Completed No litigation declared Residential / Group Housing project

Samraat Gokuldham Project 02

By M/S Shweta Infrastructure & Housing (I) Pvt. Ltd.

RG-MH-72132 · RERA P51600020375 · Last updated on MahaRERA portal: 25 May 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 14 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2022Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 107 documents Report an error

Samraat Gokuldham Project 02 is a Residential / Group Housing project by M/S Shweta Infrastructure & Housing (I) Pvt. Ltd. in Nashik, Maharashtra, registered with MahaRERA as P51600020375 on 9 Apr 2019. The registration is recorded completed; possession was promised by 30 Dec 2022.

At a glance

Project

  • NameSamraat Gokuldham Project 02
  • TypeResidential / Group Housing
  • Location
    • Mumbai Agra Road
    • Hirawadi
    • Nashik
    • 422003
  • Pincode422003
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600020375
  • ReraGenie IDRG-MH-72132

Builder

  • NameM/S Shweta Infrastructure & Housing (I) Pvt. Ltd.
  • Entity typeCompany
  • CINU55100MH2005PTC155493
  • GSTIN27AAJCS4306F1ZG
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Managing DirectorSujoy Jayant Gupta
  • DirectorSUDHIR CHANDRAKANT METKAR
  • Other registrations14 more →
  • Completed8 of 15
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects14 →

Key dates

this monthRegisteredApr 2019PromisedDec 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on9 Apr 2019
  • Promised completion30 Dec 2022
  • Revised completionNone
  • Buildings1 building record
  • Documents filed107 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building C -Wing DNA150000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 May 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Building C -Wing D: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 25 May 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed112

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots112
Closed/Covered82
Open Space30

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,890 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Blossom Construwell Pvt. Ltd.NashikNashik

Approvals and building plan

Permissible FSI7225.91
Proposed, not sanctioned7,171 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSai Plaza Nashik Pune Road, Nashik Road

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr Tapasya H Bendale
EngineerSTRUDCOM
EngineerSudhir Metkar
EngineerMr Arun Sonawane
EngineerRakesh Gosavi
Chartered AccountantBCS AND ASSOCIATES LLP
Chartered AccountantA K Chordia and Associates
PartnerRole in project
M/S Shweta Infrastructure & Housing (I) Pvt. Ltd.-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Apr 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Apr 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Feb 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Mar 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 17 Feb 2022

Documents filed107

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 107 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Proforma of Agreement for saleFile: 1 Proforma of AFS Gokuldham 1.pdf25 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 GOK P2 2122.pdf20 May 2023
Status of ConveyanceFile: STATUS CONVEYANCE 1 25.pdf19 May 2023
Status of ConveyanceFile: CONVEYANCE STATUS 26 TO 50.pdf19 May 2023
Status of ConveyanceFile: CONVEYANCE STATUS 51 TO 70.pdf19 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERTIFICATE GOK DEC.pdf18 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest by Directors 31012023.pdf26 Apr 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Gokuldham Proj 2 completion.pdf11 Mar 2023
Disclosure of sold/ booked inventoryFile: Gokul Q1 2223.pdf3 Mar 2023
Disclosure of sold/ booked inventoryFile: Gokul Q2 2223.pdf3 Mar 2023
Disclosure of sold/ booked inventoryFile: Gokul Q3 2223.pdf3 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engr Certificate Gokuldham D Wing Dec 2022.pdf2 Mar 2023
Disclosure of sold/ booked inventoryFile: Gokuldham Proj 2 Q4 2122.pdf2 Mar 2023
Certificates of CA (Form 3)File: Gokuldham Proj 2 Q1 2223.pdf2 Mar 2023
Certificates of CA (Form 3)File: Gokuldham Proj 2 Q2 2223.pdf2 Mar 2023
Certificates of CA (Form 3)File: Gokuldham Proj 2 Q3 22-23.pdf2 Mar 2023
Certificates of CA (Form 3)File: CA Certificate Gokuldham Q4.pdf23 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GOK Proj 2 FORM 2 Oct 2022.pdf11 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GDM Proj 02 FORM 1.pdf10 Jan 2023
Form 2AFile: GDM RERA FORM 2A-16.pdf10 Jan 2023
Form 2AFile: AMZ RERA FORM 2A-14.pdf5 Jan 2023
Form 2AFile: GDM Form 2A Certificate -14.pdf18 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 GOK 02 Oct22.pdf5 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Cert Gokuldham Apr to June 2022.pdf3 Aug 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Arch's Cert 04072022_GOK 02.pdf6 Jul 2022
Form 2AFile: GDM- RERA form 2A -14.pdf30 Jun 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Declaration Deed Wing D04052022_1_15.pdf18 May 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Declaration Deed Wing D04052022_16_27.pdf18 May 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Declaration Deed Wing D 04 05 2022_28_42.pdf18 May 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Declaration Deed Wing D 04 05 2022_43_53.pdf18 May 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Declaration Deed Wing D 04 05 2022_54_63.pdf18 May 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Declaration Deed Wing D 04 05 2022_64_71.pdf18 May 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Arch Cert GDM_2Apr22.pdf7 Apr 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Gokuldham D Wing Mar 22.pdf7 Apr 2022
Form 2AFile: GDM RERA form 2A -13.pdf7 Apr 2022
Building plan approvalFile: Gokuldham WIng D Part Completion 01 _1022022.pdf17 Feb 2022
Building plan approvalFile: Gokuldham WIng D Part Completion 02 _1022022.pdf17 Feb 2022
Building Plan Approval (IOD)File: Gokuldham WIng D Part Completion 01 _1022022.pdf17 Feb 2022
Building Plan Approval (IOD)File: Gokuldham WIng D Part Completion 02 _1022022.pdf17 Feb 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part Completion certificate D Wing upto 12th Floor 01022022.pdf17 Feb 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Gokuldham D wing DEC 2021.pdf27 Jan 2022
Form 2AFile: Form 2A Gokuldham Project 02.pdf10 Jan 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gokuldham 02D wing_compressed.pdf7 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: gokuldham.pdf11 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: gokuldham.pdf7 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_Arch Certificate Gokuldham project 02.pdf4 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engi Cert Gokuldham project 02sept 2021.pdf4 Oct 2021
Proforma of Allotment letterFile: Gokuldham D Wing Carpet Area Ageement 30092021.pdf2 Oct 2021
Form 2AFile: From 2A- GDM-11 Sept21.pdf30 Sep 2021
Disclosure of sold/ booked inventoryFile: Gokuldham.pdf29 Sep 2021
Certificates of CA (Form 3)File: Form 3 - Gokuldham Project 02 - 062021_compressed.pdf6 Sep 2021
Certificates of CA (Form 3)File: Form 3 - Gokuldham Project 02 - 062021_compressed.pdf6 Sep 2021
Certificates of CA (Form 3)File: Form 3 - Gokuldham Project 02 - 122020_compressed (2).pdf30 Aug 2021
Certificates of CA (Form 3)File: Form 3 - Gokuldham Project 02 - 032021_compressed.pdf30 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Gokuldham Jan to Mar21.pdf10 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Gokuldham Apr to June21.pdf10 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_Samraat Gokuldham Project 2 _ 05082021.pdf9 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Gokuldham project02 Q3Dec 20.pdf5 Aug 2021
Disclosure of sold/ booked inventoryFile: Gokuldham D wing.pdf14 Jul 2021
Form 2AFile: GDM Rera fome 2A-10_June 20.pdf25 Jun 2021
Certificates of CA (Form 3)File: Form 3 - Gokuldham Project 02 - 092020 (1).pdf17 Jun 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Gokuldham Form 2 Sept 20.pdf10 Jun 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: GDM -RERA- form 2A -9.pdf10 Jun 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1_Architect certificate_ Gokuldham Project02_21042021.pdf22 Apr 2021
Form 2AFile: GDM form 2A _9.pdf9 Apr 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engi Cert Gokuldham Project 02 _April to June.pdf30 Jan 2021
Certificates of CA (Form 3)File: Form 3 - Gokuldham Project 02 - 062020.pdf29 Jan 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1_Architect certificate_Gokuldham Project02_07012021.pdf8 Jan 2021
Certificates of CA (Form 3)File: GOKULDHAM PROJECT 2.pdf8 Jan 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: SAMRAAT GOKULDHAM.pdf8 Jan 2021
Form 2AFile: Gokuldham RERA fome 2A certificate.pdf6 Jan 2021
Certificates of CA (Form 3)File: Form 3 - Gokuldham Project 02 - 31032020 (1)_compressed (2).pdf1 Oct 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engi Certificate Samraat Gokuldham Project 02 march 20_Form 2.pdf12 Sep 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1_Architect certificate_ Gokuldham Project02_08092020.pdf8 Sep 2020
Form 2AFile: RERA form 2A Gokuldham Certificate-6.pdf3 Jul 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1_Architect certificate_ Gokuldham Project02_08062020.pdf8 Jun 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA Certificate_Gokuldham 3092019.pdf11 May 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA Certificate_Gokuldham 30122019.pdf11 May 2020
Form 2AFile: FORM-2A Gokuldham site Quality certificate 5_.pdf11 May 2020
Certificates of CA (Form 3)File: Form 3 - Gokuldham Project 02 - 092019.pdf9 May 2020

Promoter's earlier projects14

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise11 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Samraat Apna Ghar Phase-IIP51600020657Someshwar Satpur Link Road Near DJ Reva Meadows, Nashik-Apr 2019CompletedDec 2023Late, Jan 2025
Samraat Apna Ghar Phase-IP51600020299Someshwar -Satpur link Road near DJ Reva Meadows, Nashik-Apr 2019CompletedJun 2023Nov 2022
Samraat Symphony Project 02IndiraNagar Nashik Maharashtra28-CompletedDec 2019Mar 2019
Samraat Gokuldham Project 01Hirawadi Mumbai Agra Highway 422003 Nashik Maharashtra241-CompletedDec 2019Oct 2018
Samraat VrindavanOm Nagar Opp Swami Narayan temple Mumbai-Agra Highway Nashik 422003240-CompletedMar 2017Late, Jun 2017
SignatureSerene Meadows Gangapur Road Anandwali Nashik 42201360-CompletedDec 2016Late, Jun 2017
Samraat Symphony Project 03NAGARE NAGAR BEHIND SEVEN HEAVEN HOTEL MUMBAI-AGRA HIGHWAY Nashik 422009112-CompletedDec 2016Late, Jul 2017
Samraat Symphony Project 01Nagare Nagar behind Seven Heaven Hotel MubaiAgra Road Nashik 42200984-CompletedDec 2016Late, Jul 2017
Samraat Tropicano 01Serene Meadows Gangapur Road Anandwali Nashik 422013460-CompletedOct 2016Late, Jul 2017
Dream GrandeurMatoshri Nagar Tidke Colony Nashik 42200216-CompletedJun 2012Late, Nov 2012
Dream NestNear Ryan International School Old Wadala Road Nashik 422006104-CompletedMar 2012Late, May 2012
Dream VillaasGanesh baba Nagar Nashik-Pune Highway Nashik 42201156-CompletedDec 2011Late, Mar 2012
Dream CastleMadhuban Colony Makhamalabad Road Panchavati Nashik 422003106-CompletedDec 2010Late, Apr 2011
Dream FlowerNashik-Pune Highway Opposite Inox MultiPlex Nashik 42200694-CompletedNov 2010Late, Mar 2011

How this compares with Nashik

10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is completed

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Samraat Gokuldham Project 02 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Hirawadi4,100+ in Nashik

2 kmSamraat Gokuldham ProjecCompleted 153Lapsed / revoked 39Other 94Dot size: filed unitsN

Filed coordinates, straight-line distance. 286 registered projects within 2 km.

Builder: M/S Shweta Infrastructure & Housing (I) Pvt. Ltd.

M/S Shweta Infrastructure & Housing (I) Pvt. Ltd. has 15 registrations on MahaRERA, including Samraat Nucleus - Project 01 and Samraat Gokuldham Project 01. Its filings disclose 14 earlier MahaRERA projects: declares 3 of 14 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if Samraat Gokuldham Project 02 is delayed beyond 30 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Samraat Gokuldham Project 02?

The registered promoter entity is M/S Shweta Infrastructure & Housing (I) Pvt. Ltd., a company as per the filing. Its CIN U55100MH2005PTC155493 and GSTIN 27AAJCS4306F1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Samraat Gokuldham Project 02?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Samraat Gokuldham Project 02?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Samraat Gokuldham Project 02?

The professionals named in the filing: Architect: Ar Tapasya H Bendale; Engineer: STRUDCOM; Engineer: Sudhir Metkar; Engineer: Mr Arun Sonawane; Engineer: Rakesh Gosavi; Chartered Accountant: BCS AND ASSOCIATES LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Samraat Gokuldham Project 02?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Samraat Gokuldham Project 02. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Samraat Gokuldham Project 02 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.