Home / Browse projects / Pune, Maharashtra / SAMARPIT CITY - A1 and A2

Registration lapsed No litigation declared Residential / Group Housing project

SAMARPIT CITY - A1 and A2

By SADGURU CONSTRUCTIONS

RG-MH-20796 · RERA P52100005177 · Last updated on MahaRERA portal: 8 Nov 2023

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 34 months past the filed date
  • Completion date moved by 48 months
  • 4 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2023Possession promised34 months past this date
12 of 22Construction stages doneacross 2 buildings; furthest along: Staircases, 60%
22 of 32Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 44 documents Report an error

SAMARPIT CITY - A1 and A2 is a Residential / Group Housing project by SADGURU CONSTRUCTIONS in Pune, Maharashtra, registered with MahaRERA as P52100005177 on 10 Aug 2017. Possession was promised by 31 Dec 2023 and is now 34 months past that date. The completion date has moved by 48 months from the original filing. 10 of the 32 units on this registration are recorded sold or booked, and 12 of 22 construction stages are filed complete.

At a glance

Project

  • NameSAMARPIT CITY - A1 and A2
  • TypeResidential / Group Housing
  • Location
    • Gat No. 1190/10
    • Shikrapur
    • Shirur
    • Pune
    • 412208
  • Pincode412208
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100005177
  • ReraGenie IDRG-MH-20796

Builder

  • NameSADGURU CONSTRUCTIONS
  • Entity typePartnership
  • PartnersManish Jaikumar Khubchandani, Tarachand Haranamadas Karamchandani, Madhu Ramesh Khubchandani, Santosh Ananda Awhale

Key dates

34 months past promisethis monthRegisteredAug 2017First promiseDec 2019Revised toDec 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on10 Aug 2017
  • Promised completion31 Dec 2023
  • Revised completionRevised to 31 Dec 2023 (originally 31 Dec 2019)
  • Buildings2 building records
  • Documents filed44 files

Current status

31%10 of 32 units booked

Figures as on 8 Nov 2023, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building A1NA6416016
Building A2NA6416016

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 8 Nov 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 60%.

Building A169%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building A269%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 8 Nov 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes70%
Street LightingYes0%
Community BuildingsYes70%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,430 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on6 Aug 2025

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Development Authority (PMRDA)
Permissible FSI1529.24
Proposed, not sanctioned1,529 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBandhal Complex Shikrapur Pune

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectShailesh Dandane
EngineerAqueel MH
EngineerSudhakar Chatke
Chartered AccountantParth V Jain & Associates
PartnerRole in project
SADGURU CONSTRUCTIONS-

Extensions applied for4

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100006116Dec 2019 → Dec 2020

Reason as filed by the promoter1. There has been a dispute among the Partners of Promoter Firm, owing to which the business operations of the Promoter Firm were shut for a period of approx. 2.5 years. Due to the said dispute, Bank Account of the Promoter Firm was also made inoperative by one of the Partner of Promoter Firm for a period from 01/09/2016 to 15/02/2019. In this regard, copy of bank statement of the Promoter Firm is enclosed as Annexure-1 for your reference and record. On perusal of the attached bank statement your goodself would appreciate that there have been no bank transactions during the said period. 2. The

EXT52100010505Dec 2019 → Dec 2021

Reason as filed by the promoterThe resolution of dispute among the partners took some time and the issues were settled only when the partners of the Promoter Firm entered into a retirement deed in respect of one of its Partner. In this regard, copy of Retirement Deed dated 15/04/2019 is enclosed as Annexure-2 for your reference and record due to which we have requested for the extension of the date of completion of project to 30th December 2020, which is further extended by the Authorities by 6 Months, i.e. 30th June, 2021. The project is almost completed but some minor finishes are pending, however, owing to the prevalent

EXT52100013882Dec 2019 → Jun 2023

Reason as filed by the promoter1.There has been a dispute among the Partners of Promoter Firm, owing to which the business operations of the Promoter Firm were shut for a period of approx. 2.5 years. Due to the said dispute, Bank Account of the Promoter Firm was also made inoperative by one of the Partner of Promoter Firm for a period from 01/09/2016 to 15/02/2019.On perusal of the attached bank statement your goodself would appreciate that there have been no bank transactions during the said period. 2.The resolution of dispute among the partners took some time and the issues were settled only when the partners of the Promo

EXT52100017507Dec 2019 → Dec 2023

Reason as filed by the promoterThe project is almost completed but some minor finishes are pending. Further, there is no supply of electricity, lighting, etc. so as to make it habitable for the customers and apply to authorities for completion. Due to the above, the promoters of the project are unable to complete the project within the prescribed timelines due to the ongoing situations and uncertainty in getting normal business activity on track. The promoters are trying their level best to complete the project at the earliest. Considering the above facts, the project requires extension of the project upto 30th December, 20

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed44

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 3)File: Sadguru Constructions_Form 3_signed.pdf8 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Sadguru Constructions_Form 5 Signed_.pdf8 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE_compressed (1).pdf9 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificates July-2023.pdf9 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance July-2023.pdf9 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificates- Form 1.pdf7 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificates- Form 2.pdf7 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Assurance- Form 2A.pdf7 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance- Form 2A.pdf7 Apr 2023
Disclosure of sold/ booked inventoryFile: Sold and Unsold inventory.pdf7 Apr 2023
Certificates of CA (Form 5)File: Final Form 5.pdf7 Apr 2023
Details of encumbrancesFile: Self declaration rearding Encumbrance.pdf15 Dec 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate.pdf15 Dec 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate.pdf15 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Certificate.pdf15 Dec 2022
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf15 Dec 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's certificate form 1_compressed.pdf17 Mar 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's certificate.pdf17 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 with Annexures_compressed.pdf17 Mar 2022
Declaration about Commencement CertificateFile: Decleration.pdf15 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf15 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Certificate_compressed.pdf15 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Assurance Certificate FY 19-20.pdf15 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance Certificate FY 20-21.pdf15 Aug 2021
Disclosure of sold/ booked inventoryFile: Booked Inventory.pdf15 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: RERA Audit_Form 5-compressed and uploaded.pdf15 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Signed along with Annexures a.pdf10 May 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate.pdf22 Jul 2020
Certificates of CA (Form 5)File: RERA Audit_Form 5-compressed and uploaded.pdf30 Sep 2019
Certificates of CA (Form 5)File: Audit Report.pdf30 Sep 2018
Details of encumbrancesFile: 170731152451_0001.pdf31 Jul 2017
Declaration in FORM BFile: 170731152432_0001.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf31 Jul 2017
Certificates of CA (Form 3)File: 170731154545_0001.pdf31 Jul 2017
Proforma of Allotment letterFile: Sadguru RERA Model Agreement.pdf31 Jul 2017
Proforma of Allotment letterFile: Booking Letter.pdf31 Jul 2017
Layout approvalFile: scan04107.pdf29 Jul 2017
Building plan approvalFile: scan04106.pdf29 Jul 2017
PAN CardFile: PAN.pdf29 Jul 2017
Copy of the legal title reportFile: Search and title.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: scan04107.pdf29 Jul 2017
Building Plan Approval (IOD)File: scan04106.pdf29 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf29 Jul 2017

How this compares with Pune

31%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 48 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAMARPIT CITY - A1 and A2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Shikrapur13,700+ in Pune

2 kmSAMARPIT CITY - A1 and ACompleted 9Lapsed / revoked 18Other 12Dot size: filed unitsN

Filed coordinates, straight-line distance. 39 registered projects within 2 km.

Builder: SADGURU CONSTRUCTIONS

SADGURU CONSTRUCTIONS has 1 registration on MahaRERA, including SAMARPIT CITY - A1 and A2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that SAMARPIT CITY - A1 and A2 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SAMARPIT CITY - A1 and A2 is delayed beyond 31 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAMARPIT CITY - A1 and A2?

The registered promoter entity is SADGURU CONSTRUCTIONS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAMARPIT CITY - A1 and A2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAMARPIT CITY - A1 and A2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAMARPIT CITY - A1 and A2?

The professionals named in the filing: Architect: Shailesh Dandane; Engineer: Aqueel MH; Engineer: Sudhakar Chatke; Chartered Accountant: Parth V Jain & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAMARPIT CITY - A1 and A2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAMARPIT CITY - A1 and A2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAMARPIT CITY - A1 and A2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.