SEASONS

By SHIV SAMARTH ENTERPRISES

RG-MH-18076 · RERA P99000066568 · Last updated on MahaRERA portal: 17 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2032Possession promisedno revision filed
3 of 33Construction stages doneacross 3 buildings; furthest along: Stilt Floor, 95%
102 of 271Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 82 documents Report an error

SEASONS is a Residential / Group Housing project by SHIV SAMARTH ENTERPRISES in Palghar, Maharashtra, registered with MahaRERA as P99000066568 on 11 Jun 2024. Possession is promised by 31 Dec 2032. 169 of the 271 units on this registration are recorded sold or booked, and 3 of 33 construction stages are filed complete.

At a glance

Project

  • NameSEASONS
  • TypeResidential / Group Housing
  • Location
    • CHANDRAPADA
    • NAIGOAN EAST
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401208
  • Pincode401208
  • RERA no.P99000066568
  • ReraGenie IDRG-MH-18076

Builder

  • NameSHIV SAMARTH ENTERPRISES
  • Entity typePartnership
  • PartnersMADEVA VASHRAM GAMI, RATANSHI NARSHI PATEL, RATILAL MAVJI RAVARIYA

Key dates

this monthRegisteredJun 2024PromisedDec 2032

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Jun 2024
  • Promised completion31 Dec 2032
  • Revised completionNone
  • Buildings3 building records
  • Documents filed82 files

Current status

62%169 of 271 units booked
21.3%Work done, per cost certificate

Figures as on 17 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SPRINGS -BUILDING NO 1 A WINGNA25252690269
AUTUMN - BUILDING NO 1 B WINGNA31101
WINTER - BUILDING NO 1 C WINGNA31101

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 17 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Stilt Floor, at 95%.

SPRINGS -BUILDING NO 1 A WING46%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor95%
Slabs of Super Structure62%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
AUTUMN - BUILDING NO 1 B WING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WINTER - BUILDING NO 1 C WING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 17 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes40%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed110

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots110
Closed/Covered110
BuildingClosed/CoveredTotal
SPRINGS -BUILDING NO 1 A WING9494
AUTUMN - BUILDING NO 1 B WING1010
WINTER - BUILDING NO 1 C WING66

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,976 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on9 Jan 2026

Approvals and building plan

Sanctioning authorityVASAI VIRAR CITY MUNICIPAL CORPORATION
Permissible FSI40875.71
Proposed, not sanctioned15,361 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSME BRANCH,VASHI TURBHE,DEVGIRI BANKING COMPLEX,PHASE II,SECTOR 19-C,VASHI TURBHE,NAVI MUMBAI-400703
Estimated costRs 75.90 cr
Cost incurredRs 16.16 cr
Work done21.29%
BuildingWingEstimatedIncurred
SPRINGS -BUILDING NO 1 A WINGNARs 51.74 crRs 16.16 cr
-NARs 11.54 cr-
AUTUMN - BUILDING NO 1 B WINGNARs 7.39 cr-
WINTER - BUILDING NO 1 C WINGNARs 5.23 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectWE DESIGN
EngineerFRAMES
Chartered AccountantACG & ASSOCIATES
Chartered AccountantSTR AND ASSOCIATES
PartnerRole in project
SHIV SAMARTH ENTERPRISES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Apr 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2032

Documents filed82

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2024-2025)File: Form 2A FY_2024 -25.pdf17 Jun 2026
Form 2A (FY 2025-2026)File: Form 2A FY_2025-26.pdf17 Jun 2026
Withdrawal Update Form 1File: FORM 1 - MAR 2026.pdf29 May 2026
Withdrawal Update Form 2File: FORM 2 - MAR 2026.pdf29 May 2026
Withdrawal Update Form 3File: FORM 3 - SEASONS BLDG NO 1ABC_MAR 26-SIGNED.pdf29 May 2026
Withdrawal Update Form 1File: FORM 1 - DEC 2025.pdf3 Feb 2026
Withdrawal Update Form 2File: FORM 2 - DEC 2025.pdf3 Feb 2026
Withdrawal Update Form 3File: FORM 3 - SEASONS BLDG NO 1ABC_DEC 25-SIGNED.pdf3 Feb 2026
Withdrawal Update Form 1File: FORM 1 - DEC 2025.pdf24 Jan 2026
Withdrawal Update Form 2File: FORM 2 - DEC 2025.pdf24 Jan 2026
Withdrawal Update Form 3File: FORM 3 - SEASONS BLDG NO 1ABC_DEC 25-SIGNED.pdf24 Jan 2026
Withdrawal Update Form 1File: FORM 1 - SEP 2025.pdf12 Nov 2025
Withdrawal Update Form 2File: FORM 2 - SEP 2025.pdf12 Nov 2025
Withdrawal Update Form 3File: FORM 3 - SEASONS BLDG NO 1ABC_SEP 25-SIGNED.pdf12 Nov 2025
Form 1File: FORM 1.pdf30 Sep 2025
Form 2File: FORM 2.pdf30 Sep 2025
Form 3File: Form 3_Seasons_Dec 24-signed.pdf30 Sep 2025
Disclosure of Sold and Booked InventoryFile: Document1.pdf30 Sep 2025
Form 1File: FORM 1_ARCH CERT.pdf30 Sep 2025
Form 2File: FORM 2_ENG CERT.pdf30 Sep 2025
Form 3File: FORM 3_Q2 SEP 24_SEASONS - SIGNED.pdf30 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold and Unsold Inventory.pdf30 Sep 2025
Form 1File: FORM-1_ARCH CERT.pdf30 Sep 2025
Form 2File: FORM 2_ENGINEER CERTIFICATE.pdf30 Sep 2025
Form 3File: FORM 3 _SEASONS SIGNED - converted.pdf30 Sep 2025
Disclosure of Sold and Booked InventoryFile: Document1.pdf30 Sep 2025
Form 1File: FORM 1.pdf29 Jul 2025
Form 2File: FORM 2.pdf29 Jul 2025
Form 3File: FORM 3 - SEASONS BLDG NO 1ABC_JUNE 25 - SIGNED.pdf29 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold & Unsold Inventory.pdf29 Jul 2025
Form 1File: FORM 1_JAN - MAR 2025.pdf29 May 2025
Form 2File: FORM 2_JAN - MAR 2025.pdf29 May 2025
Form 3File: FORM 3- SEASONS BLDG NO 1ABC_JAN - MAR 25-SIGNED.pdf29 May 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventory - converted.pdf29 May 2025
OthersFile: Project Completed Report.pdf29 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sign.pdf5 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Seasons_Dec 24-signed.pdf3 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3- SEASONS BLDG NO 1ABC_MAR 25-SIGNED.pdf3 May 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory - converted.pdf24 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engeenier Certificate(16-04-2025).pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sign.pdf27 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Sign.pdf27 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ARCH CERT.pdf20 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_QE SEP 23_SEASONS CA SIGNED.pdf20 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_ENG CERT.pdf20 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold and Unsold Inventory Report-New.pdf20 Dec 2024
Copy of the legal title reportFile: LAND PLOT AREA DECLARATION.pdf21 May 2024
Details of encumbrances concerned to FinanceFile: DECLARATION FOR SNO.pdf26 Apr 2024
Details of encumbrances concerned to LegalFile: DECLARATION FOR SNO.pdf26 Apr 2024
CERSAI detailsFile: DECLARATION FOR SNO.pdf26 Apr 2024
Proforma of Allotment letterFile: Allotment letter as per RERA- Shiv Samarth.pdf26 Apr 2024
Other - FinanceFile: DECLARATION FOR SNO.pdf26 Apr 2024
Copy of the legal title reportFile: legal title report hl - converted.pdf25 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 _SEASONS SIGNED - converted.pdf5 Apr 2024
Deviation Report with respect to Allotment letterFile: DEVIATION ALLOTMENT LETTER.pdf4 Apr 2024
Deviation Report with respect to model copy of AgreementFile: Deviation report model sale agreement .pdf4 Apr 2024
Other - TechnicalFile: LAND PLOT AREA DECLARATION.pdf4 Apr 2024
Other - TechnicalFile: ONE PLOT DECLARATION ANNEXURE A - REVISED.pdf4 Apr 2024
Building plan approvalFile: BUILDING PROPOSAL SHEET-BLDG NO 1 WING A HL.pdf2 Apr 2024
Building plan approvalFile: BUILDING PROPOSAL SHEET-BLDG NO 1 WING B HL.pdf2 Apr 2024
Building plan approvalFile: BUILDING PROPOSAL SHEET-BLDG NO 1 WING C HL.pdf2 Apr 2024
Details of encumbrances concerned to FinanceFile: DECLARATION_FINANCE.pdf2 Apr 2024
Details of encumbrances concerned to FinanceFile: DECLARATION_LEGAL.pdf2 Apr 2024
Details of encumbrances concerned to LegalFile: DECLARATION_FINANCE.pdf2 Apr 2024
Details of encumbrances concerned to LegalFile: DECLARATION_LEGAL.pdf2 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PROPOSAL SHEET-BLDG NO 1 WING A HL.pdf2 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PROPOSAL SHEET-BLDG NO 1 WING B HL.pdf2 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PROPOSAL SHEET-BLDG NO 1 WING C HL.pdf2 Apr 2024
Declaration about Commencement CertificateFile: CC DECLARATION.pdf2 Apr 2024
Declaration in FORM BFile: FORM B -AFFIDAVIT CUM DECLARATION - converted.pdf2 Apr 2024
CERSAI detailsFile: CERSAI.pdf2 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A - RATANSHI PATEL.pdf2 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A- MADEVA GAMI.pdf2 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A- RATILAL.pdf2 Apr 2024
Layout approvalFile: 31-01-2024-LAYOUT SHEET -HL.pdf31 Mar 2024
Copy of Layout Approval (in case of layout)File: 31-01-2024-LAYOUT SHEET -HL.pdf31 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: CC - HL.pdf31 Mar 2024
Proforma of Agreement for saleFile: RERA DRAFT SHIV SAMARTHA ENTERPRISES MADEVA GAMI.pdf31 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK FORMAT.pdf31 Mar 2024
Other - LegalFile: 7 12 FOR SNO 85-1 4(HL).pdf31 Mar 2024

How this compares with Palghar

62%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SEASONS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NAIGOAN EAST3,200+ in Palghar

Builder: SHIV SAMARTH ENTERPRISES

SHIV SAMARTH ENTERPRISES has 1 registration on MahaRERA, including SEASONS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if SEASONS is delayed beyond 31 Dec 2032?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SEASONS?

The registered promoter entity is SHIV SAMARTH ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SEASONS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SEASONS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SEASONS?

The professionals named in the filing: Architect: WE DESIGN; Engineer: FRAMES; Chartered Accountant: ACG & ASSOCIATES; Chartered Accountant: STR AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SEASONS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SEASONS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SEASONS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.