Home / Browse projects / Nashik, Maharashtra / Samraat Gokuldham Project 01

Completed No litigation declared Others project

Samraat Gokuldham Project 01

By M/S Shweta Infrastructure & Housing (I) Pvt. Ltd.

RG-MH-01114 · RERA P51600002529 · Last updated on MahaRERA portal: 23 May 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 14 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2019Possession promisedregistration recorded completed
33 of 33Construction stages doneacross 3 buildings; every applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 91 documents Report an error

Samraat Gokuldham Project 01 is a Others project by M/S Shweta Infrastructure & Housing (I) Pvt. Ltd. in Nashik, Maharashtra, registered with MahaRERA as P51600002529 on 1 Aug 2017. The registration is recorded completed; possession was promised by 31 Dec 2019.

At a glance

Project

  • NameSamraat Gokuldham Project 01
  • TypeOthers
  • Location
    • Mumbai Agra Highway
    • Hirawadi
    • Nashik
    • 422003
  • Pincode422003
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600002529
  • ReraGenie IDRG-MH-01114

Builder

  • NameM/S Shweta Infrastructure & Housing (I) Pvt. Ltd.
  • Entity typeCompany
  • CINU55100MH2005PTC155493
  • GSTIN27AAJCS4306F1ZG
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Managing DirectorSujoy Jayant Gupta
  • DirectorSUDHIR CHANDRAKANT METKAR
  • Other registrations14 more →
  • Completed8 of 15
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects14 →

Key dates

this monthRegisteredAug 2017PromisedDec 2019Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on1 Aug 2017
  • Promised completion31 Dec 2019
  • Revised completionNone
  • Buildings3 building records
  • Documents filed91 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building A - Wing ANA170000
Building A - Wing BNA170000
Building B - Wing CNA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 23 May 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

33 of 33 construction stages are filed complete across 3 buildings.

Building A - Wing A100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building A - Wing B100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building B - Wing C100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 23 May 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed241

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots241
Closed/Covered232
Open Space9
BuildingClosed/CoveredOpen SpaceTotal
Building A - Wing A1090109
Building A - Wing B1039112
Building B - Wing C20020

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area10,604 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Blossom Construwell Pvt LtdNashikNashik

Approvals and building plan

Permissible FSI14306.42
Proposed, not sanctioned14,306 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSai Plaza near Bytco College nashik-Pune Highway Nashik Road Nashik 422101

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr Tapasya H Bendale
ArchitectAr Soyuz Talib
EngineerSudhir Metkar
EngineerSTRUDCOM
Chartered AccountantBCS AND ASSOCIATES
Chartered AccountantKALE & ASSOCIATES
PartnerRole in project
M/S Shweta Infrastructure & Housing (I) Pvt. Ltd.-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Oct 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 27 Sep 2019

Documents filed91

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 91 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other Real Estate.pdf23 May 2023
Proforma of Agreement for saleFile: 2 Proforma of AFS letter.pdf23 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Gok 1.pdf22 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's Certificate Form 1_Gokuldham 01.pdf20 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 2018 19 GOK.pdf19 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: gokuldham.pdf7 Oct 2021
Certificates of CA (Form 3)File: CA CERTIFICATE COPY_compressed.pdf30 Sep 2019
Certificates of CA (Form 5)File: Gokuldham P-I.pdf30 Sep 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Gokuldham Completion A,B, C wings.pdf27 Sep 2019
OtherFile: GOKULDHAM FINAL FIRE NOC_300719.pdf8 Jul 2019
Status of Formation of Legal Entity (Society/Co Op etc.)File: DICLARATION OF APARTMENT-GOKULDHAM_compressed-compressed_Part1.pdf13 Jun 2019
Status of Formation of Legal Entity (Society/Co Op etc.)File: DICLARATION OF APARTMENT-GOKULDHAM_compressed-compressed_Part2.pdf13 Jun 2019
Status of Formation of Legal Entity (Society/Co Op etc.)File: DICLARATION OF APARTMENT-GOKULDHAM_compressed-compressed_Part3.pdf13 Jun 2019
Status of Formation of Legal Entity (Society/Co Op etc.)File: DICLARATION OF APARTMENT-GOKULDHAM_compressed-compressed_Part4.pdf13 Jun 2019
Status of Formation of Legal Entity (Society/Co Op etc.)File: DICLARATION OF APARTMENT-GOKULDHAM_compressed-compressed_Part5.pdf13 Jun 2019
Status of Formation of Legal Entity (Society/Co Op etc.)File: DICLARATION OF APARTMENT-GOKULDHAM_compressed-compressed_Part6.pdf13 Jun 2019
Status of Formation of Legal Entity (Society/Co Op etc.)File: DICLARATION OF APARTMENT-GOKULDHAM_compressed-compressed_Part7.pdf13 Jun 2019
Status of Formation of Legal Entity (Society/Co Op etc.)File: DICLARATION OF APARTMENT-GOKULDHAM_compressed-compressed_Part8.pdf13 Jun 2019
Status of Formation of Legal Entity (Society/Co Op etc.)File: DICLARATION OF APARTMENT-GOKULDHAM_compressed-compressed_Part9.pdf13 Jun 2019
Status of Formation of Legal Entity (Society/Co Op etc.)File: DICLARATION OF APARTMENT-GOKULDHAM_compressed-compressed_Part10.pdf13 Jun 2019
Status of Formation of Legal Entity (Society/Co Op etc.)File: DICLARATION OF APARTMENT-GOKULDHAM_compressed-compressed_Part11.pdf13 Jun 2019
Status of Formation of Legal Entity (Society/Co Op etc.)File: DICLARATION OF APARTMENT-GOKULDHAM_compressed-compressed_Part12.pdf13 Jun 2019
Status of Formation of Legal Entity (Society/Co Op etc.)File: DICLARATION OF APARTMENT-GOKULDHAM_compressed-compressed_Part13.pdf13 Jun 2019
Status of Formation of Legal Entity (Society/Co Op etc.)File: DICLARATION OF APARTMENT-GOKULDHAM_compressed-compressed_Part14.pdf13 Jun 2019
Status of ConveyanceFile: DICLARATION OF APARTMENT-GOKULDHAM_compressed-compressed_Part11.pdf13 Jun 2019
Status of ConveyanceFile: DICLARATION OF APARTMENT-GOKULDHAM_compressed-compressed_Part12.pdf13 Jun 2019
Status of ConveyanceFile: DICLARATION OF APARTMENT-GOKULDHAM_compressed-compressed_Part13.pdf13 Jun 2019
Status of ConveyanceFile: DICLARATION OF APARTMENT-GOKULDHAM_compressed-compressed_Part14.pdf13 Jun 2019
Status of ConveyanceFile: DICLARATION OF APARTMENT-GOKULDHAM_compressed-compressed_Part1.pdf12 Jun 2019
Status of ConveyanceFile: DICLARATION OF APARTMENT-GOKULDHAM_compressed-compressed_Part2.pdf12 Jun 2019
Status of ConveyanceFile: DICLARATION OF APARTMENT-GOKULDHAM_compressed-compressed_Part3.pdf12 Jun 2019
Status of ConveyanceFile: DICLARATION OF APARTMENT-GOKULDHAM_compressed-compressed_Part4.pdf12 Jun 2019
Status of ConveyanceFile: DICLARATION OF APARTMENT-GOKULDHAM_compressed-compressed_Part5.pdf12 Jun 2019
Status of ConveyanceFile: DICLARATION OF APARTMENT-GOKULDHAM_compressed-compressed_Part6.pdf12 Jun 2019
Status of ConveyanceFile: DICLARATION OF APARTMENT-GOKULDHAM_compressed-compressed_Part7.pdf12 Jun 2019
Status of ConveyanceFile: DICLARATION OF APARTMENT-GOKULDHAM_compressed-compressed_Part8.pdf12 Jun 2019
Status of ConveyanceFile: DICLARATION OF APARTMENT-GOKULDHAM_compressed-compressed_Part9.pdf12 Jun 2019
Status of ConveyanceFile: DICLARATION OF APARTMENT-GOKULDHAM_compressed-compressed_Part10.pdf12 Jun 2019
Certificates of CA (Form 3)File: Form 3 - Samraat Gokuldham 092018-compressed.pdf2 Jan 2019
Certificates of Architect (Form 4)File: Gokuldham Completion A,B, C wings.pdf5 Nov 2018
Building plan approvalFile: Sheet-1.pdf3 Oct 2018
Building plan approvalFile: Sheet-2.pdf3 Oct 2018
Building plan approvalFile: Sheet-3.pdf3 Oct 2018
Building plan approvalFile: Sheet-4.pdf3 Oct 2018
Building plan approvalFile: Sheet-5.pdf3 Oct 2018
Building Plan Approval (IOD)File: Sheet-1.pdf3 Oct 2018
Building Plan Approval (IOD)File: Sheet-2.pdf3 Oct 2018
Building Plan Approval (IOD)File: Sheet-3.pdf3 Oct 2018
Building Plan Approval (IOD)File: Sheet-4.pdf3 Oct 2018
Building Plan Approval (IOD)File: Sheet-5.pdf3 Oct 2018
Certificates of Architect (Form 4)File: Form 4 Arch certificate for completion Gokuldham01.pdf3 Oct 2018
OtherFile: Gokuldham Completion A,B, C wings.pdf3 Oct 2018
Certificates of CA (Form 5)File: Gokuldham_RERA FORM V.pdf30 Sep 2018
Details of encumbrancesFile: INDEX II - GOKULDHAM.pdf26 Sep 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Attach_1_Architect certificate Gokuldham 120918.pdf17 Sep 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Attach_1_Architect certificate_ Gokuldham 120918.pdf17 Sep 2018
OtherFile: GOKULDHAM FINAL FIRE NOC-2018.pdf3 Sep 2018
OtherFile: Gokuldham Completion Application Reciept.pdf3 Sep 2018
Certificates of CA (Form 3)File: GOKULDHAM RERA CERTIFICATE.pdf16 Aug 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gokuldham Architect Certificate300718compressed.pdf5 Jul 2018
Certificates of CA (Form 3)File: CA Certificate 300418.pdf20 Jun 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg certificate Gokuldham May2018.pdf14 May 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gokuldham Architect Certificate190418.pdf25 Apr 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg certificate Gokuldham_Jan18.pdf24 Jan 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate_Gokuldhan Project 01_200118.pdf22 Jan 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate_gokuldham project 01compressed171017.pdf18 Oct 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certifiacte141017compressed.pdf17 Oct 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certficate_Gokuldham Project 01.pdf25 Jul 2017
Certificates of CA (Form 3)File: CA CERTIFICATE.pdf24 Jul 2017
Layout approvalFile: Gokuldham Sheet 1 of 5.pdf21 Jul 2017
Building plan approvalFile: IOD APPLICATION.pdf21 Jul 2017
Building plan approvalFile: Gokuldham Sheet 1 of 5.pdf21 Jul 2017
Building plan approvalFile: Gokuldham Sheet 2 of 5.pdf21 Jul 2017
Building plan approvalFile: Gokuldham Sheet 3 of 5.pdf21 Jul 2017
Building plan approvalFile: Gokuldham Sheet 4 of 5.pdf21 Jul 2017
Building plan approvalFile: Gokuldham Sheet 5 of 5.pdf21 Jul 2017
PAN CardFile: Entity PAN.pdf21 Jul 2017
Copy of the legal title reportFile: TITLE REPORT--2017.pdf21 Jul 2017
Details of encumbrancesFile: INDEX 2 (Mortgage deed)GOKULDHAM.pdf21 Jul 2017
Copy of Layout Approval (in case of layout)File: Gokuldham Sheet 1 of 5.pdf21 Jul 2017

Promoter's earlier projects14

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise11 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Samraat Apna Ghar Phase-IIP51600020657Someshwar Satpur Link Road Near DJ Reva Meadows, Nashik-Apr 2019CompletedDec 2023Late, Jan 2025
Samraat Apna Ghar Phase-IP51600020299Someshwar -Satpur link Road near DJ Reva Meadows, Nashik-Apr 2019CompletedJun 2023Nov 2022
Samraat Symphony Project 02IndiraNagar Nashik Maharashtra28-CompletedDec 2019Mar 2019
Samraat Gokuldham Project 01Hirawadi Mumbai Agra Highway 422003 Nashik Maharashtra241-CompletedDec 2019Oct 2018
Samraat VrindavanOm Nagar Opp Swami Narayan temple Mumbai-Agra Highway Nashik 422003240-CompletedMar 2017Late, Jun 2017
SignatureSerene Meadows Gangapur Road Anandwali Nashik 42201360-CompletedDec 2016Late, Jun 2017
Samraat Symphony Project 03NAGARE NAGAR BEHIND SEVEN HEAVEN HOTEL MUMBAI-AGRA HIGHWAY Nashik 422009112-CompletedDec 2016Late, Jul 2017
Samraat Symphony Project 01Nagare Nagar behind Seven Heaven Hotel MubaiAgra Road Nashik 42200984-CompletedDec 2016Late, Jul 2017
Samraat Tropicano 01Serene Meadows Gangapur Road Anandwali Nashik 422013460-CompletedOct 2016Late, Jul 2017
Dream GrandeurMatoshri Nagar Tidke Colony Nashik 42200216-CompletedJun 2012Late, Nov 2012
Dream NestNear Ryan International School Old Wadala Road Nashik 422006104-CompletedMar 2012Late, May 2012
Dream VillaasGanesh baba Nagar Nashik-Pune Highway Nashik 42201156-CompletedDec 2011Late, Mar 2012
Dream CastleMadhuban Colony Makhamalabad Road Panchavati Nashik 422003106-CompletedDec 2010Late, Apr 2011
Dream FlowerNashik-Pune Highway Opposite Inox MultiPlex Nashik 42200694-CompletedNov 2010Late, Mar 2011

How this compares with Nashik

10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is completed

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Samraat Gokuldham Project 01 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Hirawadi4,100+ in Nashik

Builder: M/S Shweta Infrastructure & Housing (I) Pvt. Ltd.

M/S Shweta Infrastructure & Housing (I) Pvt. Ltd. has 15 registrations on MahaRERA, including Samraat Nucleus - Project 01 and Samraat Gokuldham Project 01. Its filings disclose 14 earlier MahaRERA projects: declares 3 of 14 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if Samraat Gokuldham Project 01 is delayed beyond 31 Dec 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Samraat Gokuldham Project 01?

The registered promoter entity is M/S Shweta Infrastructure & Housing (I) Pvt. Ltd., a company as per the filing. Its CIN U55100MH2005PTC155493 and GSTIN 27AAJCS4306F1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Samraat Gokuldham Project 01?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Samraat Gokuldham Project 01?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Samraat Gokuldham Project 01?

The professionals named in the filing: Architect: Ar Tapasya H Bendale; Architect: Ar Soyuz Talib; Engineer: Sudhir Metkar; Engineer: STRUDCOM; Chartered Accountant: BCS AND ASSOCIATES; Chartered Accountant: KALE & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Samraat Gokuldham Project 01?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Samraat Gokuldham Project 01. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Samraat Gokuldham Project 01 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.