SHREE KRISHNA ELEGANCE
By SHREE KRISHNA CONSTRUCTION CO
RG-MH-30203 · RERA P99000030028 · Last updated on MahaRERA portal: 27 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 36 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHREE KRISHNA ELEGANCE is a Others project by SHREE KRISHNA CONSTRUCTION CO in Palghar, Maharashtra, registered with MahaRERA as P99000030028 on 26 Jul 2021. Possession is promised by 31 Dec 2028. The completion date has moved by 36 months from the original filing. 82 of the 94 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.
At a glance
Project
- NameSHREE KRISHNA ELEGANCE
- TypeOthers
- Location
- GOKHIWARE
- Vasai-Virar City (M Corp)
- Vasai
- Palghar
- 401208
- Pincode401208
- RERA no.P99000030028
- ReraGenie IDRG-MH-30203
Builder
- NameSHREE KRISHNA CONSTRUCTION CO
- Entity typePartnership
- PartnersPRITAMSINGH GURUDAYALSINGH GOHONIA, NIRMALA SUBHASH UPADHYAY, RAMESHKUMAR JODHAJI PUROHIT, SURINDERSINGH GURUDAYALSINGH GOHONIA, VIBHA N UPADHYAY
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on26 Jul 2021
- Promised completion31 Dec 2028
- Revised completionRevised to 31 Dec 2028 (originally 31 Dec 2025)
- Buildings1 building record
- Documents filed51 files
Current status
Figures as on 27 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SHREE KRISHNA ELEGANCE | NA | 25 | 23 | 88 | 6 | 94 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 27 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 99%.
SHREE KRISHNA ELEGANCE: 81% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 97% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 99% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 92% |
Progress on shared amenities15
As on 27 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 35% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 90% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 90% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 90% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed1
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| DEVNDRA R LADHANI | Vasai-Virar City (M Corp) | Palghar |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SHREE KRISHNA ELEGANCE | NA | Rs 19.50 cr | Rs 18.52 cr |
| - | NA | Rs 1.80 cr | Rs 1.35 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SANAT MEHTA AND ASSOCIATES |
| Engineer | SANATMEHTA AND ASSOCIATES |
| Engineer | Gaurav Mishra |
| Chartered Accountant | R D LUKAD |
| Chartered Accountant | R D LUKAD & CO |
| Partner | Role in project |
|---|---|
| SHREE KRISHNA CONSTRUCTION CO | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe respectfully submit that the delay in achieving the stipulated project milestones has primarily arisen due to factors beyond our reasonable control, specifically the protracted processing timelines at various governmental and statutory departments. Despite our diligent and consistent follow-up, the procedure for securing the Occupancy Certificate (OC) has taken substantially longer than initially projected. In light of these circumstances, we request a reasonable extension of time to ensure that all statutory compliances are duly fulfilled and that the Occupancy Certificate is obtained in a
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Jun 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 Jun 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 Jun 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 30 Jun 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed51
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: SKC FORM 1.pdf | 27 Jul 2026 |
| Withdrawal Update Form 2File: SKC FORM 2.pdf | 27 Jul 2026 |
| Withdrawal Update Form 3File: SHREE KRISHNA CONS 1.pdf | 27 Jul 2026 |
| Form 5 (FY 2025-2026)File: SHREE KRISHNA CONS.pdf | 23 Jul 2026 |
| Withdrawal Update Form 1File: fORM 1 ELEGENCE.pdf | 8 Jul 2026 |
| Withdrawal Update Form 1File: fORM 1 ELEGENCE.pdf | 8 Jul 2026 |
| Withdrawal Update Form 2File: fORM 2 ELEGENCE.pdf | 8 Jul 2026 |
| Withdrawal Update Form 2File: fORM 2 ELEGENCE.pdf | 8 Jul 2026 |
| Withdrawal Update Form 3File: SHREE KRISHNA CONSTIRUCTION CO.pdf | 8 Jul 2026 |
| Withdrawal Update Form 3File: SHREE KRISHNA CONSTIRUCTION CO.pdf | 8 Jul 2026 |
| Withdrawal Update Form 1File: form 1 july sep 25.pdf | 29 Jun 2026 |
| Withdrawal Update Form 2File: 01 JULY 25 TO 30 SEPT 25 FORM 2.pdf | 29 Jun 2026 |
| Withdrawal Update Form 3File: SHREE KRISHNA CONS FROM 3.pdf | 29 Jun 2026 |
| Withdrawal Update Form 1File: form 1 july sep 25.pdf | 24 Nov 2025 |
| Withdrawal Update Form 2File: 01 JULY 25 TO 30 SEPT 25 FORM 2.pdf | 24 Nov 2025 |
| Withdrawal Update Form 3File: SHREE KRISHNA CONS FROM 3.pdf | 24 Nov 2025 |
| Form 5 (FY 2024-2025)File: Scan-4.pdf | 24 Nov 2025 |
| Form 5 (FY 2023-2024)File: Scan-3.pdf | 24 Nov 2025 |
| Form 5 (FY 2022-2023)File: Scan-2.pdf | 24 Nov 2025 |
| Form 5 (FY 2021-2022)File: Scan-1.pdf | 24 Nov 2025 |
| Form 2A (FY 2021-2022)File: FORM 2A FY 2021-22.pdf | 5 Nov 2025 |
| Form 2A (FY 2022-2023)File: FORM 2A FY 2022-23.pdf | 5 Nov 2025 |
| Form 2A (FY 2023-2024)File: FORM 2A 2023-24.pdf | 5 Nov 2025 |
| Form 2A (FY 2024-2025)File: FORM 2A FY 2024-25.pdf | 5 Nov 2025 |
| Withdrawal Update Form 1File: 4 Architect’s Certificate of Percentage of Completion of Work (Form 1) (1).pdf | 2 Sep 2025 |
| Withdrawal Update Form 2File: 2 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 2 Sep 2025 |
| Withdrawal Update Form 3File: 3 CA Certificate on Project Cost u0026 Fund withdrawal (Form 3) (3).pdf | 2 Sep 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SKC FORM-1 ARCHITECT CERTIFICATE JAN TO MARCH 2025.pdf | 18 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SKC FORM -2 ENGINEER CERTIFICATE JAN TO MARCH 2025.pdf | 18 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: SKC SOLD UNSOLD LIST 31-03-25.pdf | 18 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shree Krishna elegance cost .pdf | 22 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: shree krishna construction co_compressed.pdf | 21 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: shree krishna construction co.pdf | 20 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SKC FORM 1.pdf | 19 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: SKC SOLD UNSOLD.pdf | 19 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SHREE KRISHNA ELEGANCE ARCHITECT CERTIFICATE.pdf | 15 Jul 2024 |
| Declaration in FORM BFile: Form B.pdf | 5 Jul 2021 |
| Details of encumbrancesFile: encumbrance.pdf | 1 Jul 2021 |
| Declaration about Commencement CertificateFile: cc declaration.pdf | 1 Jul 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA SHREE KRISHNA ELEGANCE-ARCHITECT CERTIFCATE.pdf | 1 Jul 2021 |
| Proforma of Allotment letterFile: Shree Krishna Final Allotment Letter.pdf | 1 Jul 2021 |
| Layout approvalFile: scan 2.pdf | 30 Jun 2021 |
| Building plan approvalFile: scan 1.pdf | 30 Jun 2021 |
| Building plan approvalFile: scan 3.pdf | 30 Jun 2021 |
| PAN CardFile: Company Pan Card.pdf | 30 Jun 2021 |
| Copy of the legal title reportFile: Shree Krishna Legal Title Report_compressed.pdf | 30 Jun 2021 |
| Copy of Layout Approval (in case of layout)File: scan 2.pdf | 30 Jun 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: scan 1.pdf | 30 Jun 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: scan 3.pdf | 30 Jun 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: cc.pdf | 30 Jun 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shree Krishna RERA_compressed.pdf | 30 Jun 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- All 51 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SHREE KRISHNA ELEGANCE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near GOKHIWARE3,200+ in Palghar
Suraksha Smart City - Phase I
Conceptual Advisory Services LLP
The Great Western Mumbai
HOABL Impactum Land Private Limited
Suraksha Smart City - Phase II
Conceptual Advisory Services LLP
Suraksha Smart City - Phase III
Conceptual Advisory Services LLP
Rashmi Star City Phase 2
Rashmi Realty Builders Pvt Ltd
Agarwal Sky Heights
Shreenath Realtors
See every Palghar project, with the district possession charts
Builder: SHREE KRISHNA CONSTRUCTION CO
SHREE KRISHNA CONSTRUCTION CO has 1 registration on MahaRERA, including SHREE KRISHNA ELEGANCE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What are my rights if SHREE KRISHNA ELEGANCE is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHREE KRISHNA ELEGANCE?
The registered promoter entity is SHREE KRISHNA CONSTRUCTION CO, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHREE KRISHNA ELEGANCE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHREE KRISHNA ELEGANCE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHREE KRISHNA ELEGANCE?
The professionals named in the filing: Architect: SANAT MEHTA AND ASSOCIATES; Engineer: SANATMEHTA AND ASSOCIATES; Engineer: Gaurav Mishra; Chartered Accountant: R D LUKAD; Chartered Accountant: R D LUKAD & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHREE KRISHNA ELEGANCE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback