ReraGenieLog inGet a buyer report

Home / Browse projects / Nashik, Maharashtra / SAPTASHRUNGI ARADHANA

Completed No litigation declared Residential / Group Housing project

SAPTASHRUNGI ARADHANA

By TRIMURTI BUILDTECH

RG-MH-23325 · RERA P51600078633 · Last updated on MahaRERA portal: 23 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
May 2027Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Basement (if any), 0%
17 of 28Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 94 documents Report an error

SAPTASHRUNGI ARADHANA is a Residential / Group Housing project by TRIMURTI BUILDTECH in Nashik, Maharashtra, registered with MahaRERA as P51600078633 on 30 Dec 2024. The registration is recorded completed; possession was promised by 30 May 2027. 11 of the 28 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameSAPTASHRUNGI ARADHANA
  • TypeResidential / Group Housing
  • Location
    • Siddhatek Nagar Kamatwade
    • Nashik
    • 422010
  • Pincode422010
  • RERA no.P51600078633
  • ReraGenie IDRG-MH-23325

Builder

  • NameTRIMURTI BUILDTECH
  • Entity typePartnership
  • PartnersBHAUSAHEB PUNJA MATALE, GANESH BALWANT MATALE, VIJAY VALU SALUNKE, MAHESH DAULAT SALUNKE

Key dates

this monthRegisteredDec 2024PromisedMay 2027Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on30 Dec 2024
  • Promised completion30 May 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed94 files

Current status

39%11 of 28 units booked
100.0%Work done, per cost certificate

Figures as on 23 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SAPTASHRUNGI ARADHANANA8728028

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

SAPTASHRUNGI ARADHANA: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 23 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed18

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots18
Closed/Covered18

Land and ownership9

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area657 sq m
Land owned byThe promoter, with other names on the file
Named landowners9
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on18 May 2026
LandownerVillageDistrict
MADHURI YOGESH DHONGADENashikNashik
SAMARTH VALU SALUNKENashikNashik
MANDAKINI VALU SALUNKENashikNashik
RAJARAM SANTU SALUNKENashikNashik
DAULAT SANTU SALUNKENashikNashik
VIJAY VALU SALUNKENashikNashik
MAHESH DAULAT SALUNKENashikNashik
GANESH BALWANT MATALENashikNashik
BHAUSAHEB PUNJA MATALENashikNashik

Approvals and building plan

Sanctioning authorityTown Planning Department Nashik Muncipal Corporation
Permissible FSI2078.72
Proposed, not sanctioned2,079 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHDFC BANK LTD, GROUND FLOOR, P SQUARE BUSINESS PARK, SIDHHATEK NAGAR, ITI LINK ROAD, KAMATWADE, NASH
Estimated costRs 5.61 cr
Cost incurredRs 5.61 cr
Work done100.0%
BuildingWingEstimatedIncurred
SAPTASHRUNGI ARADHANANARs 5.21 crRs 5.21 cr
-NARs 40.00 lakhRs 40.00 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectASHOK N JAMDAR
EngineerKUBER SAHEBRAO BHUSAL
Chartered AccountantABHIJEET RAMCHANDRA SHINDE
Chartered AccountantMAHENDRA RAMESH JAMDHADE
Chartered AccountantPRASAD YEOLA
PartnerRole in project
TRIMURTI BUILDTECH-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Dec 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Jun 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed94

