ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / SHLOK MANSION

Registered No litigation declared Residential / Group Housing project

SHLOK MANSION

By KBAFNA INFRAA PRAVATE LIMITED

RG-MH-06650 · RERA P99000053986 · Last updated on MahaRERA portal: 3 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Sep 2028Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 45%
0Complaints at MahaRERAon this registration
Jump to the 98 documents Report an error

SHLOK MANSION is a Residential / Group Housing project by KBAFNA INFRAA PRAVATE LIMITED in Palghar, Maharashtra, registered with MahaRERA as P99000053986 on 18 Dec 2023. Possession is promised by 15 Sep 2028.

At a glance

Project

  • NameSHLOK MANSION
  • TypeResidential / Group Housing
  • Location
    • Palghar
    • 401404
  • Pincode401404
  • RERA no.P99000053986
  • ReraGenie IDRG-MH-06650

Builder

  • NameKBAFNA INFRAA PRAVATE LIMITED
  • Entity typeCompany
  • Managing DirectorKIRTIKUMAR HEMRAJ BAFNA
  • DirectorSaroj Kirtikumar Bafna

Key dates

this monthRegisteredDec 2023PromisedSep 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on18 Dec 2023
  • Promised completion15 Sep 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed98 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Shlok Mansion A WingNA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 45%.

Shlok Mansion A Wing: 32% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure45%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 3 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area480 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Meena Prabhakar Kamat and Sweta Sanjay PaiPalghar Palghar

Approvals and building plan

Sanctioning authorityPalghar Muncipal Council
Permissible FSI1075.17
Proposed, not sanctioned1,075 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPalghar West 401404

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVastushilpassociates
EngineerSSA Consultants
Chartered AccountantBakulesh Ramji Kotecha
Chartered AccountantSIDDHARTH BHUPENDRA GOGARI
Chartered AccountantEESHA
PartnerRole in project
KBAFNA INFRAA PRAVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Oct 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Sep 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Sep 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 15 Sep 2028

