ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Santiago Skyland

Registered No litigation declared Others project

Santiago Skyland

By Sah & AVR Associates LLP

RG-MH-50932 · RERA P52100054420 · Last updated on MahaRERA portal: 1 Oct 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 4 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Apr 2027Possession promisedmoved 4 months from the original
14 of 22Construction stages doneacross 2 buildings; furthest along: Staircases, 95%
5 of 122Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 97 documents Report an error

Santiago Skyland is a Others project by Sah & AVR Associates LLP in Pune, Maharashtra, registered with MahaRERA as P52100054420 on 19 Jan 2024. Possession is promised by 30 Apr 2027. The completion date has moved by 4 months from the original filing. 117 of the 122 units on this registration are recorded sold or booked, and 14 of 22 construction stages are filed complete.

At a glance

Project

  • NameSantiago Skyland
  • TypeOthers
  • Location
    • -
    • Kiwale
    • Haveli
    • Pune
    • 412101
  • Pincode412101
  • RERA no.P52100054420
  • ReraGenie IDRG-MH-50932

Builder

  • NameSah & AVR Associates LLP
  • Entity typePartnership
  • GSTIN27AFDFS2514P1ZN
  • PartnersVijaykumar Gopichand Ramchandani, Mukesh Kumar Basistha Sah, Jitendra Kumar Basistha Sah, Ranvijay Kumar Vashishtha Narayan Sah, Kashinath Chandrappa Biradar

Key dates

this monthRegisteredJan 2024First promiseDec 2026Revised toApr 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on19 Jan 2024
  • Promised completion30 Apr 2027
  • Revised completionRevised to 30 Apr 2027 (originally 31 Dec 2026)
  • Buildings2 building records
  • Documents filed97 files

Current status

96%117 of 122 units booked
77.8%Work done, per cost certificate

Figures as on 1 Oct 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A BuildingNA131059059
B BuildingNA131163063

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 1 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

14 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 95%.

A Building89%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.92%
B Building89%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.92%

Progress on shared amenities15

As on 1 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed232

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots232
Closed/Covered126
Open Space106
BuildingClosed/CoveredOpen SpaceTotal
A Building6252114
B Building6454118

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,812 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
Vijay Gopichand RamchandaniPimpri Chinchawad (M Corp.)Pune
SAH DevelopersPimpale SaudagarPune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI14274.17
Proposed, not sanctioned6,774 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor, Prime Square, Below Rangla Punjab, Pimple Saudagar Pune 411027
Estimated costRs 39.17 cr
Cost incurredRs 30.49 cr
Work done77.85%
BuildingWingEstimatedIncurred
A BuildingNARs 23.50 crRs 19.10 cr
B BuildingNARs 14.02 crRs 11.39 cr
-NARs 1.65 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMAHENDRA THAKUR & ASSOCIATES
EngineerSONALI AMRUTKAR
Chartered AccountantAKSHAY LAD & ASSOCIATES
Chartered AccountantB S Ghadage
PartnerRole in project
Sah & AVR Associates LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

