM 2 Shree Ram Developers Sep_25.pdf | 17 Mar 2026 |
| Withdrawal Update Form 2File: FORM 2 Shree Ram Developers Dec_25.pdf | 17 Mar 2026 |
| Withdrawal Update Form 3File: Form-3 Sep_25 Sign.pdf | 17 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 - Dec_25 Sign.pdf | 17 Mar 2026 |
| Form 5 (FY 2024-2025)File: Shree Ram Developers Form 5_page-0001.pdf | 8 Oct 2025 |
| Withdrawal Update Form 1File: form 1.pdf | 20 Jul 2025 |
| Withdrawal Update Form 2File: form 2_merged (1)_removed.pdf | 20 Jul 2025 |
| Withdrawal Update Form 3File: form 3.pdf | 20 Jul 2025 |
| Form 1File: Form-1.pdf | 1 Jul 2025 |
| Form 2File: Form-2.pdf | 1 Jul 2025 |
| Form 3File: Form 3 - Shree Ram Developers Signed.pdf | 1 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold-Booked Inventory.pdf | 1 Jul 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM-5 signed.pdf | 22 Feb 2025 |
| Declaration in FORM BFile: Form B for extension.pdf | 21 Feb 2025 |
| Layout approvalFile: 1 LAYOUT PLAN_3_11zon.pdf | 20 Feb 2025 |
| Building plan approvalFile: 2 BUILDING PLAN_1_11zon.pdf | 20 Feb 2025 |
| Copy of Layout Approval (in case of layout)File: 1 LAYOUT PLAN_3_11zon.pdf | 20 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 20 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Shree Ram Developers Signed.pdf | 20 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf | 20 Feb 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 2 BUILDING PLAN_1_11zon.pdf | 20 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold-Booked Inventory.pdf | 20 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf | 20 Feb 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: shree ram developer for Secured or unsecured finance availed for the project.pdf | 20 Feb 2025 |
| Layout approvalFile: layout approval.pdf | 22 Feb 2024 |
| Building plan approvalFile: building plan.pdf | 22 Feb 2024 |
| Copy of Layout Approval (in case of layout)File: layout approval.pdf | 22 Feb 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: building plan.pdf | 22 Feb 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: commencement cert.pdf | 22 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2A 22-23.pdf | 22 Jan 2024 |
| Declaration in FORM BFile: Form B revised.pdf | 20 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 16 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 16 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf | 16 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2A 22-23.pdf | 15 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: disclosure of sold unsold.pdf | 15 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 shree ram dev.pdf | 27 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 shree ram dev.pdf | 27 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: PDF (1) (1).pdf | 27 Dec 2023 |
| Proforma of Allotment letterFile: AGRREMENT_1.pdf | 20 Jul 2022 |
| Proforma of Allotment letterFile: AGRREMENT_2.pdf | 20 Jul 2022 |
| Proforma of Allotment letterFile: AGRREMENT_3.pdf | 20 Jul 2022 |
| Proforma of Allotment letterFile: AGRREMENT_4.pdf | 20 Jul 2022 |
| Deviation Report with respect to model copy of AgreementFile: deviation from agreement.pdf | 20 Jul 2022 |
| Details of encumbrances concerned to FinanceFile: financial encumbrances.pdf | 19 Jul 2022 |
| Proforma of Allotment letterFile: allotment latter final (1).pdf | 12 Jul 2022 |
| Copy of the legal title reportFile: title search report.pdf | 7 Jul 2022 |
| Details of encumbrances concerned to LegalFile: Encumbrances for legal.pdf | 7 Jul 2022 |
| CERSAI detailsFile: cersal cert_.pdf | 7 Jul 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: seperate account bank.pdf | 7 Jul 2022 |
| Deviation Report with respect to Allotment letterFile: model copy of allotment letter.pdf | 7 Jul 2022 |
| Declaration in FORM BFile: Form B shree ram dev.pdf | 21 Jun 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: from 3.pdf | 21 Jun 2022 |
| Layout approvalFile: merged.pdf | 13 Jun 2022 |
| Building plan approvalFile: LAYOUT approval-5.pdf | 13 Jun 2022 |
| Building plan approvalFile: LAYOUT approval-6.pdf | 13 Jun 2022 |
| Building plan approvalFile: LAYOUT approval-7.pdf | 13 Jun 2022 |
| Copy of Layout Approval (in case of layout)File: merged.pdf | 13 Jun 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: LAYOUT approval-5.pdf | 13 Jun 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: LAYOUT approval-6.pdf | 13 Jun 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: LAYOUT approval-7.pdf | 13 Jun 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE FROM-A.pdf | 13 Jun 2022 |
| PAN CardFile: firm PAN CARD.pdf | 4 Jun 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: commencment certificate.pdf | 4 Jun 2022 |
| Declaration about Commencement CertificateFile: decleration for comm certi.pdf | 4 Jun 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- All 78 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SHREE RAM RESIDENCY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near PUNE13,700+ in Pune
Godrej Park Greens
Godrej Skyline Developers Limited
FOREST GROVE AT GODREJ PARK GREENS
Godrej Skyline Developers Limited
Om Mangalam Samruddhi
NDG Homes LLP
PCMC EWS KIWALE
Pimpri Chinchwad Municipal Corporation
Godrej Nurture
Godrej Skyline Developers Limited
My Home Sanctuary Phase I
MAMURDI DEVELOPERS LLP
Builder: SHREE RAM DEVELOPER
SHREE RAM DEVELOPER has 1 registration on MahaRERA, including SHREE RAM RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if SHREE RAM RESIDENCY is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHREE RAM RESIDENCY?
The registered promoter entity is SHREE RAM DEVELOPER, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHREE RAM RESIDENCY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHREE RAM RESIDENCY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHREE RAM RESIDENCY?
The professionals named in the filing: Architect: Aditya Pungavkar; Engineer: Rahul kapse; Engineer: Nikesh Manware; Chartered Accountant: Navdeep Jindal and Associates; Chartered Accountant: CA Dolly Gandhi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHREE RAM RESIDENCY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.