SHIV KRUPA

By SHIVAAY REALTY

RG-MH-03443 · RERA P99000021088 · Last updated on MahaRERA portal: 27 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 47 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Oct 2026Possession promisedmoved 47 months from the original
7 of 11Construction stages donefurthest along: Installation of Lifts, 95%
23 of 93Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 286 documents Report an error

SHIV KRUPA is a Others project by SHIVAAY REALTY in Palghar, Maharashtra, registered with MahaRERA as P99000021088 on 31 May 2019. Possession is promised by 28 Oct 2026. The completion date has moved by 47 months from the original filing. 70 of the 93 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHIV KRUPA
  • TypeOthers
  • Location
    • Village. Umroli
    • Gut 184/A
    • Umroli Village
    • Umroli
    • Palghar
    • 401404
  • Pincode401404
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000021088
  • ReraGenie IDRG-MH-03443

Builder

  • NameSHIVAAY REALTY
  • Entity typePartnership
  • PartnersDAYASHANKAR NATHPRASAD SHUKLA, NILESH BIRENDRA SHUKLA, RAMCHANDRA RAMDHANI YADAV, CHANDRAJEET SIDDHU YADAV

Key dates

this monthRegisteredMay 2019First promiseNov 2022Revised toOct 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 May 2019
  • Promised completion28 Oct 2026
  • Revised completionRevised to 28 Oct 2026 (originally 28 Nov 2022)
  • Buildings1 building record
  • Documents filed286 files

Current status

75%70 of 93 units booked
94.8%Work done, per cost certificate

Figures as on 27 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHIV KRUPANA94662793

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 95%.

SHIV KRUPA: 79% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 27 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed87

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots87
Closed/Covered4
Open Space83

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,249 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityDistrict Collector, Palghar
Permissible FSI3249.0
Proposed, not sanctioned3,249 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSV ROAD, DAHISAR EAST, MUMBAI-400068
Estimated costRs 6.05 cr
Cost incurredRs 5.73 cr
Work done94.77%
BuildingWingEstimatedIncurred
SHIV KRUPANARs 5.99 crRs 5.70 cr
-NARs 5.75 lakhRs 3.25 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAJAY WADE
EngineerPARESH UNNARKAR
EngineerDINESH MESHRAM
EngineerABHISHEK LENGARE
Chartered AccountantMishra Karwa & Co.
Chartered AccountantG J M S & ASSOCIATES LLP
PartnerRole in project
SHIVAAY REALTY-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000017900Nov 2022 → Oct 2025

Reason as filed by the promoterWe, the partners of Shivaay Realty, are formally requesting a one-year extension for the completion of our registered real estate project, "Shiv Krupa." The primary reasons for the project's delay include the ongoing downturn in the local real estate market within the project area and the significant escalation in construction material prices. This challenging market environment has impeded our ability to meet the initial project timeline. With the grant of a one-year extension, we are committed to diligently working towards the timely completion of Project Shiv Krupa while adhering to all rel

EXT99000012794Nov 2022 → Oct 2023

Reason as filed by the promoterConstruction industry suffered heavily due to COVID pandemic and related lockdown measures, moreover the region of Mumbai, Thane and Palghar were heavily impacted due to the highest cases in the country and also due to the extended lockdown which continued for almost over a year. Further, the restriction for communication by train to the common man hampered the movement of labours to the construction sites. Adding to the existing hardships caused due to COVID, the extreme rise in price of construction material due to inflation and wars in Ukraine has further hampered the construction industrie

EA07032620132Nov 2022 → Oct 2026

Reason as filed by the promoterShortage of Funds due to low demand: The real estate project, situated in a remote area, has faced significant challenges due to limited customer bookings, resulting in a lower-than-anticipated response from prospective buyers. This lack of adequate buyer interest adversely impacted the financial inflow required for the timely completion of the project, as the anticipated funding from customer bookings could not be realized. Despite these challenges, the promoters have demonstrated unwavering commitment to the project's completion by arranging the necessary funds through the liquidation of per

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 May 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 May 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 May 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 May 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 28 Oct 2026

