Home / Browse projects / Thane, Maharashtra / SHREE KRISHNA HEIGHTS
SHREE KRISHNA HEIGHTS
By NANDINI BUILDERS & DEVELOPERS
RG-MH-72818 · RERA P51700048322 · Last updated on MahaRERA portal: 1 Sep 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 15 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHREE KRISHNA HEIGHTS is a Residential / Group Housing project by NANDINI BUILDERS & DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700048322 on 26 Dec 2022. Possession is promised by 31 Mar 2027. The completion date has moved by 15 months from the original filing. 32 of the 50 units on this registration are recorded sold or booked, and 9 of 22 construction stages are filed complete.
At a glance
Project
- NameSHREE KRISHNA HEIGHTS
- TypeResidential / Group Housing
- Location
- NILJE STATION ROAD
- DOMBIVALI (E)
- nelje
- Kalyan
- Thane
- 421204
- Pincode421204
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700048322
- ReraGenie IDRG-MH-72818
Builder
- NameNANDINI BUILDERS & DEVELOPERS
- Entity typePartnership
- PartnerNIKITA SUDHIR PATIL
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on26 Dec 2022
- Promised completion31 Mar 2027
- Revised completionRevised to 31 Mar 2027 (originally 31 Dec 2025)
- Buildings2 building records
- Documents filed113 files
Current status
Figures as on 1 Sep 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SHREE KRISHNA HEIGHTS | NA | 3 | 2 | 1 | 0 | 1 |
| SHREE KRISHNA HEIGHTS | NA | 8 | 7 | 49 | 0 | 49 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 1 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Installation of Lifts, at 95%.
SHREE KRISHNA HEIGHTS0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
SHREE KRISHNA HEIGHTS90%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Progress on shared amenities15
As on 1 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 90% |
| Storm Water Drains | Yes | 90% |
| Landscaping & Tree Planting | Yes | 60% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 85% |
| Energy managemcnt | Yes | 60% |
| Fire protection and fire safety requirements | Yes | 80% |
| Electrical meter room, sub-station, receiving station | Yes | 70% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed43
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| SHREE KRISHNA HEIGHTS | 3 | 3 |
| SHREE KRISHNA HEIGHTS | 40 | 40 |
Land and ownership9
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| GANESH GOPAL KHANDALE | DOMBIVLI | Thane |
| JAYWANTI BALIRAM PATIL | Pendhar | Raigarh |
| KASHINATH GOPAL KHANDALE | DOMBIVLI | Thane |
| BHAGWAN KUNDLIK BHANDARI | nelje | Thane |
| CHANGUNABAI GOPAL KHANDALE | nelje | Thane |
| SHARDA YASHWANT GAIKWAD | Tisgaon | Thane |
| BALIRAM KUNDALIK BHANDARI | nelje | Thane |
| KASHINATH KUNDALIK BHANDARI | DOMBIVLI | Thane |
| JOMUBAI SAVALARAM BHOIR | Kalyan | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SHREE KRISHNA HEIGHTS | NA | Rs 7.25 cr | Rs 7.25 cr |
| - | NA | Rs 25.00 lakh | Rs 22.50 lakh |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | RAJEEV TAYSHETE AND ASSOCIATES |
| Engineer | DEV AND ASSOCIATES |
| Chartered Accountant | RAVI MALVIYA & ASSOCIATES |
| Chartered Accountant | RAJESH TIWARI |
| Chartered Accountant | YOGESH THOMBRE |
| Partner | Role in project |
|---|---|
| NANDINI BUILDERS & DEVELOPERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe delay in completion of the project was due to financial constraints, supply chain disruptions and slowdown in customer booking which were beyond our reasonable control. However, the project is now back on track, Despite these challenges, We have taken all necessary steps to expedite remaining construction work and committed to completing the project within the extended period sought
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Oct 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 11 Nov 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 31 Oct 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2027
Documents filed113
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 113 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form-1_March_2026.pdf | 1 Sep 2026 |
| Withdrawal Update Form 1File: Form-1_30_06_2026.pdf | 1 Sep 2026 |
| Withdrawal Update Form 2File: Form-2 Mar-2026.pdf | 1 Sep 2026 |
| Withdrawal Update Form 2File: Form-2 Jun-2026.pdf | 1 Sep 2026 |
| Withdrawal Update Form 3File: Form-3 Mar-2026.pdf | 1 Sep 2026 |
| Withdrawal Update Form 3File: Form-1_30_06_2026.pdf | 1 Sep 2026 |
| Form 1File: Form-1 March-2023.pdf | 14 Aug 2026 |
| Form 2File: Form-2 March-2023.pdf | 14 Aug 2026 |
| Form 3File: Form-3 Signed.pdf | 14 Aug 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold or Booked Inventory March-23.pdf | 14 Aug 2026 |
| Form 1File: Form-1 March-2023.pdf | 14 Aug 2026 |
| Form 2File: Form-2 March-2023.pdf | 14 Aug 2026 |
| Form 3File: Form-3 Signed.pdf | 14 Aug 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold or Booked Inventory March-23.pdf | 14 Aug 2026 |
| Form 1File: Form-1 Jun-2023.pdf | 14 Aug 2026 |
| Form 2File: Form-2 Jun-2023.pdf | 14 Aug 2026 |
| Form 3File: Form-3 Jun-2023.pdf | 14 Aug 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold or Booked Inventory Jun-23.pdf | 14 Aug 2026 |
| Form 1File: Form-1 Sep-2023.pdf | 14 Aug 2026 |
| Form 2File: Form-2 Sep-2023.pdf | 14 Aug 2026 |
| Form 3File: Form-3 Sep-2023.pdf | 14 Aug 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold or Booked Inventory Sep-23.pdf | 14 Aug 2026 |
| Form 1File: Form-1 Dec-2023.pdf | 14 Aug 2026 |
| Form 2File: Form-2 Dec-2023.pdf | 14 Aug 2026 |
| Form 3File: Form-3 Dec-2023.pdf | 14 Aug 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold or Booked Inventory Dec-23.pdf | 14 Aug 2026 |
| Form 1File: Form-1 Mar-2024.pdf | 14 Aug 2026 |
| Form 2File: Form-2 Mar-2024.pdf | 14 Aug 2026 |
| Form 3File: Form-3 Mar-2024.pdf | 14 Aug 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold or Booked Inventory Mar-24.pdf | 14 Aug 2026 |
| Form 1File: Form-1 Jun-2024.pdf | 14 Aug 2026 |
| Form 2File: Form-2 Jun-2024.pdf | 14 Aug 2026 |
| Form 3File: Form-3 Jun-2024.pdf | 14 Aug 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold or Booked Inventory Jun-24.pdf | 14 Aug 2026 |
| Form 1File: Form-1 Sep-2024.pdf | 14 Aug 2026 |
| Form 2File: Form-2 Sep-2024.pdf | 14 Aug 2026 |
| Form 3File: Form-3 Sep-2024.pdf | 14 Aug 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold or Booked Inventory Sep-24.pdf | 14 Aug 2026 |
| Form 1File: Form-1 Dec-2024.pdf | 14 Aug 2026 |
| Form 2File: Form-2 Dec-2024.pdf | 14 Aug 2026 |
| Form 3File: Form-3 Dec-2024.pdf | 14 Aug 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold or Booked Inventory Dec-24.pdf | 14 Aug 2026 |
| Form 1File: Form-1 Mar-2025.pdf | 14 Aug 2026 |
| Form 2File: Form-2 Mar-2025.pdf | 14 Aug 2026 |
| Form 3File: Form-3 Mar-2025.pdf | 14 Aug 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold or Booked Inventory Mar-25.pdf | 14 Aug 2026 |
| Withdrawal Update Form 1File: Form-1 Jun-2026.pdf | 14 Aug 2026 |
| Withdrawal Update Form 1File: Form-1 Jun-2025.pdf | 14 Aug 2026 |
| Withdrawal Update Form 1File: Form-1 Sep-2025.pdf | 14 Aug 2026 |
| Withdrawal Update Form 1File: Form-1 Sep-2025.pdf | 14 Aug 2026 |
| Withdrawal Update Form 1File: Form-1 Sep-2025.pdf | 14 Aug 2026 |
| Withdrawal Update Form 2File: Form-2 Jun-2026.pdf | 14 Aug 2026 |
| Withdrawal Update Form 2File: Form-2 Jun-2025.pdf | 14 Aug 2026 |
| Withdrawal Update Form 2File: Form-2 Sep-2025.pdf | 14 Aug 2026 |
| Withdrawal Update Form 2File: Form-2 Sep-2025.pdf | 14 Aug 2026 |
| Withdrawal Update Form 2File: Form-2 Sep-2025.pdf | 14 Aug 2026 |
| Withdrawal Update Form 3File: Form-3 Jun-2026.pdf | 14 Aug 2026 |
| Withdrawal Update Form 3File: Form-3 Jun-2025.pdf | 14 Aug 2026 |
| Withdrawal Update Form 3File: Form-3 Sep-2025.pdf | 14 Aug 2026 |
| Withdrawal Update Form 3File: Form-3 Sep-2025.pdf | 14 Aug 2026 |
| Withdrawal Update Form 3File: Form-3 Jun-2026.pdf | 14 Aug 2026 |
| Form 2A (FY 2025-2026)File: Form-2A Mar-2026.pdf | 14 Aug 2026 |
| Form 2A (FY 2024-2025)File: Form-2A Mar-2025.pdf | 14 Aug 2026 |
| Form 2A (FY 2023-2024)File: Form-2A Mar-2024.pdf | 14 Aug 2026 |
| Form 2A (FY 2022-2023)File: Form-2A March-2023.pdf | 14 Aug 2026 |
| Form 5 (FY 2025-2026)File: Form-5 Mar-2026.pdf | 14 Aug 2026 |
| Form 5 (FY 2024-2025)File: Form-5 Mar-2025.pdf | 14 Aug 2026 |
| Form 5 (FY 2023-2024)File: Form-5 Mar-2024.pdf | 14 Aug 2026 |
| Form 5 (FY 2022-2023)File: Form 5 March-2023.pdf | 14 Aug 2026 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DocScanner Dec 19, 2024 5-39 PM.pdf | 6 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form5-2023_compressed.pdf | 6 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form5-2023_compressed.pdf | 6 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form5-2024_compressed.pdf | 6 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 31032024.pdf | 16 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 31062024.pdf | 16 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM-2 Date--31-03-2023 -1.pdf | 16 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2 Date--30-06-2023 -2.pdf | 16 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2 Date--30-09-2023 -3.pdf | 16 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2 Date-- 31-12-2023 -4.pdf | 16 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2 Date--31-03-2024 -5.pdf | 16 Aug 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 113 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SHREE KRISHNA HEIGHTS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near DOMBIVALI (E)7,600+ in Thane
Filed coordinates, straight-line distance. 61 registered projects within 2 km.
Constrcution of 2557 EWS tenements at S.No.157
ARUN SHANKARRAO BORGAVE
Runwal Gardens Phase I
Runwal Residency Private Limited
Runwal Garden City Cluster 6 Tower 6 to 9
HORIZON PROJECTS PVT LTD
Runwal Gardens Phase 6A Bldg No. 53-54
Runwal Residency Private Limited
RGC Runwal My City EWS - LIG Building
HORIZON PROJECTS PVT LTD
BALAJI ESTATE PHASE 2
M/S SAI BALAJI BUILDCON
See every Thane project, with the district possession charts
Builder: NANDINI BUILDERS & DEVELOPERS
NANDINI BUILDERS & DEVELOPERS has 1 registration on MahaRERA, including SHREE KRISHNA HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if SHREE KRISHNA HEIGHTS is delayed beyond 31 Mar 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHREE KRISHNA HEIGHTS?
The registered promoter entity is NANDINI BUILDERS & DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHREE KRISHNA HEIGHTS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHREE KRISHNA HEIGHTS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHREE KRISHNA HEIGHTS?
The professionals named in the filing: Architect: RAJEEV TAYSHETE AND ASSOCIATES; Engineer: DEV AND ASSOCIATES; Chartered Accountant: RAVI MALVIYA & ASSOCIATES; Chartered Accountant: RAJESH TIWARI; Chartered Accountant: YOGESH THOMBRE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHREE KRISHNA HEIGHTS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback