Home / Browse projects / Pune, Maharashtra / SAMARTH SERENITY BUILDING C

Registered No litigation declared Residential / Group Housing project

SAMARTH SERENITY BUILDING C

By SHREE SWAMI SAMARTH DEVELOPERS

RG-MH-05704 · RERA P52100066558 · Last updated on MahaRERA portal: 31 Dec 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 13 other registrations.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Oct 2026Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 40%
30 of 54Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 83 documents Report an error

SAMARTH SERENITY BUILDING C is a Residential / Group Housing project by SHREE SWAMI SAMARTH DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100066558 on 11 Jun 2024. Possession is promised by 31 Oct 2026. 24 of the 54 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameSAMARTH SERENITY BUILDING C
  • TypeResidential / Group Housing
  • Location
    • CTS NO 121
    • 125 TO 133 SAMARTH SERENITY C WING
    • NEAR SYMBIOSIS UNIVERCITY
    • Kiwale
    • Haveli
    • Pune
    • 412101
  • Pincode412101
  • RERA no.P52100066558
  • ReraGenie IDRG-MH-05704

Builder

  • NameSHREE SWAMI SAMARTH DEVELOPERS
  • Entity typePartnership
  • PartnersMANOJKUMAR PRAKASH SURVE, AMOL PRAKASH SURVE
  • Other registrations13 more →
  • Completed4 of 14
  • No longer live4 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredJun 2024PromisedOct 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Jun 2024
  • Promised completion31 Oct 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed83 files

Current status

44%24 of 54 units booked
30.0%Work done, per cost certificate

Figures as on 31 Dec 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
C WINGNA7754054

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 31 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 40%.

C WING: 35% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure40%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 31 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership7

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,339 sq m
Land owned byThe promoter, with other names on the file
Named landowners7
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on4 Nov 2025
LandownerVillageDistrict
GURUDATTA DEVELOPERSPimpri Chinchawad (M Corp.)Pune
SURYAKANT KONDIBA DANGATKiwalePune
PARASRAM KONDIBA DANGATKiwalePune
MARUTI KONDIBA DANGATKiwalePune
PUSHPA DATTATRAY DANGATKiwalePune
PRANITA DATTATRAY DANGATKiwalePune
AISHWARYA DATTATRAY PINGLEKiwalePune

Approvals and building plan

Permissible FSI6653.89
Proposed, not sanctioned4,312 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchS No 49/2, Ground Floor, Dange Chowk, Bhumkar Chowk Road Tathawade Pune - 411033
Estimated costRs 1.88 cr
Cost incurredRs 56.25 lakh
Work done30.0%
BuildingWingEstimatedIncurred
C WINGNARs 1.12 crRs 45.00 lakh
-NARs 75.00 lakhRs 11.25 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVISION ASSOCIATES TRUPTI BHADRE
EngineerAADHAR ENGINEERS GAURAV PATEL
EngineerSANDESH PANDIRANG KATARE
Chartered AccountantM S KUMBHAR AND ASSOCIATES MANATU KUMBHAR
Chartered AccountantADV SUNIL D AWARE SUNIL AWARE
Chartered AccountantPANKAL PATIL
PartnerRole in project
SHREE SWAMI SAMARTH DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Nov 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Oct 2026