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 94 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Saptasrungi Aradhana form 1.pdf23 May 2026
Withdrawal Update Form 2File: Saptasrungi Aradhana form 2.pdf23 May 2026
Withdrawal Update Form 3File: Saptasrungi Aradhana form 3.pdf23 May 2026
Occupational CertificateFile: completion certificate.pdf23 May 2026
Withdrawal Update Form 1File: Trimurti Buildtech form 1_11zon.pdf20 Jan 2026
Withdrawal Update Form 2File: Trimurti Buildtech form 2_11zon.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 3 _.pdf20 Jan 2026
Withdrawal Update Form 1File: Trimurti Buildtech form 1_11zon.pdf17 Jan 2026
Withdrawal Update Form 2File: Trimurti Buildtech form 2_11zon.pdf17 Jan 2026
Withdrawal Update Form 3File: Form 3 _.pdf17 Jan 2026
Form 5 (FY 2024-2025)File: Trimurti buildtech Form 5.pdf29 Dec 2025
Withdrawal Update Form 1File: Form 1.pdf8 Nov 2025
Withdrawal Update Form 2File: Form 2.pdf8 Nov 2025
Withdrawal Update Form 3File: Form 3 _.pdf8 Nov 2025
Withdrawal Update Form 1File: FORM 1.pdf19 Sep 2025
Withdrawal Update Form 1File: FORM 1.pdf19 Sep 2025
Withdrawal Update Form 2File: Form 2_11zon.pdf19 Sep 2025
Withdrawal Update Form 2File: Form 2_11zon.pdf19 Sep 2025
Withdrawal Update Form 3File: Form 3 Q1_11zon.pdf19 Sep 2025
Withdrawal Update Form 3File: Form 3 Q1_11zon.pdf19 Sep 2025
Withdrawal Update Form 1File: FORM 1.pdf6 Aug 2025
Withdrawal Update Form 1File: FORM 1.pdf6 Aug 2025
Withdrawal Update Form 1File: FORM 1.pdf6 Aug 2025
Withdrawal Update Form 1File: FORM 1.pdf6 Aug 2025
Withdrawal Update Form 2File: Form 2_11zon.pdf6 Aug 2025
Withdrawal Update Form 2File: Form 2_11zon.pdf6 Aug 2025
Withdrawal Update Form 2File: Form 2_11zon.pdf6 Aug 2025
Withdrawal Update Form 2File: Form 2_11zon.pdf6 Aug 2025
Withdrawal Update Form 3File: Form 3 Q1_11zon.pdf6 Aug 2025
Withdrawal Update Form 3File: Form 3 Q1_11zon.pdf6 Aug 2025
Withdrawal Update Form 3File: Form 3 Q1_11zon.pdf6 Aug 2025
Withdrawal Update Form 3File: Form 3 Q1_11zon.pdf6 Aug 2025
Form 1File: Rera Form 1.pdf16 Jul 2025
Form 2File: Rera Form 2.pdf16 Jul 2025
Form 3File: Form 3_11zon.pdf16 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY.pdf16 Jul 2025
Form 1File: Rera Form 1.pdf16 Jul 2025
Form 2File: Rera Form 2.pdf16 Jul 2025
Form 3File: Form 3_11zon.pdf16 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY.pdf16 Jul 2025
Withdrawal Update Form 1File: FORM 1 Updated.pdf16 Jul 2025
Withdrawal Update Form 2File: Rera Form 2.pdf16 Jul 2025
Withdrawal Update Form 3File: Form - 3_11zon.pdf16 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera Form 1.pdf26 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_11zon.pdf26 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rera Form 2.pdf26 Apr 2025
Copy of the legal title reportFile: Title Report Plot No 77 And 78 For Rera new_11zon.pdf9 Dec 2024
Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCES-FINANCIAL.pdf9 Dec 2024
Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCES-LEGAL.pdf9 Dec 2024
Proforma of Allotment letterFile: Final Allotment Letter new.pdf9 Dec 2024
Other - LegalFile: DISCLOSURE UNS.pdf9 Dec 2024
Other - LegalFile: ANNEXURE A.pdf9 Dec 2024
Other - LegalFile: NO ENCUMBRANCES-LEGAL.pdf9 Dec 2024
Deviation Report with respect to Allotment letterFile: no Deviation of Allotment.pdf9 Dec 2024
Details of encumbrances concerned to LegalFile: NO ENCUMBRANCES-LEGAL.pdf9 Dec 2024
Details of encumbrances concerned to LegalFile: NO ENCUMBRANCES-FINANCIAL.pdf9 Dec 2024
Deviation Report with respect to model copy of AgreementFile: NO Deviation of Agreement for Sale.pdf9 Dec 2024
Proforma of Agreement for saleFile: Final Agreement for Sale new.pdf9 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: vijay salunke.pdf9 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: bhausaheb matale.pdf9 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ganesh matale.pdf9 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: mahesh salunke.pdf9 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Updated.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf17 Oct 2024
Other - FinanceFile: Encumbrances Certificate.pdf17 Oct 2024
Other - FinanceFile: From 3 N.pdf17 Oct 2024
Other - LegalFile: Format A as per Order 56.pdf8 Oct 2024
Other - LegalFile: Format B Order 56.pdf8 Oct 2024
Other - TechnicalFile: No Encumbrance Certificate_N.pdf26 Jul 2024
Other - TechnicalFile: Rera Annexure A.pdf26 Jul 2024
Other - TechnicalFile: REA51600163317_Mail.pdf6 Jul 2024
Details of encumbrances concerned to FinanceFile: No Encumbrance Certificate_N.pdf1 Jul 2024
Details of encumbrances concerned to LegalFile: No Encumbrance Certificate_N.pdf1 Jul 2024
Building plan approvalFile: Rera Building Plan_11zon.pdf24 Jun 2024
Layout approvalFile: Rera Layout_11zon.pdf24 Jun 2024
PAN CardFile: Pan Card.pdf24 Jun 2024
Copy of Layout Approval (in case of layout)File: Rera Layout_11zon.pdf24 Jun 2024
Declaration in FORM BFile: Form - B-Madhuri Yogesh Dhongade_11zon.pdf24 Jun 2024
Declaration in FORM BFile: Form - B-Vijay Valu Salunke_11zon.pdf24 Jun 2024
Declaration in FORM BFile: Form - B-Samarth Valu Salunke Minor Guardian mother Mandakini Valu Salunke_11zon.pdf24 Jun 2024

How this compares with Nashik

39%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is completed

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAPTASHRUNGI ARADHANA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Siddhatek Nagar Kamatwade4,100+ in Nashik

Builder: TRIMURTI BUILDTECH

TRIMURTI BUILDTECH has 1 registration on MahaRERA, including SAPTASHRUNGI ARADHANA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if SAPTASHRUNGI ARADHANA is delayed beyond 30 May 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAPTASHRUNGI ARADHANA?

The registered promoter entity is TRIMURTI BUILDTECH, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAPTASHRUNGI ARADHANA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAPTASHRUNGI ARADHANA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAPTASHRUNGI ARADHANA?

The professionals named in the filing: Architect: ASHOK N JAMDAR; Engineer: KUBER SAHEBRAO BHUSAL; Chartered Accountant: ABHIJEET RAMCHANDRA SHINDE; Chartered Accountant: MAHENDRA RAMESH JAMDHADE; Chartered Accountant: PRASAD YEOLA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAPTASHRUNGI ARADHANA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAPTASHRUNGI ARADHANA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAPTASHRUNGI ARADHANA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.