Documents filed98

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 98 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1_ARCH_Q4_2025-26_Shlok Mansion.pdf3 May 2026
Form 2File: Form 2_Q4_2025-26_Eng Certificate_SM.pdf3 May 2026
Form 3File: Form 3_CA_Q4_2025-26_Shlok Mansain.pdf3 May 2026
Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY_Q4_FY2025-26_SM.pdf3 May 2026
Form 2A (FY 2024-2025)File: KBIPL SHLOK MANSION.pdf14 Feb 2026
Form 1File: Form 1_ARCH_Q3_2025-26_Shlok Mansion.pdf25 Jan 2026
Form 2File: Form 2_Q3_2025-26_Eng Certificate_SM.pdf25 Jan 2026
Form 3File: Form 3_Q3_2025-26_CA_Shlok Mansain_22012025.pdf25 Jan 2026
Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY_Q3_FY2025-26_SM.pdf25 Jan 2026
Form 1File: Form 1_ARCH_Q2_2025-26_Shlok Mansion.pdf29 Nov 2025
Form 2File: Form 2_Q2_2025-26_Eng Certificate_SM.pdf29 Nov 2025
Form 3File: Form 3_Q2_2025-26_Shlok Mansain_01112025.pdf29 Nov 2025
Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY_Q2_FY2025-26_SM.pdf29 Nov 2025
Form 5 (FY 2024-2025)File: Form5_KBIPL_ShlokMansion.pdf27 Sep 2025
Form 1File: Form 1_ARCH_Q4_2024-25_Shlok.pdf24 Aug 2025
Form 2File: Form 2_ENG_Q4_2024-25_Shlok.pdf24 Aug 2025
Form 3File: Form 3_CA_Q4_2024-25_Shlok.pdf24 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY_Q4_2024-25_Shlok.pdf24 Aug 2025
Form 1File: Form 1_ARCH_Q3_2024-25_Shlok.pdf24 Aug 2025
Form 2File: Form 2_ENG_Q3_2024-25_Shlok.pdf24 Aug 2025
Form 3File: Form 3_CA_Q3_2024-25_Shlok.pdf24 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY_Q3_2024-25_Shlok.pdf24 Aug 2025
Form 1File: Form 1_ARCH_Q2_2024-25_Shlok.pdf24 Aug 2025
Form 2File: Form 2_ENG_Q2_2024-25_Shlok.pdf24 Aug 2025
Form 3File: Form 3_CA_Q2_2024-25_Shlok.pdf24 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY_Q2_2024-25_Shlok.pdf24 Aug 2025
Form 1File: Form 1_ARCH_Q1_2024-25_Shlok.pdf24 Aug 2025
Form 2File: Form 2_ENG_Q1_2024-25_Shlok.pdf24 Aug 2025
Form 3File: Form 3_CA_Q1_2024-25_Shlok.pdf24 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY_Q1_2024-25_Shlok.pdf24 Aug 2025
Form 1File: Form 1_ARCH_Q4_2023-24_Shlok.pdf24 Aug 2025
Form 2File: Form 2_ENG_Q4_2023-24_Shlok.pdf24 Aug 2025
Form 3File: Form 3_CA_Q4_2023-24_Shlok.pdf24 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory_Q4_2023-24_Shlok.pdf24 Aug 2025
Form 1File: Form 1_ARCH_Q3_2023-24_Shlok.pdf24 Aug 2025
Form 2File: Form 2_ENG_Q3_2023-24_Shlok.pdf24 Aug 2025
Form 3File: Form 3_CA_Q3_2023-24_Shlok.pdf24 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY_Q3_2023-24_Shlok.pdf24 Aug 2025
Form 1File: Form 1_Q1_FY2025-26_Arch_Certificate_SM.pdf2 Aug 2025
Form 2File: Form 2_Q1_2025-26_Eng Certificate_SM.pdf2 Aug 2025
Form 3File: Form 3_Q1_2025-26_SM_27072025.pdf2 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY_Q1_FY2025-26_SM.pdf2 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Q4 2024-25_Arch_Certificate_SM.pdf26 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2_Eng_Certificate_SM_Q4_FY24-25.pdf26 Apr 2025
Disclosure of sold/ booked inventoryFile: Q4 FY 2024-25 SOLD INVENTORY SHLOK MANSION.pdf20 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form2_Eng_Certificate_SM_Q4_FY24-25.pdf20 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3_CA Certificate_BK_SM_Q4 2024-25 140125.pdf6 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Q3 2024-25_Arch_Certificate_SM_31122024 signed.pdf15 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2_Eng_Certificate_SM_Q3 2024-25 31122024.pdf15 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3_CA Certificate_BK_SM_Q3 2024-25 140125 Signed.pdf14 Jan 2025
Disclosure of sold/ booked inventoryFile: Q3 SOLD INVENTORY SHLOK MANSION .pdf14 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3_CACertificate_BK_SM_Q1 2024-25 26102024 oct 24 dsc signed.pdf29 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3_CACertificate_BK_SM_Q2 2024-25 26102024 signed.pdf29 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineer cert q4 shlokpdf.pdf29 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineer cert q1 24-25 shlokpdf.pdf29 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineer cert q2 24-25 shlokpdf.pdf29 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 certificate.pdf23 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 q1 shlok.pdf23 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: q2 shlok form 1shlok.pdf23 Oct 2024
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY SHLOK Q2pdf.pdf23 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 FY 2023-24 - Shlok Mansion - Sign.pdf22 Oct 2024
Disclosure of sold/ booked inventoryFile: Q1 SOLD INVENTORY SHLOK 24 25.pdf3 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3_Q4_Shlok Mansion_signed (1).pdf27 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar Ceritificate Q4 FY2023_24.pdf15 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q3 Dec 23_compressed.pdf21 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q3 Dec 23.pdf21 Mar 2024
Disclosure of sold/ booked inventoryFile: Q3 SOLD INVENTORY SHLOK.pdf21 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3_Q3_Shlok Mansion_ssigned.pdf21 Mar 2024
Details of encumbrances concerned to FinanceFile: 2 b Details of encumbrances concerned to Legal new (1).pdf7 Dec 2023
Details of encumbrances concerned to LegalFile: 2 b Details of encumbrances concerned to Legal new (1).pdf7 Dec 2023
Declaration in FORM BFile: Form B Declaration Final.pdf5 Dec 2023
Other - TechnicalFile: Architect Declaration.pdf26 Oct 2023
Other - TechnicalFile: SHLOK REGALITY PASSING DWG (1)_compressed.pdf26 Oct 2023
Other - TechnicalFile: Architect Declaration.pdf26 Oct 2023
CERSAI detailsFile: Final_Declaration_No Cersai.pdf18 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3_18_10_23.pdf14 Oct 2023
Other - TechnicalFile: Other Declaration_14_10_23_.pdf14 Oct 2023
Copy of the legal title reportFile: LEGAL TITLE REPORT SHLOK MANSION.pdf6 Oct 2023
Proforma of Agreement for saleFile: AFS.pdf5 Oct 2023
Deviation Report with respect to model copy of AgreementFile: Dev_AFS_05_10_23.pdf5 Oct 2023

How this compares with Palghar

31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHLOK MANSION on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Palghar3,200+ in Palghar

Builder: KBAFNA INFRAA PRAVATE LIMITED

KBAFNA INFRAA PRAVATE LIMITED has 1 registration on MahaRERA, including SHLOK MANSION. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if SHLOK MANSION is delayed beyond 15 Sep 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHLOK MANSION?

The registered promoter entity is KBAFNA INFRAA PRAVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHLOK MANSION?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHLOK MANSION?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHLOK MANSION?

The professionals named in the filing: Architect: Vastushilpassociates; Engineer: SSA Consultants; Chartered Accountant: Bakulesh Ramji Kotecha; Chartered Accountant: SIDDHARTH BHUPENDRA GOGARI; Chartered Accountant: EESHA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHLOK MANSION?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHLOK MANSION. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHLOK MANSION to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.