ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / Sankheshwar Plaza

Registered No litigation declared Residential / Group Housing project

Sankheshwar Plaza

By VNG Enterprises

RG-MH-18435 · RERA P51700076831 · Last updated on MahaRERA portal: 23 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
0 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 65%
53 of 55Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 73 documents Report an error

Sankheshwar Plaza is a Residential / Group Housing project by VNG Enterprises in Thane, Maharashtra, registered with MahaRERA as P51700076831 on 28 Jun 2024. Possession is promised by 31 Dec 2026. 2 of the 55 units on this registration are recorded sold or booked, and 0 of 22 construction stages are filed complete.

At a glance

Project

  • NameSankheshwar Plaza
  • TypeResidential / Group Housing
  • Location
    • Ghodbunder Road
    • Kasarvadavali
    • Thane (M Corp.)
    • Thane
    • 400615
  • Pincode400615
  • RERA no.P51700076831
  • ReraGenie IDRG-MH-18435

Builder

  • NameVNG Enterprises
  • Entity typePartnership
  • PartnersChandrakant Nagji Chedda, Vrajlal Vallabhdas Rathi, Rutuj Girish Shah, Girish Nensibhai Soni

Key dates

this monthRegisteredJun 2024PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Jun 2024
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed73 files

Current status

4%2 of 55 units booked
8.0%Work done, per cost certificate

Figures as on 23 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Sankheshwar Plaza - A WingNA77707
Sankheshwar Plaza - B WingNA7748048

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 23 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 65%.

Sankheshwar Plaza - A Wing11%
ActivityProgress
Excavation65%
Basement (if any)0%
Podiums (if any)0%
Plinth55%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Sankheshwar Plaza - B Wing10%
ActivityProgress
Excavation60%
Basement (if any)0%
Podiums (if any)0%
Plinth50%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 23 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed82

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots82
Closed/Covered82
BuildingClosed/CoveredTotal
Sankheshwar Plaza - A Wing4242
Sankheshwar Plaza - B Wing4040

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,050 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on13 Aug 2025
LandownerVillageDistrict
Nikesh Kantilal WaghelaThane (M Corp.)Thane

Approvals and building plan

Sanctioning authorityThane Municipal Corporation
Permissible FSI4272.63
Proposed, not sanctioned4,273 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKHARKAR ALI BRANCH VAISHNAV MANDIR BUILDING GR FLOOR JAMBHALI NAKA KHARKAR ALI THANE
Estimated costRs 16.25 cr
Cost incurredRs 1.30 cr
Work done8.0%
BuildingWingEstimatedIncurred
Sankheshwar Plaza - A WingNARs 8.12 crRs 65.00 lakh
Sankheshwar Plaza - B WingNARs 8.12 crRs 65.00 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectShashi Deshmukh
EngineerAjay Mahale
EngineerGaurav Rathi
Chartered AccountantSwapnesh & Vinit
Chartered AccountantAniket Kadam & Associates
PartnerRole in project
VNG Enterprises-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Jun 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed73

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: 4_Form 2A - FY 2025-26.pdf23 Jun 2026
Withdrawal Update Form 1File: 1_Form 1 - Q4 of FY 2025-26.pdf1 Jun 2026
Withdrawal Update Form 2File: 2_Form 2 - Q4 of FY 2025-26.pdf1 Jun 2026
Withdrawal Update Form 3File: 3_Form 3 - Q4 of FY 2025-26.pdf1 Jun 2026
Withdrawal Update Form 1File: 1_Form 1_A and B Wing_Q3 of FY 2025-26.pdf18 Mar 2026
Withdrawal Update Form 2File: 2_Form 2 - Q3 of FY 2025-26.pdf18 Mar 2026
Withdrawal Update Form 3File: 3_Form 3 - Q3 of FY 2025-26-Signed.pdf18 Mar 2026
Withdrawal Update Form 1File: 1_Form 1 - Wing A and B_merged.pdf16 Mar 2026
Withdrawal Update Form 2File: 2_Form 2 Q2 FY 25-26 (VNG Ent).pdf16 Mar 2026
Withdrawal Update Form 3File: 03_ Form 3 Q2 of FY 2025-26 (VNG Ent) SG .pdf16 Mar 2026
Withdrawal Update Form 1File: 1_Form-1 Architect Certificate Q1 FY-2025-26.pdf25 Sep 2025
Withdrawal Update Form 2File: 2_Form 2- Engineer Certificate Q1 FY-2025-26.pdf25 Sep 2025
Withdrawal Update Form 3File: 3_ Form-3- CA Certificate Q1 FY-2025-26 (1).pdf25 Sep 2025
Form 2A (FY 2024-2025)File: 3_Form 2A- 31-May-2025.pdf19 Sep 2025
Form 1File: 1_Form 1 - 30-June-2024.pdf18 Sep 2025
Form 2File: 2_Form 2 - 30-June-2024.pdf18 Sep 2025
Form 3File: 4_Form 3 - 30-June-2024-Signed.pdf18 Sep 2025
Disclosure of Sold and Booked InventoryFile: 5_Disclosure of Sold 30-06-2024.pdf18 Sep 2025
Form 1File: 1_Form 1 - 30-Sep-2024.pdf18 Sep 2025
Form 2File: 2_Form 2 - 30-Sep-2024.pdf18 Sep 2025
Form 3File: 4_Form 3 - 30-Sep-2024-Signed.pdf18 Sep 2025
Disclosure of Sold and Booked InventoryFile: 5_Disclosure of Sold 30-Sep-2024.pdf18 Sep 2025
Form 1File: 1_Form 1 - 31-Dec-2024.pdf18 Sep 2025
Form 2File: 2_Form-2 - 31-Dec-2024.pdf18 Sep 2025
Form 3File: 4_Form 3 - 31-Dec-2024-Signed.pdf18 Sep 2025
Disclosure of Sold and Booked InventoryFile: 5_Disclosure of Sold 31-12-2024.pdf18 Sep 2025
Form 1File: 1_Form 1 - 31-Mar-2025.pdf24 Aug 2025
Form 2File: 2_Form 2 - 31-Mar-2025.pdf24 Aug 2025
Form 3File: 4_Form 3-Q4- 31-Mar-2025 Signed.pdf24 Aug 2025
Disclosure of Sold and Booked InventoryFile: 5_Disclosure of Sold - 31-Mar-2025.pdf24 Aug 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4_Form 3-Q4- 31-Mar-2025 Signed.pdf26 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Form 1 - 31-Mar-2025.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4_Form 3-Q4- 31-Mar-2025.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Form 2 - 31-Mar-2025.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: 5_Disclosure of Sold - 31-Mar-2025.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4_Form 3 - 31-Dec-2024-Signed.pdf14 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Form 1 - 30-June-2024.pdf12 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Form 1 - 30-Sep-2024.pdf12 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Form 1 - 31-Dec-2024.pdf12 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4_Form 3 - 30-June-2024-Signed.pdf12 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4_Form 3 - 30-Sep-2024-Signed.pdf12 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Form 2 - 30-June-2024.pdf12 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Form 2 - 30-Sep-2024.pdf12 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Form-2 - 31-Dec-2024.pdf12 Apr 2025
Disclosure of sold/ booked inventoryFile: 5_Disclosure of Sold 30-06-2024.pdf12 Apr 2025
Disclosure of sold/ booked inventoryFile: 5_Disclosure of Sold 30-Sep-2024.pdf12 Apr 2025
Disclosure of sold/ booked inventoryFile: 5_Disclosure of Sold 31-12-2024.pdf12 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Form 1 - Q2 - 30-Sep-2024.pdf29 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Form 1 - 31-12-2024.pdf29 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Form 2 - Q2 - 30-Sep-2024.pdf29 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Form-2-Q3-31-12-2024.pdf29 Mar 2025
Layout approvalFile: Plan Verified PDFconverted- Highlighted.pdf17 Jun 2024
Details of encumbrances concerned to FinanceFile: Encumbrances - Finance and Legal.pdf17 Jun 2024
Details of encumbrances concerned to LegalFile: Encumbrances - Finance and Legal.pdf17 Jun 2024
Copy of Layout Approval (in case of layout)File: Plan Verified PDFconverted- Highlighted.pdf17 Jun 2024
Other - TechnicalFile: SS of CC mail.pdf14 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (revised).pdf13 Jun 2024
Other - TechnicalFile: Order 50 - Declaration cum Undertaking.pdf13 Jun 2024
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf6 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about separate Bank Account.pdf6 Jun 2024
Building plan approvalFile: Layout.pdf1 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Layout.pdf1 Jun 2024
Proforma of Agreement for saleFile: Agreement for Sale.pdf1 Jun 2024
Proforma of Allotment letterFile: Allotment Letter.pdf1 Jun 2024
Deviation Report with respect to Allotment letterFile: Deviation of Allotment Letter.pdf1 Jun 2024
Deviation Report with respect to model copy of AgreementFile: Deviation of Agreement for Sale.pdf1 Jun 2024
Other - LegalFile: Partnership Deed-1.pdf1 Jun 2024
PAN CardFile: PAN Card.pdf31 May 2024
Copy of the legal title reportFile: Latest Legal Title Report.pdf31 May 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf31 May 2024
Declaration in FORM BFile: Form B - Promoter.pdf31 May 2024
CERSAI detailsFile: CERSAI_Search_Report_200307690174_For_Asset_Based_Search_22_05_2024_15_23_00_073.pdf31 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DIS.pdf31 May 2024

How this compares with Thane

4%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sankheshwar Plaza on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kasarvadavali7,600+ in Thane

Builder: VNG Enterprises

VNG Enterprises has 1 registration on MahaRERA, including Sankheshwar Plaza. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Sankheshwar Plaza is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sankheshwar Plaza?

The registered promoter entity is VNG Enterprises, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sankheshwar Plaza?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sankheshwar Plaza?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sankheshwar Plaza?

The professionals named in the filing: Architect: Shashi Deshmukh; Engineer: Ajay Mahale; Engineer: Gaurav Rathi; Chartered Accountant: Swapnesh & Vinit; Chartered Accountant: Aniket Kadam & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sankheshwar Plaza?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sankheshwar Plaza. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sankheshwar Plaza to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.