Home / Browse projects / Pune, Maharashtra / SHALIGRAM SKY

Registered No litigation declared Residential / Group Housing project

SHALIGRAM SKY

By SHALIGRAM REALTY LLP

RG-MH-22802 · RERA P52100033364 · Last updated on MahaRERA portal: 14 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 28 months
  • 1 extension taken
  • Rs 60.00 crore secured on the land, in favour of BAJAJ HOUSING FINANCE LIMITED

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedmoved 28 months from the original
38 of 66Construction stages doneacross 6 buildings; furthest along: Slabs of Super Structure, 95%
299 of 653Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 143 documents Report an error

SHALIGRAM SKY is a Residential / Group Housing project by SHALIGRAM REALTY LLP in Pune, Maharashtra, registered with MahaRERA as P52100033364 on 16 Feb 2022. Possession is promised by 31 Dec 2028. The completion date has moved by 28 months from the original filing. 354 of the 653 units on this registration are recorded sold or booked, and 38 of 66 construction stages are filed complete.

At a glance

Project

  • NameSHALIGRAM SKY
  • TypeResidential / Group Housing
  • Location
    • SR. NO. 95/1/2
    • KATALE WASTI
    • KIWALE
    • Ravet
    • Haveli
    • Pune
    • 412101
  • Pincode412101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100033364
  • ReraGenie IDRG-MH-22802

Builder

  • NameSHALIGRAM REALTY LLP
  • Entity typePartnership
  • PartnersSURESH MOHANBHAI MEGHANI, RASIK MAGANBHAI ROKAD, KAPILKUMAR DINESHBHAI PATEL, YOGESH DNYANESWAR CHINCHWADE, TUSHAR CHANDUBHAI PATEL, MARUTI DEEPAK MORE, AMAN BALWANT PATEL
  • Other registrations1 more →
  • Declared earlier projects2 →

Key dates

this monthRegisteredFeb 2022First promiseAug 2026Revised toDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 Feb 2022
  • Promised completion31 Dec 2028
  • Revised completionRevised to 31 Dec 2028 (originally 30 Aug 2026)
  • Buildings6 building records
  • Documents filed143 files

Current status

54%354 of 653 units booked
57.9%Work done, per cost certificate

Figures as on 14 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A BUILDINGNA44549
D BUILDINGNA22181440144
E BUILDINGNA22181440144
B - BUILDINGNA22181440144
C - BUILDINGNA22181440144
F - BUILDINGNA201664468

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 14 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

38 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Slabs of Super Structure, at 95%.

A BUILDING82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
D BUILDING91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
E BUILDING91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B - BUILDING35%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises5%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C - BUILDING42%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises45%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
F - BUILDING44%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises55%
Sanitary Fittings within the flats / premises5%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 14 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed890

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots890
Closed/Covered665
Open Space225
BuildingClosed/CoveredOpen SpaceTotal
A BUILDING505
D BUILDING15053203
E BUILDING15054204
B - BUILDING15053203
C - BUILDING15053203
F - BUILDING601272

Land and ownership9

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area15,900 sq m
Land owned byThe promoter, with other names on the file
Named landowners9
Encumbrance on the landDeclared present
Charge in favour ofBAJAJ HOUSING FINANCE LIMITED
Secured amountRs 60.00 crore
CERSAI search filedYes
Declared on16 Oct 2025
LandownerVillageDistrict
MORESHWAR RAMBHAU KATALERavetPune
GANESH NANASAHEB KATALERavetPune
VISHAL CHINTAMAN KATALERavetPune
BHALCHANDRA NANASAHEB KATALERavetPune
RAMESH NANASAHEB KATALERavetPune
TUSHAR CHINTAMAN KATALERavetPune
VIKASH CHINTAMAN KATALERavetPune
HARIBHAU RAMBHAU KATALERavetPune
PRAKASH RAMBHAU KATALERavetPune

Approvals and building plan

Sanctioning authorityPimpri-Chinchwad Municipal Corporation
Permissible FSI60697.5
Proposed, not sanctioned13,484 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd Shop No 1 Part Ballina Sector No 29 Plot No SDC-2 Ravet Pradhikaran Pune 412101
Estimated costRs 214.20 cr
Cost incurredRs 124.01 cr
Work done57.9%
BuildingWingEstimatedIncurred
A BUILDINGNARs 34.20 crRs 20.67 cr
D BUILDINGNARs 34.20 crRs 20.67 cr
E BUILDINGNARs 34.20 crRs 20.67 cr
B - BUILDINGNARs 34.20 crRs 20.67 cr
C - BUILDINGNARs 34.20 crRs 20.67 cr
F - BUILDINGNARs 34.20 crRs 20.67 cr
-NARs 9.00 cr-

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMehul Shah
EngineerSK Consultants & Engineers
EngineerS K Consultants & Engineers
EngineerMohit Jayant Shinde
EngineerRutuj Rajaram Chinchwade
Chartered AccountantNB Sayed & Associates
Chartered AccountantRutuja Narsingh & Associates
PartnerRole in project
SHALIGRAM REALTY LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA28052621140Aug 2026 → Dec 2028

Reason as filed by the promoterThe project completion and submission of this request have experienced delays primarily on account of procurement challenges, financial constraints, and certain site-related operational issues. These factors have impacted the overall execution timeline and resulted in a revised pace of work. However, necessary corrective measures are now being implemented to streamline procurement, strengthen financial planning, and resolve site-level bottlenecks to ensure steady progress of the remaining work. We are now actively focused on accelerating the balance construction activities and coordinating wit

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Dec 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Apr 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed143

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 143 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Shaligram_Sky_Form1_Q1_2026-27_08-07-2026_07-42.pdf14 Jul 2026
Withdrawal Update Form 2File: Shaligram_Sky_Form2_Q1_2026-27_14-07-2026_12-37.pdf14 Jul 2026
Withdrawal Update Form 3File: Shaligram_Sky_Form3_Q1_2026-27_14-07-2026_11-25_doc1.pdf14 Jul 2026
Form 2A (FY 2025-2026)File: Shaligram Sky Form 2A (FY 2025-26).pdf14 Jul 2026
Form 2A (FY 2021-2022)File: Form 2A 21-22 Shaligram Sky.pdf8 Jul 2026
Form 5 (FY 2024-2025)File: Form 5 of Shaligram Sky for FY 2024-25.pdf8 Jun 2026
Withdrawal Update Form 1File: Form 1 - Shaligram Sky as on Dec 2025.pdf4 May 2026
Withdrawal Update Form 1File: Form 1 - Shaligram Sky as on March 2026.pdf4 May 2026
Withdrawal Update Form 1File: Form 1 - Shaligram Sky as on March 2026.pdf4 May 2026
Withdrawal Update Form 2File: Form 2 - Shaligram Sky as on March 2026.pdf4 May 2026
Withdrawal Update Form 2File: Form 2 - Shaligram Sky as on March 2026.pdf4 May 2026
Withdrawal Update Form 2File: Form 2 - Shaligram Sky as on March 2026.pdf4 May 2026
Withdrawal Update Form 3File: Form 3 - Shaligram Sky as on Dec 2025.pdf4 May 2026
Withdrawal Update Form 3File: Form 3 - Shaligram Sky as on March 2026.pdf4 May 2026
Withdrawal Update Form 3File: Form 3 - Shaligram Sky as on March 2026.pdf4 May 2026
Withdrawal Update Form 1File: Form 1 - Shaligram Sky as on Sep 2025.pdf19 Jan 2026
Withdrawal Update Form 1File: Form 2 - Shaligram Sky as on Dec 2025.pdf19 Jan 2026
Withdrawal Update Form 2File: Form 2 - Shaligram Sky as on Sep 2025.pdf19 Jan 2026
Withdrawal Update Form 2File: Form 2 - Shaligram Sky as on Dec 2025.pdf19 Jan 2026
Withdrawal Update Form 3File: Form 3 - Shaligram Sky as on Sep 2025.pdf19 Jan 2026
Withdrawal Update Form 3File: Form 3 - Shaligram Sky as on Dec 2025.pdf19 Jan 2026
Form 1File: Form 1 - Shaligram Sky as on June 2025.pdf11 Aug 2025
Form 2File: Form 2 - Shaligram Sky as on June 2025.pdf11 Aug 2025
Form 3File: Form 3 of Shaligram Sky as on June 2025.pdf11 Aug 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Shaligram Sky as on June 2025.pdf11 Aug 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sep 2022.pdf3 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sep 2023.pdf3 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Dec 2023.pdf3 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - March 2024.pdf3 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Shaligram Sky as on March 2025.pdf3 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Previously Updated.pdf3 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shaligram Sky as on March 2025.pdf3 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Previously Updated.pdf3 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - 21-22.pdf3 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - 22-23.pdf3 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - 23-24.pdf3 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shaligram Sky as on March 2025.pdf19 Apr 2025
Layout approvalFile: 1.pdf18 Apr 2025
Building plan approvalFile: 2.pdf18 Apr 2025
Building plan approvalFile: 3.pdf18 Apr 2025
Building plan approvalFile: 4.pdf18 Apr 2025
Building plan approvalFile: 5.pdf18 Apr 2025
Building plan approvalFile: 6.pdf18 Apr 2025
Building plan approvalFile: 7.pdf18 Apr 2025
Building plan approvalFile: 8.pdf18 Apr 2025
Building plan approvalFile: 9.pdf18 Apr 2025
Building plan approvalFile: 10.pdf18 Apr 2025
Building plan approvalFile: 11.pdf18 Apr 2025
Building plan approvalFile: 12.pdf18 Apr 2025
Building plan approvalFile: 13.pdf18 Apr 2025
Building plan approvalFile: 14.pdf18 Apr 2025
Building plan approvalFile: 15.pdf18 Apr 2025
Copy of Layout Approval (in case of layout)File: 1.pdf18 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf18 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 15.pdf18 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 14.pdf18 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 13.pdf18 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 12.pdf18 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 11.pdf18 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 10.pdf18 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 9.pdf18 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 8.pdf18 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 7.pdf18 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 6.pdf18 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 5.pdf18 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 4.pdf18 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf18 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1_11zon.pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3-Q3_11zon.pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2-B-C-D-E-F Wing_11zon.pdf24 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD_11zon.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE - FORM-1_11zon.pdf22 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3_11zon.pdf22 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE - FORM-2_11zon.pdf22 Oct 2024
Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD SUMMERY_11zon.pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1- QUERTER ENDED-31-3-2024.pdf24 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2- QUERTER ENDED-31-3-2024_11zon.pdf24 May 2024
Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD ANNEXTURE-A_11zon.pdf24 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3-QUERTER ENDED-31-3-2024.pdf24 May 2024

How this compares with Pune

54%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 28 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHALIGRAM SKY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KIWALE13,700+ in Pune

2 kmSHALIGRAM SKYCompleted 79Lapsed / revoked 42Other 113Dot size: filed unitsN

Filed coordinates, straight-line distance. 234 registered projects within 2 km.

Builder: SHALIGRAM REALTY LLP

SHALIGRAM REALTY LLP has 2 registrations on MahaRERA, including SHALIGRAM SKY and SHALIGRAM PAVILLIA. Its filings disclose 2 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SHALIGRAM SKY is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHALIGRAM SKY?

The registered promoter entity is SHALIGRAM REALTY LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHALIGRAM SKY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHALIGRAM SKY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHALIGRAM SKY?

The professionals named in the filing: Architect: Mehul Shah; Engineer: SK Consultants & Engineers; Engineer: S K Consultants & Engineers; Engineer: Mohit Jayant Shinde; Engineer: Rutuj Rajaram Chinchwade; Chartered Accountant: NB Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHALIGRAM SKY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHALIGRAM SKY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHALIGRAM SKY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.