SHREE MAHALAKSHMI RESIDENCY

By SHREE MAHALAKSHMI CONSTRUCTIONS

RG-MH-72739 · RERA P51900045601 · Last updated on MahaRERA portal: 24 Jul 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 4 months past the filed date
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Jun 2026Possession promised4 months past this date
8 of 11Construction stages donefurthest along: Internal walls, 95%
13 of 24Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 84 documents Report an error

SHREE MAHALAKSHMI RESIDENCY is a Residential / Group Housing project by SHREE MAHALAKSHMI CONSTRUCTIONS in Mumbai City, Maharashtra, registered with MahaRERA as P51900045601 on 26 May 2022. Possession was promised by 30 Jun 2026 and is now 4 months past that date. The completion date has moved by 12 months from the original filing. 11 of the 24 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHREE MAHALAKSHMI RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • SOONAWALA AGIARY LANE
    • MAHIM WEST
    • Mumbai City
    • 400016
  • Pincode400016
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900045601
  • ReraGenie IDRG-MH-72739

Builder

  • NameSHREE MAHALAKSHMI CONSTRUCTIONS
  • Entity typePartnership
  • GSTIN27ACIFS6402L1ZT
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnerLEENA SUNIL WADHARE
  • Other registrations4 more →
  • Completed1 of 5
  • No longer live1 lapsed, de-registered or revoked

Key dates

4 months past promisethis monthRegisteredMay 2022First promiseJun 2025Revised toJun 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on26 May 2022
  • Promised completion30 Jun 2026
  • Revised completionRevised to 30 Jun 2026 (originally 30 Jun 2025)
  • Buildings1 building record
  • Documents filed84 files

Current status

46%11 of 24 units booked

Figures as on 24 Jul 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHREE MAHALAKSHMI RESIDENCYNA242124024

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

SHREE MAHALAKSHMI RESIDENCY: 95% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 24 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes85%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area447 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
SHREE MAHALAKSHMI CONSTRUCTIONAndheriMumbai Suburban
LEENA SUNIL WADHAREAndheriMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI3600.61
Proposed, not sanctioned1,283 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPUSHPA KUNJ SANTACRUZ EAST

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANE DESIGN WORKSHOP
EngineerEPICONS CONSULTANTS PVT LTD
Chartered AccountantG C PATEL
Chartered AccountantNeeta Chaudhari
PartnerRole in project
SHREE MAHALAKSHMI CONSTRUCTIONS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA25072502199Jun 2025 → Jun 2026

Reason as filed by the promoterThe construction is nearing completion. However, due to unavoidable challenges with timely material supply and quality inconsistencies from our supplier, we were compelled to return a substantial portion of the stock. This dispute has led to delays in the construction timeline. We are actively working to resolve the issue and expect to resume with materials that meet the recommended standards of quality and quantity

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 May 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 May 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 May 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 May 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed84

