SHREE GANESHA HEIGHTS

By SIDDHIVINAYAK ENTERPRISES

RG-MH-94363 · RERA P52100049450 · Last updated on MahaRERA portal: 13 Mar 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 7 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2026Possession promised7 months past this date
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
2 of 12Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 85 documents Report an error

SHREE GANESHA HEIGHTS is a Residential / Group Housing project by SIDDHIVINAYAK ENTERPRISES in Pune, Maharashtra, registered with MahaRERA as P52100049450 on 14 Feb 2023. Possession was promised by 31 Mar 2026 and is now 7 months past that date. 10 of the 12 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHREE GANESHA HEIGHTS
  • TypeResidential / Group Housing
  • Location
    • MAMURDI
    • Haveli
    • Pune
    • 412101
  • Pincode412101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100049450
  • ReraGenie IDRG-MH-94363

Builder

  • NameSIDDHIVINAYAK ENTERPRISES
  • Entity typePartnership
  • PartnersAVITA SUNIL DHOBALE, Prathmesh Anil Bankhele
  • Other registrations9 more →
  • Completed4 of 10
  • No longer live4 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

7 months past promisethis monthRegisteredFeb 2023PromisedMar 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on14 Feb 2023
  • Promised completion31 Mar 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed85 files

Current status

83%10 of 12 units booked
100.0%Work done, per cost certificate

Figures as on 13 Mar 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHREE GANESHA HEIGHTSNA6612012

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

SHREE GANESHA HEIGHTS: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 13 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed36

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots36
Closed/Covered6
Open Space30

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area424 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on6 Mar 2026

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI1025.25
Proposed, not sanctioned746 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNEW SANGAVI
Estimated costRs 2.00 cr
Cost incurredRs 2.00 cr
Work done100.0%
BuildingWingEstimatedIncurred
SHREE GANESHA HEIGHTSNARs 1.80 crRs 1.80 cr
-NARs 19.51 lakhRs 19.51 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectA SQUARE ARCHITECTS
EngineerAJ DESIGNERS
EngineerPrathmesh Anil Bankhele
Chartered AccountantPGMJ AND ASSOCIATES
Chartered AccountantMahavir H Parakh
PartnerRole in project
SIDDHIVINAYAK ENTERPRISES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Feb 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed85

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Dec 25.pdf13 Mar 2026
Withdrawal Update Form 2File: Form 2 Dec 25.pdf13 Mar 2026
Withdrawal Update Form 3File: Form 3 Dec 25.pdf13 Mar 2026
Withdrawal Update Form 1File: form 1.pdf6 Mar 2026
Withdrawal Update Form 2File: FOEM 2.pdf6 Mar 2026
Withdrawal Update Form 3File: FORM 3 Dec 25.pdf6 Mar 2026
Form 1File: FORM 1.pdf28 Nov 2025
Form 2File: FORM 2 30 06 2025.pdf28 Nov 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf28 Nov 2025
Form 3File: form 3.pdf28 Nov 2025
Form 1File: FORM 1.pdf28 Nov 2025
Form 2File: FORM 2 30 09 2025.pdf28 Nov 2025
Form 3File: FORM 3.pdf28 Nov 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf28 Nov 2025
Form 1File: FORM 1.pdf11 Sep 2025
Form 2File: FORM 2.pdf11 Sep 2025
Form 3File: FORM 3.pdf11 Sep 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY.pdf11 Sep 2025
Form 1File: FORM 1.pdf11 Sep 2025
Form 2File: FORM 2.pdf11 Sep 2025
Form 3File: FORM 3.pdf11 Sep 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf11 Sep 2025
Form 1File: FORM 1.pdf11 Sep 2025
Form 2File: FORM 2.pdf11 Sep 2025
Form 3File: FORM 3.pdf11 Sep 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf11 Sep 2025
Form 1File: FORM 1.pdf11 Sep 2025
Form 2File: FORM 2.pdf11 Sep 2025
Form 3File: FORM 3.pdf11 Sep 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf11 Sep 2025
Form 5 (FY 2022-2023)File: FORM 5 2022 2023.pdf11 Sep 2025
Form 5 (FY 2023-2024)File: FORM 5 2023 2024.pdf11 Sep 2025
Form 5 (FY 2024-2025)File: FORM 5 2024 2025.pdf11 Sep 2025
Form 1File: form 1, june 2023.pdf3 Sep 2025
Form 2File: FORM 2.pdf3 Sep 2025
Form 3File: FORM 3.pdf3 Sep 2025
Disclosure of Sold and Booked InventoryFile: sold unsold inventory.pdf3 Sep 2025
Form 1File: form 1, sep 2023.pdf3 Sep 2025
Form 2File: FORM 2.pdf3 Sep 2025
Form 3File: FORM 3.pdf3 Sep 2025
Disclosure of Sold and Booked InventoryFile: sold unsold inventory.pdf3 Sep 2025
Form 1File: Form 1.pdf3 Sep 2025
Form 3File: FORM 3.pdf3 Sep 2025
Disclosure of Sold and Booked InventoryFile: DISCOLSURE OF SOLD, BOOKED INVENTORY.pdf3 Sep 2025
Form 2File: Form 2.pdf3 Sep 2025
Form 1File: form 1.pdf3 Sep 2025
Form 3File: FORM 3.pdf3 Sep 2025
Disclosure of Sold and Booked InventoryFile: sold unsold inventory.pdf3 Sep 2025
Form 2File: FORM 2.pdf3 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1, june 2023.pdf13 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1, sep 2023.pdf13 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf13 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf13 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf13 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_compressed.pdf13 Jun 2024
Disclosure of sold/ booked inventoryFile: sold unsold inventory.pdf13 Jun 2024
Disclosure of sold/ booked inventoryFile: sold unsold inventory.pdf13 Jun 2024
Disclosure of sold/ booked inventoryFile: sold unsold inventory.pdf13 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf13 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf13 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf13 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_compressed.pdf9 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_compressed.pdf9 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf9 Mar 2024
Disclosure of sold/ booked inventoryFile: DISCOLSURE OF SOLD, BOOKED INVENTORY.pdf9 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed.pdf9 Mar 2024
Layout approvalFile: LAYOUT PLAN -1.pdf2 Feb 2023
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN -1.pdf2 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (1).pdf2 Feb 2023
CERSAI detailsFile: CERSAI_Search_Report_200259065893_For_Asset_Based_Search_31_01_2023_13_23_37_122.pdf31 Jan 2023
Copy of the legal title reportFile: LEGAL TITLE REPORT.pdf28 Jan 2023
Proforma of Agreement for saleFile: Revised Draft Shree Ganesha Heights.pdf28 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: PROMOTERS DECLARATION.pdf18 Jan 2023
Building plan approvalFile: FLOOR PLAN.pdf16 Jan 2023
PAN CardFile: firm pan.pdf16 Jan 2023
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE.pdf16 Jan 2023
Details of encumbrances concerned to LegalFile: ENCUMBRANCE.pdf16 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: FLOOR PLAN.pdf16 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf16 Jan 2023
Declaration about Commencement CertificateFile: CIRCULA 32.pdf16 Jan 2023

How this compares with Pune

83%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREE GANESHA HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MAMURDI13,700+ in Pune

2 kmSHREE GANESHA HEIGHTSCompleted 52Lapsed / revoked 29Other 70Dot size: filed unitsN

Filed coordinates, straight-line distance. 151 registered projects within 2 km.

Builder: SIDDHIVINAYAK ENTERPRISES

SIDDHIVINAYAK ENTERPRISES has 10 registrations on MahaRERA, including SILVER ARCADE and NIRMAL DHARA. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that SHREE GANESHA HEIGHTS shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SHREE GANESHA HEIGHTS is delayed beyond 31 Mar 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREE GANESHA HEIGHTS?

The registered promoter entity is SIDDHIVINAYAK ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREE GANESHA HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREE GANESHA HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREE GANESHA HEIGHTS?

The professionals named in the filing: Architect: A SQUARE ARCHITECTS; Engineer: AJ DESIGNERS; Engineer: Prathmesh Anil Bankhele; Chartered Accountant: PGMJ AND ASSOCIATES; Chartered Accountant: Mahavir H Parakh. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREE GANESHA HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREE GANESHA HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREE GANESHA HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.