Documents filed83

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 83 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Arch Cert Sep-25.pdf31 Dec 2025
Withdrawal Update Form 2File: Engg Cert Sep-25.pdf31 Dec 2025
Withdrawal Update Form 3File: CA CERT SEP-25 .pdf31 Dec 2025
Form 1File: Arch Cert Mar-25.pdf4 Nov 2025
Form 2File: Engg Cert Mar-25.pdf4 Nov 2025
Form 3File: CA CERT MAR-25 REV.pdf4 Nov 2025
Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD MAR-25.pdf4 Nov 2025
Withdrawal Update Form 1File: ARCH CERT JUN-25.pdf4 Nov 2025
Withdrawal Update Form 1File: Arch Cert Sep-25.pdf4 Nov 2025
Withdrawal Update Form 1File: Arch Cert Sep-25.pdf4 Nov 2025
Withdrawal Update Form 2File: ENGG CERT JUN-24.pdf4 Nov 2025
Withdrawal Update Form 2File: Engg Cert Sep-25.pdf4 Nov 2025
Withdrawal Update Form 2File: Engg Cert Sep-25.pdf4 Nov 2025
Withdrawal Update Form 3File: CA CERT JUN-25.pdf4 Nov 2025
Withdrawal Update Form 3File: CA CERT SEP-25 .pdf4 Nov 2025
Withdrawal Update Form 3File: CA CERT SEP-25 .pdf4 Nov 2025
Form 5 (FY 2024-2025)File: CA AUDIT REPORT24-25.pdf4 Nov 2025
Building plan approvalFile: Comm Cert Sep-25.pdf1 Nov 2025
Building plan approvalFile: Plan Pass 01 Sep-25.pdf1 Nov 2025
Building plan approvalFile: Plan Pass 02 Sep-25.pdf1 Nov 2025
Building plan approvalFile: Plan Pass 03 Sep-25.pdf1 Nov 2025
Building plan approvalFile: Plan Pass 03 Sep-25.pdf1 Nov 2025
Building plan approvalFile: Plan Pass 04 Sep-25.pdf1 Nov 2025
Building plan approvalFile: Plan Pass 05 Sep-25.pdf1 Nov 2025
Building plan approvalFile: Plan Pass 06 Sep-25.pdf1 Nov 2025
Building plan approvalFile: Plan Pass 07 Sep-25.pdf1 Nov 2025
Building plan approvalFile: Plan Pass 08 Sep-25.pdf1 Nov 2025
Building plan approvalFile: Plan Pass 09 Sep-25.pdf1 Nov 2025
Building plan approvalFile: Plan Pass 10 Sep-25.pdf1 Nov 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERT JUN-24.pdf20 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERT SEP-24.pdf20 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERT DEC-24.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERT Q 1 2025.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERT SEPT-24.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERT Q 3.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERT JUN-24.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERT SEPT-24.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERT DEC-24.pdf20 Feb 2025
Other - LegalFile: dangat allotment.pdf20 Feb 2025
Other - LegalFile: Gurudatta Developers Allotment.pdf20 Feb 2025
Other - LegalFile: Gurudatta Developers Allotment.pdf20 Feb 2025
Proforma of Allotment letterFile: Allot Letter_compressed.pdf1 Jun 2024
Layout approvalFile: Updated Layout size_rotated 1.pdf21 May 2024
Copy of the legal title reportFile: SEARCH AND TITLE REPORT 01.pdf21 May 2024
Copy of the legal title reportFile: SEARCH AND TITLE REPORT 02_11zon.pdf21 May 2024
Details of encumbrances concerned to FinanceFile: DEC FINANACE AND LEGAL.pdf21 May 2024
Details of encumbrances concerned to LegalFile: DEC FINANACE AND LEGAL.pdf21 May 2024
Copy of Layout Approval (in case of layout)File: Updated Layout size_rotated 1.pdf21 May 2024
Declaration about Commencement CertificateFile: FORMAR D C C DEC.pdf21 May 2024
Declaration in FORM BFile: FORM B DEVP.pdf21 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERT.pdf21 May 2024
Proforma of Agreement for saleFile: Samarth Serenity C draft.pdf21 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK DEC.pdf21 May 2024
Deviation Report with respect to model copy of AgreementFile: dev to ag to sales.pdf21 May 2024
Other - TechnicalFile: ANNE A.pdf21 May 2024
Other - TechnicalFile: LETTER ON PLOT AREA FINAL.pdf21 May 2024
Other - TechnicalFile: SHREE SWAMI SAMARATH DEVLOPERS C C MAIL.pdf21 May 2024
Other - TechnicalFile: ilovepdf_merged.pdf21 May 2024
Details of encumbrances concerned to FinanceFile: DECLARATION FINANACE AND LEGAL.pdf2 May 2024
Details of encumbrances concerned to LegalFile: DECLARATION FINANACE AND LEGAL.pdf2 May 2024
CERSAI detailsFile: CERSAI DEC 01.pdf2 May 2024
Deviation Report with respect to Allotment letterFile: DEV TO ALL LETTER.pdf2 May 2024
Other - LegalFile: SSSD 23 PARTNERSHIP DEAD.pdf2 May 2024
Other - LegalFile: 1 CTS NO 132 KIWALE DA 01_11zon.pdf2 May 2024
Other - LegalFile: 2 CTS NO 133 KIWALE DAPA MANOJ SURVE 99 GURU_11zon.pdf2 May 2024
Other - LegalFile: 3 CTS NO 133 KIWALE DA GURU_11zon.pdf2 May 2024
Other - TechnicalFile: SRO CERTIFICATE.pdf2 May 2024
Building plan approvalFile: Plan 01 23.pdf22 Apr 2024
Building plan approvalFile: Plan 02.pdf22 Apr 2024
Building plan approvalFile: Plan 03.pdf22 Apr 2024
Building plan approvalFile: Plan 04.pdf22 Apr 2024
Building plan approvalFile: Plan 05.pdf22 Apr 2024
Building plan approvalFile: Plan 06.pdf22 Apr 2024
PAN CardFile: PAN Card.pdf22 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 01 23.pdf22 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 02.pdf22 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 03.pdf22 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 04.pdf22 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 05.pdf22 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 06.pdf22 Apr 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SAMARTH SERENITYCTS NO 121 125 to 132 NEAR SYMBIOSIS UNIVERSITY KIWALE PUNE 4121012CompletedOct 2024Mar 2024

How this compares with Pune

44%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAMARTH SERENITY BUILDING C on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR SYMBIOSIS UNIVERCITY13,700+ in Pune

Builder: SHREE SWAMI SAMARTH DEVELOPERS

SHREE SWAMI SAMARTH DEVELOPERS has 14 registrations on MahaRERA, including SAMARTH HEIGHTS and SHRI SWAMI SAMARTH LEELA. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SAMARTH SERENITY BUILDING C is delayed beyond 31 Oct 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAMARTH SERENITY BUILDING C?

The registered promoter entity is SHREE SWAMI SAMARTH DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAMARTH SERENITY BUILDING C?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAMARTH SERENITY BUILDING C?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAMARTH SERENITY BUILDING C?

The professionals named in the filing: Architect: VISION ASSOCIATES TRUPTI BHADRE; Engineer: AADHAR ENGINEERS GAURAV PATEL; Engineer: SANDESH PANDIRANG KATARE; Chartered Accountant: M S KUMBHAR AND ASSOCIATES MANATU KUMBHAR; Chartered Accountant: ADV SUNIL D AWARE SUNIL AWARE; Chartered Accountant: PANKAL PATIL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAMARTH SERENITY BUILDING C?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAMARTH SERENITY BUILDING C. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAMARTH SERENITY BUILDING C to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.