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form-1_March25-compressed.pdf24 Jul 2025
Form 2File: Form-2-compressed.pdf24 Jul 2025
Form 3File: Form-3_compressed.pdf24 Jul 2025
Disclosure of Sold and Booked InventoryFile: SMR Sold & Unsold Inventory.pdf24 Jul 2025
Form 1File: Form-1_March23-compressed.pdf24 Jul 2025
Form 2File: Form-2-compressed.pdf24 Jul 2025
Form 3File: Form-3_compressed.pdf24 Jul 2025
Disclosure of Sold and Booked InventoryFile: SMR Sold & Unsold Inventory.pdf24 Jul 2025
Form 1File: Form-1_March25-compressed.pdf24 Jul 2025
Form 2File: Form-2-compressed.pdf24 Jul 2025
Form 3File: Form-3_compressed.pdf24 Jul 2025
Disclosure of Sold and Booked InventoryFile: SMR Sold & Unsold Inventory.pdf24 Jul 2025
Form 1File: Form-1_March25-compressed.pdf24 Jul 2025
Form 2File: Form-2-compressed.pdf24 Jul 2025
Form 3File: Form-3_compressed.pdf24 Jul 2025
Disclosure of Sold and Booked InventoryFile: SMR Sold & Unsold Inventory.pdf24 Jul 2025
Form 1File: Form-1_March24-compressed.pdf24 Jul 2025
Form 2File: Form-2-compressed.pdf24 Jul 2025
Form 3File: Form-3_compressed.pdf24 Jul 2025
Disclosure of Sold and Booked InventoryFile: SMR Sold & Unsold Inventory.pdf24 Jul 2025
Form 1File: Form-1_March23-compressed.pdf24 Jul 2025
Form 2File: Form-2-compressed.pdf24 Jul 2025
Form 3File: Form-3_compressed.pdf24 Jul 2025
Disclosure of Sold and Booked InventoryFile: SMR Sold & Unsold Inventory.pdf24 Jul 2025
Form 1File: Form-1_March24-compressed.pdf24 Jul 2025
Form 2File: Form-2-compressed.pdf24 Jul 2025
Form 3File: Previous Form-3.pdf24 Jul 2025
Disclosure of Sold and Booked InventoryFile: SMR Sold & Unsold Inventory.pdf24 Jul 2025
Form 1File: Form-1_March24-compressed.pdf24 Jul 2025
Form 2File: Form-2-compressed.pdf24 Jul 2025
Form 3File: Form-3_compressed.pdf24 Jul 2025
Disclosure of Sold and Booked InventoryFile: SMR Sold & Unsold Inventory.pdf24 Jul 2025
Form 1File: Form-1_March24-compressed.pdf24 Jul 2025
Form 2File: Form-2-compressed.pdf24 Jul 2025
Form 3File: Form-3_compressed.pdf24 Jul 2025
Disclosure of Sold and Booked InventoryFile: SMR Sold & Unsold Inventory.pdf24 Jul 2025
Form 1File: Form-1_March23-compressed.pdf24 Jul 2025
Form 2File: Form-2-compressed.pdf24 Jul 2025
Form 3File: Previous Form-3.pdf24 Jul 2025
Disclosure of Sold and Booked InventoryFile: SMR Sold & Unsold Inventory.pdf24 Jul 2025
Form 1File: Form-1_March23-compressed.pdf24 Jul 2025
Form 2File: Form-2-compressed.pdf24 Jul 2025
Form 3File: Previous Form-3.pdf24 Jul 2025
Disclosure of Sold and Booked InventoryFile: SMR Sold & Unsold Inventory.pdf24 Jul 2025
Form 1File: Form-1_March23-compressed.pdf24 Jul 2025
Form 2File: Form-2-compressed.pdf24 Jul 2025
Form 3File: Previous Form-3.pdf24 Jul 2025
Disclosure of Sold and Booked InventoryFile: SMR Sold & Unsold Inventory.pdf24 Jul 2025
Form 2A (FY 2022-2023)File: Form-2A_March23-compressed.pdf24 Jul 2025
Form 2A (FY 2023-2024)File: Form-2A_March24-compressed.pdf24 Jul 2025
Form 2A (FY 2024-2025)File: Form-2A_March25-compressed.pdf24 Jul 2025
Form 5 (FY 2022-2023)File: Form-5_2022-23.pdf4 Jul 2025
Form 5 (FY 2023-2024)File: Form-5_2023-24.pdf4 Jul 2025
Form 5 (FY 2024-2025)File: Form-5_2024-25.pdf4 Jul 2025
Copy of the legal title reportFile: Maha RERA_compressed.pdf21 May 2022
Copy of the legal title reportFile: Format-A.pdf21 May 2022
Layout approvalFile: Layout-01.pdf19 May 2022
Layout approvalFile: Layout-02.pdf19 May 2022
Layout approvalFile: Layout-03.pdf19 May 2022
Building plan approvalFile: Layout-04.pdf19 May 2022
Building plan approvalFile: Layout-05.pdf19 May 2022
Building plan approvalFile: Layout-06.pdf19 May 2022
Copy of Layout Approval (in case of layout)File: Layout-01.pdf19 May 2022
Copy of Layout Approval (in case of layout)File: Layout-02.pdf19 May 2022
Copy of Layout Approval (in case of layout)File: Layout-03.pdf19 May 2022
Building Plan Approval / NA Order for plotted developmentFile: Layout-04.pdf19 May 2022
Building Plan Approval / NA Order for plotted developmentFile: Layout-05.pdf19 May 2022
Building Plan Approval / NA Order for plotted developmentFile: Layout-06.pdf19 May 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf19 May 2022
Proforma of Allotment letterFile: ALLOTMENT LETTER blank 1.pdf19 May 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form3-1-2.pdf11 May 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form3-3-4.pdf11 May 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form3-5-6.pdf11 May 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form3-7-8.pdf11 May 2022
Declaration about Commencement CertificateFile: Declaration About Commencement Certificate.pdf4 May 2022
Declaration in FORM BFile: Affidavit cum Declaration NEW.pdf4 May 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera Certificate - ANE.pdf4 May 2022
CERSAI detailsFile: CERSAI_Search_Report_200236600604_For_Asset_Based_Search_04_05_2022_15_35_07_900.pdf4 May 2022
Proforma of Allotment letterFile: 0001 Sale Agreement Blank 1-10.pdf4 May 2022
Proforma of Allotment letterFile: 0001 Sale Agreement Blank 11-20.pdf4 May 2022

How this compares with Mumbai City

46%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one moved by 12 months
25%of Mumbai City registrations have lapsed or been cancelledthis one is among them

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREE MAHALAKSHMI RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MAHIM WEST780+ in Mumbai City

2 kmSHREE MAHALAKSHMI RESIDECompleted 2Lapsed / revoked 3Other 12Dot size: filed unitsN

Filed coordinates, straight-line distance. 17 registered projects within 2 km.

Builder: SHREE MAHALAKSHMI CONSTRUCTIONS

SHREE MAHALAKSHMI CONSTRUCTIONS has 5 registrations on MahaRERA, including SHREE SUMITRA APARTMENTS and SHREE MAHALAKSHMI RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What does it mean that SHREE MAHALAKSHMI RESIDENCY shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SHREE MAHALAKSHMI RESIDENCY is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREE MAHALAKSHMI RESIDENCY?

The registered promoter entity is SHREE MAHALAKSHMI CONSTRUCTIONS, a partnership as per the filing. Its GSTIN 27ACIFS6402L1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREE MAHALAKSHMI RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREE MAHALAKSHMI RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREE MAHALAKSHMI RESIDENCY?

The professionals named in the filing: Architect: ANE DESIGN WORKSHOP; Engineer: EPICONS CONSULTANTS PVT LTD; Chartered Accountant: G C PATEL; Chartered Accountant: Neeta Chaudhari. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREE MAHALAKSHMI RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREE MAHALAKSHMI RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREE MAHALAKSHMI RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.