SHREE GANESH GRACIA
By M/S GOBIND BUILDERS AND DEVELOPERS
RG-MH-81683 · RERA P52100052221 · Last updated on MahaRERA portal: 20 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHREE GANESH GRACIA is a Others project by M/S GOBIND BUILDERS AND DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100052221 on 31 Jul 2023. Possession is promised by 31 Dec 2026. 130 of the 132 units on this registration are recorded sold or booked, and 16 of 22 construction stages are filed complete.
At a glance
Project
- NameSHREE GANESH GRACIA
- TypeOthers
- Location
- KIWALE
- Pimpri Chinchawad (M Corp.)
- Haveli
- Pune
- 412101
- Pincode412101
- RERA no.P52100052221
- ReraGenie IDRG-MH-81683
Builder
- NameM/S GOBIND BUILDERS AND DEVELOPERS
- Entity typePartnership
- PartnersISHWAR JHAMTANI, LAL DANOMAL AGARWAL, RAJKUMAR JUMROMAL JHAMTANI, CHARANSINGH JOTUMAL JHAMTANI
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on31 Jul 2023
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings2 building records
- Documents filed116 files
Current status
Figures as on 20 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A | NA | 12 | 12 | 65 | 8 | 73 |
| B | NA | 11 | 11 | 59 | 0 | 59 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 20 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
16 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.
A73%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
B73%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 20 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed202
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| A | 101 | 101 |
| B | 101 | 101 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| A | NA | Rs 15.67 cr | Rs 15.52 cr |
| B | NA | Rs 14.24 cr | Rs 14.15 cr |
| - | NA | Rs 2.42 cr | Rs 2.37 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | YOJANA ARCHITECT |
| Engineer | Omkar Construction |
| Chartered Accountant | ANJK & Co LLP |
| Chartered Accountant | Yashkumar Santosh Soni |
| Chartered Accountant | R V Nevatia & CO |
| Partner | Role in project |
|---|---|
| M/S GOBIND BUILDERS AND DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 20 Jun 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 27 Feb 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Feb 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 27 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed116
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 116 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Withdrawal Application Form1.pdf | 20 Jul 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1.pdf | 20 Jul 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form 2.pdf | 20 Jul 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form2.pdf | 20 Jul 2026 |
| Withdrawal Update Form 3File: Withdrawal Application Form3.pdf | 20 Jul 2026 |
| Withdrawal Update Form 3File: Withdrawal Application Form3.pdf | 20 Jul 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form 1.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form 2.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: Withdrawal Application Form 3.pdf | 20 Apr 2026 |
| Form 2A (FY 2025-2026)File: Form 2A Quality Assurance Certificate.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1.pdf | 13 Feb 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form2.pdf | 13 Feb 2026 |
| Withdrawal Update Form 3File: Withdrawal Application Form3.pdf | 13 Feb 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1_June 2025_Signed.pdf | 24 Nov 2025 |
| Withdrawal Update Form 1File: Withdrawal Application Form1_September 2025_Signed.pdf | 24 Nov 2025 |
| Withdrawal Update Form 2File: Withdrawal Application Form2_June 2025_Gracia Phase I.pdf | 24 Nov 2025 |
| Withdrawal Update Form 2File: Withdrawal Application Form2_September 2025_Gracia Phase I.pdf | 24 Nov 2025 |
| Withdrawal Update Form 3File: Withdrawal Application Form3_June 2025_Signed.pdf | 24 Nov 2025 |
| Withdrawal Update Form 3File: Withdrawal Application Form3_September 2025_Signed.pdf | 24 Nov 2025 |
| Form 2A (FY 2023-2024)File: Form 2A Quality Assurance Certificate FY 2023-24_Phase I_Signed.pdf | 24 Nov 2025 |
| Form 2A (FY 2024-2025)File: Form 2A Quality Assurance Certificate FY 2024-25_Phase I_Signed.pdf | 24 Nov 2025 |
| Form 5 (FY 2023-2024)File: CA Form 5_Shree Ganesh Gracia_FY 2023-24_Signed.pdf | 18 Nov 2025 |
| Form 5 (FY 2024-2025)File: CA Form 5_Shree Ganesh Gracia_FY 2024-25_Signed.pdf | 18 Nov 2025 |
| Form 1File: Form 1 Architect Certificate - March 2025.pdf | 2 Jul 2025 |
| Form 2File: Form 2 Engineer Certificate - March 2025.pdf | 2 Jul 2025 |
| Form 3File: CA Certificate - March 25 - Sign.pdf | 2 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory - March 2025.pdf | 2 Jul 2025 |
| Withdrawal Update Form 1File: Form 1 Architect Certificate - March 2025.pdf | 2 Jul 2025 |
| Withdrawal Update Form 1File: Form 1 Architect Certificate - March 2025.pdf | 2 Jul 2025 |
| Withdrawal Update Form 2File: Form 2 Engineer Certificate.pdf | 2 Jul 2025 |
| Withdrawal Update Form 2File: Form 2 Engineer Certificate - March 2025.pdf | 2 Jul 2025 |
| Withdrawal Update Form 3File: CA Certificate - March 25 - Sign.pdf | 2 Jul 2025 |
| Withdrawal Update Form 3File: CA Certificate - March 25 - Sign.pdf | 2 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate - Sept 2024.pdf | 15 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate - Dec 2024.pdf | 15 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - Sept 24 - Sign.pdf | 15 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - December 24 - Sign.pdf | 15 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate - Sept 2024.pdf | 15 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate - Dec 2024.pdf | 15 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Sept 2024.pdf | 15 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - December 2024.pdf | 15 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf | 20 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory June 2024.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate June 24 - Sign_11zon.pdf | 20 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf | 28 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf | 24 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf | 24 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate March 24 Signed_11zon.pdf | 24 May 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf | 28 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate December 2023 Signed_compressed.pdf | 28 Feb 2024 |
| Layout approvalFile: Layout Approval.pdf | 27 Feb 2024 |
| Building plan approvalFile: A Wing 1st to 11th Floor except 8th Fl.pdf | 27 Feb 2024 |
| Building plan approvalFile: A Wing 8th Floor.pdf | 27 Feb 2024 |
| Building plan approvalFile: A Wing Elevation.pdf | 27 Feb 2024 |
| Building plan approvalFile: B Wing 1st to 10th Floor except 7th fl.pdf | 27 Feb 2024 |
| Building plan approvalFile: B Wing 7th Floor.pdf | 27 Feb 2024 |
| Building plan approvalFile: B Wing Elevation.pdf | 27 Feb 2024 |
| Copy of Layout Approval (in case of layout)File: Layout Approval.pdf | 27 Feb 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: A Wing 1st to 11th Floor except 8th Fl.pdf | 27 Feb 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: A Wing 8th Floor.pdf | 27 Feb 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: A Wing Elevation.pdf | 27 Feb 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: B Wing 1st to 10th Floor except 7th fl.pdf | 27 Feb 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: B Wing 7th Floor.pdf | 27 Feb 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: B Wing Elevation.pdf | 27 Feb 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate_compressed.pdf | 27 Feb 2024 |
| Declaration about Commencement CertificateFile: CC Declaration Signed.pdf | 27 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate.pdf | 27 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Cert.pdf | 27 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf | 18 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf | 18 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf | 18 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Signed_11zon.pdf | 18 Dec 2023 |
| Layout approvalFile: Layout Plan.pdf | 27 Nov 2023 |
| Building plan approvalFile: A Wing 1st To 9th Floor.pdf | 27 Nov 2023 |
| Building plan approvalFile: A wing 8th Floor.pdf | 27 Nov 2023 |
| Building plan approvalFile: A Wing Elivetion.pdf | 27 Nov 2023 |
| Building plan approvalFile: B Wing 1st Floor.pdf | 27 Nov 2023 |
| Building plan approvalFile: B Wing Elovetion.pdf | 27 Nov 2023 |
| Copy of Layout Approval (in case of layout)File: Layout Plan.pdf | 27 Nov 2023 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| SHREE GANESH IMPERIA | S NO 175 WAKAD PUNE | 174 | Completed | Jun 2017 | Late, Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- All 116 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SHREE GANESH GRACIA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KIWALE13,700+ in Pune
Godrej Park Greens
Godrej Skyline Developers Limited
FOREST GROVE AT GODREJ PARK GREENS
Godrej Skyline Developers Limited
Om Mangalam Samruddhi
NDG Homes LLP
PCMC EWS KIWALE
Pimpri Chinchwad Municipal Corporation
Godrej Nurture
Godrej Skyline Developers Limited
My Home Sanctuary Phase I
MAMURDI DEVELOPERS LLP
Builder: M/S GOBIND BUILDERS AND DEVELOPERS
M/S GOBIND BUILDERS AND DEVELOPERS has 1 registration on MahaRERA, including SHREE GANESH GRACIA. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if SHREE GANESH GRACIA is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHREE GANESH GRACIA?
The registered promoter entity is M/S GOBIND BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHREE GANESH GRACIA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHREE GANESH GRACIA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHREE GANESH GRACIA?
The professionals named in the filing: Architect: YOJANA ARCHITECT; Engineer: Omkar Construction; Chartered Accountant: ANJK & Co LLP; Chartered Accountant: Yashkumar Santosh Soni; Chartered Accountant: R V Nevatia & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHREE GANESH GRACIA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.