Documents filed286

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 286 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2021-2022)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20).pdf27 Aug 2026
Withdrawal Update Form 1File: FORM - 1 Signed.pdf8 Aug 2026
Withdrawal Update Form 2File: FORM - 2 Signed.pdf8 Aug 2026
Withdrawal Update Form 3File: Form 3 Signed_.pdf8 Aug 2026
Withdrawal Update Form 1File: Form 1 - Q4.pdf25 Jul 2026
Withdrawal Update Form 2File: Form 2 - Q4.pdf25 Jul 2026
Withdrawal Update Form 3File: Form 3 Final.pdf25 Jul 2026
Form 5 (FY 2023-2024)File: FORM 5_ MARCH 24_ SHIVAAY REALTY.pdf9 Feb 2026
Form 5 (FY 2024-2025)File: FORM 5_ MARCH 25_ SHIVAAY REALTY.pdf9 Feb 2026
Form 1File: Declarationmaharera.pdf24 Dec 2025
Form 2File: Declarationmaharera.pdf24 Dec 2025
Form 3File: Declarationmaharera.pdf24 Dec 2025
Disclosure of Sold and Booked InventoryFile: Declarationmaharera.pdf24 Dec 2025
Form 1File: Declarationmaharera.pdf24 Dec 2025
Form 2File: Declarationmaharera.pdf24 Dec 2025
Form 3File: Declarationmaharera.pdf24 Dec 2025
Disclosure of Sold and Booked InventoryFile: Declarationmaharera.pdf24 Dec 2025
Form 1File: Declarationmaharera.pdf24 Dec 2025
Form 2File: Declarationmaharera.pdf24 Dec 2025
Form 3File: Declarationmaharera.pdf24 Dec 2025
Disclosure of Sold and Booked InventoryFile: Declarationmaharera.pdf24 Dec 2025
Form 1File: Declarationmaharera.pdf24 Dec 2025
Form 2File: Declarationmaharera.pdf24 Dec 2025
Form 3File: Declarationmaharera.pdf24 Dec 2025
Disclosure of Sold and Booked InventoryFile: Declarationmaharera.pdf24 Dec 2025
Form 1File: Architects certificate.pdf24 Dec 2025
Form 2File: Engineers certificate.pdf24 Dec 2025
Form 3File: form 3_compressed.pdf24 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold_compressed.pdf24 Dec 2025
Form 1File: Architects certificate.pdf24 Dec 2025
Form 2File: Engineers certificate.pdf24 Dec 2025
Form 3File: form 3_compressed.pdf24 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold_compressed.pdf24 Dec 2025
Form 1File: Architects certificate.pdf24 Dec 2025
Form 2File: Engineers certificate.pdf24 Dec 2025
Form 3File: form 3_compressed.pdf24 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold_compressed.pdf24 Dec 2025
Form 1File: Form 1 17-11-23.pdf24 Dec 2025
Form 2File: EngineerCertificateForm 221023.pdf24 Dec 2025
Form 3File: 7 Certificates of CA (Form 3).pdf24 Dec 2025
Disclosure of Sold and Booked InventoryFile: 5 Disclosure of sold- booked inventory.pdf24 Dec 2025
Disclosure of Sold and Booked InventoryFile: 4 Disclosure of sold- booked inventory.pdf24 Dec 2025
Form 1File: 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf24 Dec 2025
Form 2File: 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf24 Dec 2025
Form 3File: 5 Certificates of CA (Form 3).pdf24 Dec 2025
Form 1File: Form 1 30_9_2024.pdf24 Dec 2025
Form 2File: Engineers Certificate Form 2 10-12-24.pdf24 Dec 2025
Form 3File: Form 3 Q2 2024-25.pdf24 Dec 2025
Disclosure of Sold and Booked InventoryFile: Signed Sold and Unsold Shivaay Realty.pdf24 Dec 2025
Form 1File: Form 1 30_9_2024.pdf24 Dec 2025
Form 2File: Engineers Certificate Form 2 10-12-24.pdf24 Dec 2025
Form 3File: Form 3 Q2 18-12-24.pdf24 Dec 2025
Disclosure of Sold and Booked InventoryFile: Discolsure of sold Booked inventory.pdf24 Dec 2025
Withdrawal Update Form 1File: Form - 1 Completion Certificate of Construction as on 30-09-2025.pdf24 Dec 2025
Withdrawal Update Form 1File: Form - 1 Completion Certificate of Construction as on 30-09-2025.pdf24 Dec 2025
Withdrawal Update Form 1File: Form - 1 Completion Certificate of Construction as on 30-09-2025.pdf24 Dec 2025
Withdrawal Update Form 1File: Form - 1 Completion Certificate of Construction as on 30-09-2025.pdf24 Dec 2025
Withdrawal Update Form 1File: Form - 1 Completion Certificate of Construction as on 30-09-2025.pdf24 Dec 2025
Withdrawal Update Form 1File: Form - 1 Completion Certificate of Construction as on 30-09-2025.pdf24 Dec 2025
Withdrawal Update Form 1File: Form - 1 Completion Certificate of Construction as on 30-09-2025.pdf24 Dec 2025
Withdrawal Update Form 1File: Form - 1 Completion Certificate of Construction as on 30-09-2025.pdf24 Dec 2025
Withdrawal Update Form 1File: Form - 1 Completion Certificate of Construction as on 30-09-2025.pdf24 Dec 2025
Withdrawal Update Form 1File: Form - 1 Completion Certificate of Construction as on 30-09-2025.pdf24 Dec 2025
Withdrawal Update Form 1File: Form - 1 Completion Certificate of Construction as on 30-09-2025.pdf24 Dec 2025
Withdrawal Update Form 1File: Form - 1 Completion Certificate of Construction as on 30-09-2025.pdf24 Dec 2025
Withdrawal Update Form 1File: Form - 1 Completion Certificate of Construction as on 30-09-2025.pdf24 Dec 2025
Withdrawal Update Form 1File: Form - 1 Completion Certificate of Construction as on 30-09-2025.pdf24 Dec 2025
Withdrawal Update Form 1File: Form - 1 Completion Certificate of Construction as on 30-09-2025.pdf24 Dec 2025
Withdrawal Update Form 1File: Form - 1 Completion Certificate of Construction as on 30-09-2025.pdf24 Dec 2025
Withdrawal Update Form 1File: Form - 1 Completion Certificate of Construction as on 30-09-2025.pdf24 Dec 2025
Withdrawal Update Form 1File: Form - 1 Completion Certificate of Construction as on 30-09-2025.pdf24 Dec 2025
Withdrawal Update Form 1File: Form - 1 Completion Certificate of Construction as on 30-09-2025.pdf24 Dec 2025
Withdrawal Update Form 1File: Form - 1 Completion Certificate of Construction as on 30-09-2025.pdf24 Dec 2025
Withdrawal Update Form 1File: Form - 1 Completion Certificate of Construction as on 30-09-2025.pdf24 Dec 2025
Withdrawal Update Form 1File: Form - 1 Completion Certificate of Construction as on 30-09-2025.pdf24 Dec 2025
Withdrawal Update Form 1File: Form - 1 Completion Certificate of Construction as on 30-09-2025.pdf24 Dec 2025
Withdrawal Update Form 1File: Form - 1 Completion Certificate of Construction as on 30-09-2025.pdf24 Dec 2025
Withdrawal Update Form 1File: Form - 1 Completion Certificate of Construction as on 30-09-2025.pdf24 Dec 2025
Withdrawal Update Form 1File: Form - 1 Completion Certificate of Construction as on 30-09-2025.pdf24 Dec 2025
Withdrawal Update Form 1File: Form - 1 Completion Certificate of Construction as on 30-09-2025.pdf24 Dec 2025

How this compares with Palghar

75%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one moved by 47 months
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHIV KRUPA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Gut 184/A , Umroli Village3,200+ in Palghar

2 kmSHIV KRUPACompleted 13Lapsed / revoked 28Other 34Dot size: filed unitsN

Filed coordinates, straight-line distance. 75 registered projects within 2 km.

Builder: SHIVAAY REALTY

SHIVAAY REALTY has 1 registration on MahaRERA, including SHIV KRUPA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if SHIV KRUPA is delayed beyond 28 Oct 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHIV KRUPA?

The registered promoter entity is SHIVAAY REALTY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHIV KRUPA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHIV KRUPA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHIV KRUPA?

The professionals named in the filing: Architect: AJAY WADE; Engineer: PARESH UNNARKAR; Engineer: DINESH MESHRAM; Engineer: ABHISHEK LENGARE; Chartered Accountant: Mishra Karwa & Co.; Chartered Accountant: G J M S & ASSOCIATES LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHIV KRUPA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHIV KRUPA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHIV KRUPA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.