P52100054420/WarDec 2026 → Apr 2027

Reason as filed by the promoterNA

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2027

Documents filed97

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 97 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2025-2026)File: Form 5 SAH and AVR Associates LLP_0001.pdf1 Oct 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate - June 2026.pdf20 Jul 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate - June 2026.pdf20 Jul 2026
Withdrawal Update Form 3File: Form 3 CA Certificate - June 2026.pdf20 Jul 2026
Form 5 (FY 2024-2025)File: Form 5 Santiago Skyland 31_03_2025.pdf29 Jun 2026
Form 1File: Santiago Skyland Form1 31032026.pdf27 Apr 2026
Form 2File: Santiago Skyland Form 2 31032026.pdf27 Apr 2026
Form 3File: Santiago Skyland Form 3 31032026co.pdf27 Apr 2026
Disclosure of Sold and Booked InventoryFile: Skyland Sold Unsold Inventry 31032026.pdf27 Apr 2026
Form 1File: form 1 SKYLAND 30 06 2025.PDF24 Jan 2026
Form 2File: Form2 skyland 30062025.PDF24 Jan 2026
Form 3File: Form 3 Skyland 30062025.pdf24 Jan 2026
Disclosure of Sold and Booked InventoryFile: Skyland Sold Inventory 30062025.pdf24 Jan 2026
Form 1File: Skyland form 1 30092025.pdf24 Jan 2026
Form 2File: form 2 30092025 SKYLAND.pdf24 Jan 2026
Form 3File: Form 3 Skyland 30092025compressed.pdf24 Jan 2026
Disclosure of Sold and Booked InventoryFile: Skyland Sold Inventory 30092025.pdf24 Jan 2026
Form 1File: From 1 31122025 skyland.pdf24 Jan 2026
Form 2File: Form2 Santiago Skyland 31122025.pdf24 Jan 2026
Form 3File: Form 3 Skyland 31122025compressed.pdf24 Jan 2026
Disclosure of Sold and Booked InventoryFile: Skyland Sold Inventory 31122025.pdf24 Jan 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Santiago Skyland 31032025.pdf7 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Skyland Form 3 compressed.pdf7 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Santiago Skyland 31032025.PDF7 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Santiago Skyland 31032025 compressed.pdf7 May 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Santiago Skyland 31032025.pdf7 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Skyland.PDF4 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Skyland Form 2.pdf4 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Skyland.pdf4 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Skyland June_compressed.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Skyland Sep.PDF20 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Skyland March.PDF11 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar Certificate skyland 30092024.pdf29 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Archietect Certificate SKYLAND 300924.PDF29 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Skyland June_compressed.pdf29 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Skyland September_compressed.pdf29 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Skyland June.PDF29 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Skyland September_compressed.pdf29 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar Certificate 31032024 skyland.pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar Certificate 30062024 skyland.pdf12 Aug 2024
Declaration about Commencement CertificateFile: Revised Declaration Format D.pdf29 May 2024
Layout approvalFile: HPSC0215_compressed.pdf26 May 2024
Building plan approvalFile: HPSC0216_compressed.pdf26 May 2024
Building plan approvalFile: HPSC0217_compressed.pdf26 May 2024
Building plan approvalFile: HPSC0218_compressed.pdf26 May 2024
Building plan approvalFile: HPSC0219_compressed.pdf26 May 2024
Building plan approvalFile: HPSC0221_compressed.pdf26 May 2024
Building plan approvalFile: HPSC0222_compressed.pdf26 May 2024
Building plan approvalFile: HPSC0223_compressed.pdf26 May 2024
Copy of Layout Approval (in case of layout)File: HPSC0215_compressed.pdf26 May 2024
Building Plan Approval / NA Order for plotted developmentFile: HPSC0216_compressed.pdf26 May 2024
Building Plan Approval / NA Order for plotted developmentFile: HPSC0217_compressed.pdf26 May 2024
Building Plan Approval / NA Order for plotted developmentFile: HPSC0218_compressed.pdf26 May 2024
Building Plan Approval / NA Order for plotted developmentFile: HPSC0219_compressed.pdf26 May 2024
Building Plan Approval / NA Order for plotted developmentFile: HPSC0221_compressed.pdf26 May 2024
Building Plan Approval / NA Order for plotted developmentFile: HPSC0222_compressed.pdf26 May 2024
Building Plan Approval / NA Order for plotted developmentFile: HPSC0223_compressed.pdf26 May 2024
Commencement Certificates / NA Order for plotted developmentFile: Revised Commencement.pdf12 Apr 2024
Building plan approvalFile: HPSC0215_compressed.pdf9 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: HPSC0215_compressed.pdf9 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate New.pdf15 Jan 2024
Proforma of Agreement for saleFile: Draft Agreement Santiago Skyland.pdf15 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Biradar.PDF13 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Jitendra Sah.PDF13 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Ranvijay V Sah.PDF13 Jan 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report of Agreement.PDF13 Jan 2024
Other - LegalFile: Index II - Sale Deed.pdf12 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architects certificate latest.PDF8 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer s certificate latest.PDF8 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Separate Bank Account latest.PDF5 Jan 2024
Copy of the legal title reportFile: SANTIAGO SKYLAND - SEARCH 1 compressed.pdf1 Jan 2024
Copy of the legal title reportFile: SANTIAGO SKYLAND - SEARCH 2 compressed.pdf1 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST - Vijay Ramchandani.PDF22 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST - Mukesh Sah 1.pdf22 Dec 2023
Proforma of Allotment letterFile: Allotment Letter.PDF22 Dec 2023
Deviation Report with respect to Allotment letterFile: Deviation of Allotment Letter.PDF22 Dec 2023
PAN CardFile: LLP PAN unlocked.pdf21 Dec 2023
CERSAI detailsFile: CERSAI Search Report Santiago Skyland.pdf21 Dec 2023
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE CERTIFICATE - Legal.PDF19 Dec 2023
Details of encumbrances concerned to LegalFile: ENCUMBRANCE CERTIFICATE - Legal.PDF19 Dec 2023

How this compares with Pune

96%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 4 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Santiago Skyland on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near -13,700+ in Pune

Builder: Sah & AVR Associates LLP

Sah & AVR Associates LLP has 1 registration on MahaRERA, including Santiago Skyland. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Santiago Skyland is delayed beyond 30 Apr 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Santiago Skyland?

The registered promoter entity is Sah & AVR Associates LLP, a partnership as per the filing. Its GSTIN 27AFDFS2514P1ZN can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Santiago Skyland?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Santiago Skyland?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Santiago Skyland?

The professionals named in the filing: Architect: MAHENDRA THAKUR & ASSOCIATES; Engineer: SONALI AMRUTKAR; Chartered Accountant: AKSHAY LAD & ASSOCIATES; Chartered Accountant: B S Ghadage. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Santiago Skyland?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Santiago Skyland. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Santiago Skyland to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.