Completed No litigation declared Residential / Group Housing project

SAMARA

By Charisma Builders Ltd

RG-MH-03152 · RERA P51800020854 · Last updated on MahaRERA portal: 21 Jan 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 7 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Oct 2024Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 141 documents Report an error

SAMARA is a Residential / Group Housing project by Charisma Builders Ltd in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800020854 on 15 May 2019. The registration is recorded completed; possession was promised by 31 Oct 2024. The completion date has moved by 7 months from the original filing.

At a glance

Project

  • NameSAMARA
  • TypeResidential / Group Housing
  • