Home / Browse projects / VITALIS

Registered No litigation declared Residential / Group Housing project

VITALIS

By SURAJ ESTATE DEVELOPERS LTD

RG-MH-29328 · RERA P51900031447 · Last updated on MahaRERA portal: 15 May 2026

Source: official MahaRERA filing

Red flags

  • Rs 85.00 crore secured on the land, in favour of Indusind Bank

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Dec 2026Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Slabs of Super Structure, 16%
110 of 184Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 189 documents Report an error

VITALIS is a Residential / Group Housing project by SURAJ ESTATE DEVELOPERS LTD in MAHIM, 400016, registered with MahaRERA as P51900031447 on 23 Oct 2021. Possession is promised by 31 Dec 2026. 74 of the 184 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameVITALIS
  • TypeResidential / Group Housing
  • Location
    • LADY JAMSHEDJI ROAD
    • MAHIM
    • 400016
  • Pincode400016
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900031447
  • ReraGenie IDRG-MH-29328

Builder

  • NameSURAJ ESTATE DEVELOPERS LTD
  • Entity typeCompany
  • CINU99999MH1986PTC040873
  • GSTIN27AAACS8375H1Z0
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Managing DirectorTHOMAS RAJAN
  • Other registrations14 more →
  • Completed4 of 15
  • No longer live3 lapsed, de-registered or revoked
  • Past their filed date1
  • Declared earlier projects4 →

Key dates

this monthRegisteredOct 2021PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Oct 2021
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed189 files

Current status

40%74 of 184 units booked
62.8%Work done, per cost certificate

Figures as on 15 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VITALISNA352416816184

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 16%.

VITALIS: 47% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure16%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.2%

Progress on shared amenities15

As on 15 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes40%
Storm Water DrainsYes10%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes5%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed278

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots278
Closed/Covered258
Open Space20

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area2,751 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofIndusind Bank
Secured amountRs 85.00 crore
CERSAI search filedYes
Declared on7 Oct 2025

Approvals and building plan

Permissible FSI11311.76
Proposed, not sanctioned10,946 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR, MARATHE UDYOG BHAVAN, NEXT TO SKODA SHOWROOM, APPASAHEB MARATHE MARG, PRABHADEVI, MUMBAI – 400025
Estimated costRs 83.45 cr
Cost incurredRs 52.44 cr
Work done62.84%
BuildingWingEstimatedIncurred
-NARs 83.45 crRs 52.44 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPriyanka Rahate
ArchitectArchvision Architects
EngineerRohan Thanedar
Chartered AccountantRakesh jain
Chartered AccountantNaveen Tripathi
Chartered AccountantJiger Zaveri & Associate
PartnerRole in project
SURAJ ESTATE DEVELOPERS LTD-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Oct 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Oct 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Feb 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed189

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 189 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 -MARCH 2026 SIGNED.pdf15 May 2026
Withdrawal Update Form 2File: Form 2 Vitalis Project 31st March 2026.pdf15 May 2026
Withdrawal Update Form 3File: Form 3 Vitalis Project 31st March 2026.pdf15 May 2026
Withdrawal Update Form 1File: Form 1 Vitalis Project Dec-2025.pdf14 May 2026
Withdrawal Update Form 2File: Form 2 Dec-2025 Vitalis Project.pdf14 May 2026
Withdrawal Update Form 3File: Form 3 Dec-2025 Vitalis Project.pdf14 May 2026
Building plan approvalFile: IOD 13112024 SANCTIONED AREA.pdf2 Feb 2026
Building plan approvalFile: Basement Plan.pdf10 Jan 2026
Building plan approvalFile: Podium Plans.pdf10 Jan 2026
Building plan approvalFile: Podium Sheet II.pdf10 Jan 2026
Building plan approvalFile: Podium Sheet III.pdf10 Jan 2026
Building plan approvalFile: Podium Section.pdf10 Jan 2026
Building plan approvalFile: Amenities - BUA Diagram.pdf10 Jan 2026
Building plan approvalFile: Approved Plan 1.pdf10 Jan 2026
Building plan approvalFile: Approved Plan 2.pdf10 Jan 2026
Building plan approvalFile: Approved Plan 3.pdf10 Jan 2026
Building plan approvalFile: Approved Plan 4.pdf10 Jan 2026
Building plan approvalFile: Approved Plan 5.pdf10 Jan 2026
Building plan approvalFile: Approved Plan 6.pdf10 Jan 2026
Building plan approvalFile: Approved Plan7.pdf10 Jan 2026
Building plan approvalFile: Approved Plan 8.pdf10 Jan 2026
Building plan approvalFile: Approved Plan 9.pdf10 Jan 2026
Building plan approvalFile: Approved Plan 10.pdf10 Jan 2026
Building plan approvalFile: Section I.pdf10 Jan 2026
Building plan approvalFile: Sheet 18.pdf5 Jan 2026
Building plan approvalFile: Sheet 19.pdf5 Jan 2026
Withdrawal Update Form 1File: june 25 vitalis.pdf20 Dec 2025
Withdrawal Update Form 1File: Form 1 Vitalis Project - Sept-2025.pdf20 Dec 2025
Withdrawal Update Form 2File: Vitalis_Form 2 Signed June 2025.pdf20 Dec 2025
Withdrawal Update Form 2File: Form 2 Vitalis Project- September-2025.pdf20 Dec 2025
Withdrawal Update Form 3File: Form 3_ Vitalis Project_June 2025.pdf20 Dec 2025
Withdrawal Update Form 3File: Form 3 - Vitalis Project Sept-2025.pdf20 Dec 2025
Withdrawal Update Form 1File: Form 1 Vitalis Project - Sept-2025.pdf17 Dec 2025
Withdrawal Update Form 1File: Form 1 Vitalis Project - Sept-2025.pdf17 Dec 2025
Withdrawal Update Form 1File: Form 1 Vitalis Project - Sept-2025.pdf17 Dec 2025
Withdrawal Update Form 1File: Form 1 Vitalis Project - Sept-2025.pdf17 Dec 2025
Withdrawal Update Form 2File: Form 2 Vitalis Project- September-2025.pdf17 Dec 2025
Withdrawal Update Form 2File: Form 2 Vitalis Project- September-2025.pdf17 Dec 2025
Withdrawal Update Form 2File: Form 2 Vitalis Project- September-2025.pdf17 Dec 2025
Withdrawal Update Form 2File: Form 2 Vitalis Project- September-2025.pdf17 Dec 2025
Withdrawal Update Form 3File: Form 3 - Vitalis Project Sept-2025.pdf17 Dec 2025
Withdrawal Update Form 3File: Form 3 - Vitalis Project Sept-2025.pdf17 Dec 2025
Withdrawal Update Form 3File: Form 3 - Vitalis Project Sept-2025.pdf17 Dec 2025
Withdrawal Update Form 3File: Form 3 - Vitalis Project Sept-2025.pdf17 Dec 2025
Withdrawal Update Form 1File: FORM 1-VITALIS.pdf15 Dec 2025
Withdrawal Update Form 1File: FORM 1-VITALIS.pdf15 Dec 2025
Withdrawal Update Form 2File: Vitalis_Form 2 Signed Copy.pdf15 Dec 2025
Withdrawal Update Form 2File: Vitalis_Form 2 Signed Copy.pdf15 Dec 2025
Withdrawal Update Form 3File: Form 3_ Vitalis Project_June 2025.pdf15 Dec 2025
Withdrawal Update Form 3File: Form 3_ Vitalis Project_June 2025.pdf15 Dec 2025
Building plan approvalFile: Letter.pdf1 Nov 2025
Building plan approvalFile: Sheet 1.pdf1 Nov 2025
Building plan approvalFile: Sheet 2.pdf1 Nov 2025
Building plan approvalFile: Sheet3.pdf1 Nov 2025
Building plan approvalFile: Sheet 4.pdf1 Nov 2025
Building plan approvalFile: Sheet 5.pdf1 Nov 2025
Building plan approvalFile: Sheet 6.pdf1 Nov 2025
Building plan approvalFile: Sheet 7.pdf1 Nov 2025
Building plan approvalFile: Sheet 8.pdf1 Nov 2025
Building plan approvalFile: Sheet 9.pdf1 Nov 2025
Building plan approvalFile: Sheet 10.pdf1 Nov 2025
Building plan approvalFile: Sheet 11.pdf1 Nov 2025
Building plan approvalFile: Sheet 12.pdf1 Nov 2025
Building plan approvalFile: Sheet 13.pdf1 Nov 2025
Building plan approvalFile: Sheet 14.pdf1 Nov 2025
Building plan approvalFile: Sheet 15.pdf1 Nov 2025
Building plan approvalFile: Sheet 17.pdf1 Nov 2025
Building plan approvalFile: Sheet 18.pdf1 Nov 2025
Form 5 (FY 2024-2025)File: Form 5 Vitalis March 25 sg (1).pdf29 Oct 2025
OtherFile: Revised MOEF NOC.pdf22 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FP 107 - December 2024.pdf15 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 107_AR.pdf12 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: VITALIS.pdf9 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Vitalis Form III Dec 2024_compressed.pdf21 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: 2459178_FurtherCC_signed.pdf13 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FP 107 - June 2024.pdf27 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Certificate - Form 5 Vitalis FY 23-24 sg.pdf22 Nov 2024
Building plan approvalFile: Letter.pdf14 Nov 2024
Building plan approvalFile: Drawing (1) (1).pdf14 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: Revalidation Letter - 2024.pdf14 Nov 2024

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise2 delivered late1 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
PALETTEP51900008207DADAR-WEST, Mumbai City152Aug 2017OngoingDec 2025Registered original: Jun 2023Not delivered
HALLMARKCS 104 BHIMWADI WADALA EAST MUMBAI7-CompletedJul 2016Late, Nov 2016
ETERNITY APARTMENTFP 469 MMC CROSS ROAD MAHIM WEST MUMBAI 40001616-CompletedAug 2011Aug 2011
PARK SIDEFP 888 DATTA RAUL ROAD DADAR WEST MUMBAI 40002828-CompletedJul 2010Late, Feb 2011

Keep VITALIS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MAHIM

2 kmVITALISCompleted 15Lapsed / revoked 16Other 29Dot size: filed unitsN

Filed coordinates, straight-line distance. 60 registered projects within 2 km.

Builder: SURAJ ESTATE DEVELOPERS LTD

SURAJ ESTATE DEVELOPERS LTD has 15 registrations on MahaRERA, including ST ANTHONY APARTMENT and TRANQUIL BAY. Its filings disclose 4 earlier MahaRERA projects: declares 1 of 3 past projects completed on time. Litigation is declared on 5 of its registrations. Read the full track record.

Frequently asked questions

What are my rights if VITALIS is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VITALIS?

The registered promoter entity is SURAJ ESTATE DEVELOPERS LTD, a company as per the filing. Its CIN U99999MH1986PTC040873 and GSTIN 27AAACS8375H1Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VITALIS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VITALIS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VITALIS?

The professionals named in the filing: Architect: Priyanka Rahate; Architect: Archvision Architects; Engineer: Rohan Thanedar; Chartered Accountant: Rakesh jain; Chartered Accountant: Naveen Tripathi; Chartered Accountant: Jiger Zaveri & Associate. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VITALIS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VITALIS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VITALIS to a free account