Home / Browse projects / Kolhapur, Maharashtra / SHREE DATTAKRUPA
SHREE DATTAKRUPA
By MONARCH BUILDERS & DEVELOPERS
RG-MH-15202 · RERA P53000023414 · Last updated on MahaRERA portal: 12 Dec 2024
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 61 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Kolhapur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHREE DATTAKRUPA is a Mixed project by MONARCH BUILDERS & DEVELOPERS in Kolhapur, Maharashtra, registered with MahaRERA as P53000023414 on 12 Dec 2019. Possession is promised by 31 Dec 2028. The completion date has moved by 61 months from the original filing. 0 of the 1 unit on this registration is recorded sold or booked, and 9 of 33 construction stages are filed complete.
At a glance
Project
- NameSHREE DATTAKRUPA
- TypeMixed
- Location
- Changad
- Chandgad
- Kolhapur
- 416509
- Pincode416509
- RERA no.P53000023414
- ReraGenie IDRG-MH-15202
Builder
- NameMONARCH BUILDERS & DEVELOPERS
- Entity typePartnership
- PartnersVijay dadaji Yoshod, pramod madhukar naik
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on12 Dec 2019
- Promised completion31 Dec 2028
- Revised completionRevised to 31 Dec 2028 (originally 28 Nov 2023)
- Buildings3 building records
- Documents filed45 files
Current status
Figures as on 12 Dec 2024, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A WING | NA | 6 | 0 | 0 | 0 | 0 |
| BI WING | NA | 6 | 0 | 0 | 0 | 0 |
| B2 WING | NA | 6 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 12 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 33 construction stages are filed complete across 4 buildings. The stage furthest along is Podiums (if any), at 0%.
A WING82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BI WING0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
B2 WING0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
NA Plot Without StructureNot stated
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 12 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| MONARCH BUILDERS & DEVELOPERS | Thane (M Corp.) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MS NARKARS AND ASSOCIATES |
| Architect | Meenakshi Regade |
| Engineer | V N KAMAT |
| Engineer | Vinay Patil |
| Chartered Accountant | SURESH OAK AND ASSOCIATES |
| Chartered Accountant | Shrinivas Suresh Oak |
| Chartered Accountant | Shripati Gandhi Choudhari & Co |
| Partner | Role in project |
|---|---|
| MONARCH BUILDERS & DEVELOPERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe have received additional FSI from the competent authority. Hence it will take up to Dec 2028 to complete the project.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 6 Dec 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 2 Jan 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 2 Jan 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Nov 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed45
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Declaration in FORM BFile: form_b-2028.pdf | 12 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 2019-2020.pdf | 12 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 2020-2021.pdf | 12 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Sold_Inventory.pdf | 12 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 2021-2022.pdf | 12 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 2022-2023.pdf | 12 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 2022-2023.pdf | 12 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHKITECT_CERTIFICATE_FORM_1.pdf | 6 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 30-06-2023.pdf | 6 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 30-09-2023.pdf | 6 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 31-12-2023.pdf | 6 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 31-03-2024.pdf | 6 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sep 24.pdf | 6 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 6 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 31-03-2024.pdf | 6 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-1.pdf | 13 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 13 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Mar 2020.pdf | 20 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Mar 2021.pdf | 20 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Mar 2022.pdf | 20 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Mar 2023.pdf | 20 Mar 2024 |
| Declaration in FORM BFile: Form_B_Affidiviat_MBD.pdf | 18 Mar 2024 |
| Layout approvalFile: Chandgad_Plan_Bldg_B.pdf | 2 Jan 2023 |
| Layout approvalFile: Chandgad_Plan_Bldg_A.pdf | 2 Jan 2023 |
| Building plan approval or NA orderFile: kohlapur__parmission_New.pdf | 2 Jan 2023 |
| Building plan approval or NA orderFile: Chandgad_Nagarpanchayt_parmission.pdf | 2 Jan 2023 |
| Copy of Layout Approval (in case of layout)File: Chandgad_Plan_Bldg_B.pdf | 2 Jan 2023 |
| Copy of Layout Approval (in case of layout)File: Chandgad_Plan_Bldg_A.pdf | 2 Jan 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: kohlapur__parmission_New.pdf | 2 Jan 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Chandgad_Nagarpanchayt_parmission.pdf | 2 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate.pdf | 2 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Monarch Develpers Form 3.pdf | 2 Jan 2023 |
| Copy of the legal title reportFile: LEGAL REPORT.pdf | 6 Dec 2019 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 (2).pdf | 6 Dec 2019 |
| Proforma of Allotment letterFile: SALE AGREEMENT PERFORMA.pdf | 6 Dec 2019 |
| Building plan approval or NA orderFile: layout1.pdf | 12 Nov 2019 |
| Layout approvalFile: layout1.pdf | 12 Nov 2019 |
| Details of encumbrancesFile: Details of encumbrances.pdf | 12 Nov 2019 |
| Copy of Layout Approval (in case of layout)File: layout1.pdf | 12 Nov 2019 |
| Building Plan Approval / NA Order for plotted developmentFile: layout1.pdf | 12 Nov 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: permission.pdf | 12 Nov 2019 |
| Declaration in FORM BFile: form b.pdf | 12 Nov 2019 |
| OtherFile: ARCHITECTS CERTIFICATE FORM.pdf | 12 Nov 2019 |
| PAN CardFile: PAN.pdf | 11 Nov 2019 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS_CERTIFICATE-FORM 1 (1).pdf | 11 Nov 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Kolhapur
Computed across the 880+ Kolhapur projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- All 45 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep SHREE DATTAKRUPA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Chandgad880+ in Kolhapur
HIGHSTREET CBD - TOWER A
HIGHSTREET DEVELOPERS
ELIXA PARK
AJAYSINH V DESAI BUILDERS & DEVELOPERS
GATEWAY RESIDENCIES
SIDDHIVINAYAK DEVELOPERS
24 KEYWEST EAST AND WEST AVENUE
KEYWEST INFRA
SHAMRAO SHELKE COMMERCIAL AND RESIDENTIAL COMP
TRIVENI INFRAPROJECT PVT LTD
PRATHAM PRASAD GARDENS
GURUPRASAD DEVELOPERS AND BUILDERS
See every Kolhapur project, with the district possession charts
Builder: MONARCH BUILDERS & DEVELOPERS
MONARCH BUILDERS & DEVELOPERS has 1 registration on MahaRERA, including SHREE DATTAKRUPA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Kolhapur district page.
Frequently asked questions
What are my rights if SHREE DATTAKRUPA is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHREE DATTAKRUPA?
The registered promoter entity is MONARCH BUILDERS & DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHREE DATTAKRUPA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHREE DATTAKRUPA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHREE DATTAKRUPA?
The professionals named in the filing: Architect: MS NARKARS AND ASSOCIATES; Architect: Meenakshi Regade; Engineer: V N KAMAT; Engineer: Vinay Patil; Chartered Accountant: SURESH OAK AND ASSOCIATES; Chartered Accountant: Shrinivas Suresh Oak. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHREE DATTAKRUPA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback