ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / SAVANNA HILLS

Registered No litigation declared Residential / Group Housing project

SAVANNA HILLS

By BHALERAO BROTHERS AND ASSOCIATES

RG-MH-09161 · RERA P52100002361 · Last updated on MahaRERA portal: 24 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 72 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 72 months from the original
6 of 11Construction stages donefurthest along: Slabs of Super Structure, 70%
10 of 74Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 131 documents Report an error

SAVANNA HILLS is a Residential / Group Housing project by BHALERAO BROTHERS AND ASSOCIATES in Pune, Maharashtra, registered with MahaRERA as P52100002361 on 31 Jul 2017. Possession is promised by 31 Dec 2027. The completion date has moved by 72 months from the original filing. 64 of the 74 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameSAVANNA HILLS
  • TypeResidential / Group Housing
  • Location
    • TALEGAON STATION
    • Bavadhan BK
    • Mulshi
    • Pune
    • 411021
  • Pincode411021
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100002361
  • ReraGenie IDRG-MH-09161

Builder

  • NameBHALERAO BROTHERS AND ASSOCIATES
  • Entity typePartnership
  • PartnersKETAN AJIT BHALERAO, BHARATI SANJAY BHALERAO, AJIT WAMANRAO BHALERAO

Key dates

this monthRegisteredJul 2017First promiseDec 2021Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Jul 2017
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 30 Dec 2021)
  • Buildings1 building record
  • Documents filed131 files

Current status

86%64 of 74 units booked
61.9%Work done, per cost certificate

Figures as on 24 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SAVANNAH HILLS PHASE 1NA131374074

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 70%.

SAVANNAH HILLS PHASE 1: 65% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 24 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes50%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed321

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots321
Closed/Covered108
Open Space213

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,441 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on6 Feb 2026

Approvals and building plan

Sanctioning authorityPUNE METROPOLITAN REGIONAL DEVELOPMENT AUTHORITY , PUNE
Permissible FSI4418.12
Proposed, not sanctioned4,163 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJANGLI MAHARAJ ROAD, DECCAN GYMKHANA, PUNE 411004
Estimated costRs 34.48 cr
Cost incurredRs 21.34 cr
Work done61.88%
BuildingWingEstimatedIncurred
SAVANNAH HILLS PHASE 1NARs 17.24 crRs 10.67 cr
-NARs 17.24 crRs 10.67 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectROHIt dasnurkar
EngineerPRADEEP PATIL
EngineerAnil Ranadive
Chartered AccountantSANJAY BHALERAO
PartnerRole in project
BHALERAO BROTHERS AND ASSOCIATES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100027166Dec 2021 → Dec 2027

Reason as filed by the promoter"The final completion is pending; therefore, we need an extension. In the future, we will be conducting a project revision.".Eextention date 31/12/2027

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 May 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 May 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 17 May 2023

Documents filed131

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 131 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1_Architech Certificate_January 2026 to February 2026.pdf24 Jun 2026
Withdrawal Update Form 2File: Form 2_Engineer Certificate__January 2026 to February 2026.pdf24 Jun 2026
Withdrawal Update Form 3File: FORM 3 W.pdf24 Jun 2026
Withdrawal Update Form 1File: Form 1_Architech Certificate_January 2026 to February 2026.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2_Engineer Certificate__January 2026 to February 2026.pdf20 Apr 2026
Withdrawal Update Form 3File: Form 3_CA Certificate__January 2026 to February 2026.pdf20 Apr 2026
Form 1File: Form 1_Architech Certificate_October 2025 to December 2025.pdf17 Jan 2026
Form 2File: Form 2_Engineer Certificate_October 2025 to December 2025.pdf17 Jan 2026
Form 3File: Form 3_CA Certificate_October 2025 to December 2025_compressed.pdf17 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold-Unsold List_October 2025 to December 2025.pdf17 Jan 2026
Form 1File: Form 1_Architech Certificate_July 2025 to September 2025.pdf28 Nov 2025
Form 2File: Form 2_Engineer Certificate_July 2025 to September 2025.pdf28 Nov 2025
Form 3File: Form 3_CA Certificate_July 2025 to September 2025_compressed.pdf28 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold-Unsold List_July 2025 to September 2025.pdf28 Nov 2025
Form 1File: Form 1_Architech Certificate_April 2025 to June 2025.pdf19 Jul 2025
Form 2File: f2.pdf19 Jul 2025
Form 3File: Form 3_CA Certificate_April 2025 to June 2025.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold-Unsold List_April 2025 to June 2025.pdf19 Jul 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARC.pdf24 May 2025
Certificates of CA (Form 3)File: CA (2).pdf24 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG.pdf24 May 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf24 May 2025
Layout approvalFile: Layout plan-compressed.pdf2 May 2025
Building plan approvalFile: Floor plan 1-compressed-1.pdf2 May 2025
Building plan approvalFile: Floor Plan 2-compressed.pdf2 May 2025
Building plan approvalFile: Floor plan 3-compressed.pdf2 May 2025
Building plan approvalFile: Floor plan 4-compressed.pdf2 May 2025
Copy of Layout Approval (in case of layout)File: Layout plan-compressed.pdf2 May 2025
Building Plan Approval (IOD)File: Floor plan 1-compressed-1.pdf2 May 2025
Building Plan Approval (IOD)File: Floor Plan 2-compressed.pdf2 May 2025
Building Plan Approval (IOD)File: Floor plan 3-compressed.pdf2 May 2025
Building Plan Approval (IOD)File: Floor plan 4-compressed.pdf2 May 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: format a.pdf26 Mar 2025
Declaration in FORM BFile: FORM B.pdf14 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30062024.pdf14 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30092024.pdf14 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30122024.pdf14 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30122024.pdf14 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30092024.pdf14 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30062024.pdf14 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30032024.pdf14 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30122023.pdf14 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30092023.pdf14 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30062023.pdf14 Jan 2025
Disclosure of sold/ booked inventoryFile: 30062024.pdf14 Jan 2025
Disclosure of sold/ booked inventoryFile: 30092024.pdf14 Jan 2025
Disclosure of sold/ booked inventoryFile: 30122024.pdf14 Jan 2025
Other - TechnicalFile: ANNEXURE.pdf14 Jan 2025
Certificates of CA (Form 3)File: 30122024.pdf11 Jan 2025
Certificates of CA (Form 3)File: 30092024.pdf11 Jan 2025
Certificates of CA (Form 3)File: 30062024.pdf11 Jan 2025
Certificates of CA (Form 3)File: 30032024.pdf11 Jan 2025
Certificates of CA (Form 3)File: 30122023.pdf11 Jan 2025
Certificates of CA (Form 3)File: 30062023.pdf11 Jan 2025
Certificates of CA (Form 3)File: 30092023.pdf11 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30062023.pdf9 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30092023.pdf9 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30122023.pdf9 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30032024.pdf9 Jan 2025
Certificates of CA (Form 3)File: 30032024.pdf9 Jan 2025
Certificates of CA (Form 3)File: 30122023.pdf9 Jan 2025
Certificates of CA (Form 3)File: 30092023.pdf9 Jan 2025
Certificates of CA (Form 3)File: 30062023.pdf9 Jan 2025
Disclosure of sold/ booked inventoryFile: 30062023.pdf9 Jan 2025
Disclosure of sold/ booked inventoryFile: 30092023.pdf9 Jan 2025
Disclosure of sold/ booked inventoryFile: 30122023.pdf9 Jan 2025
Disclosure of sold/ booked inventoryFile: 30032024.pdf9 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2022-23.pdf9 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 20223-24.pdf9 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 2023-24.pdf9 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 BBa.pdf7 Mar 2024
CERSAI detailsFile: CERSAI DECLARATION.pdf22 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: INTEREST.pdf22 May 2023
Deviation Report with respect to Allotment letterFile: DEVIATION SHEET.pdf22 May 2023
Deviation Report with respect to model copy of AgreementFile: agreement_11zon (1).pdf22 May 2023
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE CERTIFICATE.pdf20 May 2023
Details of encumbrances concerned to LegalFile: ENCUMBRANCE CERTIFICATE.pdf20 May 2023
Declaration about Commencement CertificateFile: CC_11zon.pdf20 May 2023
Disclosure of sold/ booked inventoryFile: RECEIVABLES.pdf20 May 2023
Proforma of Agreement for saleFile: agreement-1_11zon.pdf20 May 2023

How this compares with Pune

86%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 72 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAVANNA HILLS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bavadhan BK13,700+ in Pune

2 kmSAVANNA HILLSCompleted 55Lapsed / revoked 37Other 70Dot size: filed unitsN

Filed coordinates, straight-line distance. 162 registered projects within 2 km.

Builder: BHALERAO BROTHERS AND ASSOCIATES

BHALERAO BROTHERS AND ASSOCIATES has 1 registration on MahaRERA, including SAVANNA HILLS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SAVANNA HILLS is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAVANNA HILLS?

The registered promoter entity is BHALERAO BROTHERS AND ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAVANNA HILLS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAVANNA HILLS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAVANNA HILLS?

The professionals named in the filing: Architect: ROHIt dasnurkar; Engineer: PRADEEP PATIL; Engineer: Anil Ranadive; Chartered Accountant: SANJAY BHALERAO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAVANNA HILLS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAVANNA HILLS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAVANNA HILLS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.