Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SAPTASHRUNGI ARADHANA is a Residential / Group Housing project by TRIMURTI BUILDTECH in Nashik, Maharashtra, registered with MahaRERA as P51600078633 on 30 Dec 2024. The registration is recorded completed; possession was promised by 30 May 2027. 11 of the 28 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.
At a glance
Project
- NameSAPTASHRUNGI ARADHANA
- TypeResidential / Group Housing
- Location
- Siddhatek Nagar Kamatwade
- Nashik
- 422010
- Pincode422010
- RERA no.P51600078633
- ReraGenie IDRG-MH-23325
Builder
- NameTRIMURTI BUILDTECH
- Entity typePartnership
- PartnersBHAUSAHEB PUNJA MATALE, GANESH BALWANT MATALE, VIJAY VALU SALUNKE, MAHESH DAULAT SALUNKE
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on30 Dec 2024
- Promised completion30 May 2027
- Revised completionNone
- Buildings1 building record
- Documents filed94 files
Current status
Figures as on 23 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SAPTASHRUNGI ARADHANA | NA | 8 | 7 | 28 | 0 | 28 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 23 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.
SAPTASHRUNGI ARADHANA: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 23 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed18
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership9
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| MADHURI YOGESH DHONGADE | Nashik | Nashik |
| SAMARTH VALU SALUNKE | Nashik | Nashik |
| MANDAKINI VALU SALUNKE | Nashik | Nashik |
| RAJARAM SANTU SALUNKE | Nashik | Nashik |
| DAULAT SANTU SALUNKE | Nashik | Nashik |
| VIJAY VALU SALUNKE | Nashik | Nashik |
| MAHESH DAULAT SALUNKE | Nashik | Nashik |
| GANESH BALWANT MATALE | Nashik | Nashik |
| BHAUSAHEB PUNJA MATALE | Nashik | Nashik |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SAPTASHRUNGI ARADHANA | NA | Rs 5.21 cr | Rs 5.21 cr |
| - | NA | Rs 40.00 lakh | Rs 40.00 lakh |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ASHOK N JAMDAR |
| Engineer | KUBER SAHEBRAO BHUSAL |
| Chartered Accountant | ABHIJEET RAMCHANDRA SHINDE |
| Chartered Accountant | MAHENDRA RAMESH JAMDHADE |
| Chartered Accountant | PRASAD YEOLA |
| Partner | Role in project |
|---|---|
| TRIMURTI BUILDTECH | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 9 Dec 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 24 Jun 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 24 Jun 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 24 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed94
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 94 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Saptasrungi Aradhana form 1.pdf | 23 May 2026 |
| Withdrawal Update Form 2File: Saptasrungi Aradhana form 2.pdf | 23 May 2026 |
| Withdrawal Update Form 3File: Saptasrungi Aradhana form 3.pdf | 23 May 2026 |
| Occupational CertificateFile: completion certificate.pdf | 23 May 2026 |
| Withdrawal Update Form 1File: Trimurti Buildtech form 1_11zon.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: Trimurti Buildtech form 2_11zon.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 _.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: Trimurti Buildtech form 1_11zon.pdf | 17 Jan 2026 |
| Withdrawal Update Form 2File: Trimurti Buildtech form 2_11zon.pdf | 17 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 _.pdf | 17 Jan 2026 |
| Form 5 (FY 2024-2025)File: Trimurti buildtech Form 5.pdf | 29 Dec 2025 |
| Withdrawal Update Form 1File: Form 1.pdf | 8 Nov 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 8 Nov 2025 |
| Withdrawal Update Form 3File: Form 3 _.pdf | 8 Nov 2025 |
| Withdrawal Update Form 1File: FORM 1.pdf | 19 Sep 2025 |
| Withdrawal Update Form 1File: FORM 1.pdf | 19 Sep 2025 |
| Withdrawal Update Form 2File: Form 2_11zon.pdf | 19 Sep 2025 |
| Withdrawal Update Form 2File: Form 2_11zon.pdf | 19 Sep 2025 |
| Withdrawal Update Form 3File: Form 3 Q1_11zon.pdf | 19 Sep 2025 |
| Withdrawal Update Form 3File: Form 3 Q1_11zon.pdf | 19 Sep 2025 |
| Withdrawal Update Form 1File: FORM 1.pdf | 6 Aug 2025 |
| Withdrawal Update Form 1File: FORM 1.pdf | 6 Aug 2025 |
| Withdrawal Update Form 1File: FORM 1.pdf | 6 Aug 2025 |
| Withdrawal Update Form 1File: FORM 1.pdf | 6 Aug 2025 |
| Withdrawal Update Form 2File: Form 2_11zon.pdf | 6 Aug 2025 |
| Withdrawal Update Form 2File: Form 2_11zon.pdf | 6 Aug 2025 |
| Withdrawal Update Form 2File: Form 2_11zon.pdf | 6 Aug 2025 |
| Withdrawal Update Form 2File: Form 2_11zon.pdf | 6 Aug 2025 |
| Withdrawal Update Form 3File: Form 3 Q1_11zon.pdf | 6 Aug 2025 |
| Withdrawal Update Form 3File: Form 3 Q1_11zon.pdf | 6 Aug 2025 |
| Withdrawal Update Form 3File: Form 3 Q1_11zon.pdf | 6 Aug 2025 |
| Withdrawal Update Form 3File: Form 3 Q1_11zon.pdf | 6 Aug 2025 |
| Form 1File: Rera Form 1.pdf | 16 Jul 2025 |
| Form 2File: Rera Form 2.pdf | 16 Jul 2025 |
| Form 3File: Form 3_11zon.pdf | 16 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY.pdf | 16 Jul 2025 |
| Form 1File: Rera Form 1.pdf | 16 Jul 2025 |
| Form 2File: Rera Form 2.pdf | 16 Jul 2025 |
| Form 3File: Form 3_11zon.pdf | 16 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY.pdf | 16 Jul 2025 |
| Withdrawal Update Form 1File: FORM 1 Updated.pdf | 16 Jul 2025 |
| Withdrawal Update Form 2File: Rera Form 2.pdf | 16 Jul 2025 |
| Withdrawal Update Form 3File: Form - 3_11zon.pdf | 16 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera Form 1.pdf | 26 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_11zon.pdf | 26 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rera Form 2.pdf | 26 Apr 2025 |
| Copy of the legal title reportFile: Title Report Plot No 77 And 78 For Rera new_11zon.pdf | 9 Dec 2024 |
| Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCES-FINANCIAL.pdf | 9 Dec 2024 |
| Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCES-LEGAL.pdf | 9 Dec 2024 |
| Proforma of Allotment letterFile: Final Allotment Letter new.pdf | 9 Dec 2024 |
| Other - LegalFile: DISCLOSURE UNS.pdf | 9 Dec 2024 |
| Other - LegalFile: ANNEXURE A.pdf | 9 Dec 2024 |
| Other - LegalFile: NO ENCUMBRANCES-LEGAL.pdf | 9 Dec 2024 |
| Deviation Report with respect to Allotment letterFile: no Deviation of Allotment.pdf | 9 Dec 2024 |
| Details of encumbrances concerned to LegalFile: NO ENCUMBRANCES-LEGAL.pdf | 9 Dec 2024 |
| Details of encumbrances concerned to LegalFile: NO ENCUMBRANCES-FINANCIAL.pdf | 9 Dec 2024 |
| Deviation Report with respect to model copy of AgreementFile: NO Deviation of Agreement for Sale.pdf | 9 Dec 2024 |
| Proforma of Agreement for saleFile: Final Agreement for Sale new.pdf | 9 Dec 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: vijay salunke.pdf | 9 Dec 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: bhausaheb matale.pdf | 9 Dec 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: ganesh matale.pdf | 9 Dec 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: mahesh salunke.pdf | 9 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Updated.pdf | 17 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 17 Oct 2024 |
| Other - FinanceFile: Encumbrances Certificate.pdf | 17 Oct 2024 |
| Other - FinanceFile: From 3 N.pdf | 17 Oct 2024 |
| Other - LegalFile: Format A as per Order 56.pdf | 8 Oct 2024 |
| Other - LegalFile: Format B Order 56.pdf | 8 Oct 2024 |
| Other - TechnicalFile: No Encumbrance Certificate_N.pdf | 26 Jul 2024 |
| Other - TechnicalFile: Rera Annexure A.pdf | 26 Jul 2024 |
| Other - TechnicalFile: REA51600163317_Mail.pdf | 6 Jul 2024 |
| Details of encumbrances concerned to FinanceFile: No Encumbrance Certificate_N.pdf | 1 Jul 2024 |
| Details of encumbrances concerned to LegalFile: No Encumbrance Certificate_N.pdf | 1 Jul 2024 |
| Building plan approvalFile: Rera Building Plan_11zon.pdf | 24 Jun 2024 |
| Layout approvalFile: Rera Layout_11zon.pdf | 24 Jun 2024 |
| PAN CardFile: Pan Card.pdf | 24 Jun 2024 |
| Copy of Layout Approval (in case of layout)File: Rera Layout_11zon.pdf | 24 Jun 2024 |
| Declaration in FORM BFile: Form - B-Madhuri Yogesh Dhongade_11zon.pdf | 24 Jun 2024 |
| Declaration in FORM BFile: Form - B-Vijay Valu Salunke_11zon.pdf | 24 Jun 2024 |
| Declaration in FORM BFile: Form - B-Samarth Valu Salunke Minor Guardian mother Mandakini Valu Salunke_11zon.pdf | 24 Jun 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- All 94 filed documents as one ZIP, foldered, with a manifest
Keep SAPTASHRUNGI ARADHANA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Siddhatek Nagar Kamatwade4,100+ in Nashik
SHREE SATYANARAYAN ROONGTA FORUM
ROONGTA HOMES LLP
LIFE 360
VELOCITY INFRA PROJECTS
ARYAN'S LIFEONE
SHREE ARYAN BUILDERS AND DEVELOPERS
SUNFLOWER CITY
DEEPAK KALYANJI CHANDE
Laxminarayan Heaven
Sahajanand Builders And Developers
SWASTIK MANGAL APARTMENT
SHREEMANGAL CONSTRUCTION
See every Nashik project, with the district possession charts
Builder: TRIMURTI BUILDTECH
TRIMURTI BUILDTECH has 1 registration on MahaRERA, including SAPTASHRUNGI ARADHANA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if SAPTASHRUNGI ARADHANA is delayed beyond 30 May 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SAPTASHRUNGI ARADHANA?
The registered promoter entity is TRIMURTI BUILDTECH, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SAPTASHRUNGI ARADHANA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SAPTASHRUNGI ARADHANA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SAPTASHRUNGI ARADHANA?
The professionals named in the filing: Architect: ASHOK N JAMDAR; Engineer: KUBER SAHEBRAO BHUSAL; Chartered Accountant: ABHIJEET RAMCHANDRA SHINDE; Chartered Accountant: MAHENDRA RAMESH JAMDHADE; Chartered Accountant: PRASAD YEOLA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SAPTASHRUNGI ARADHANA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback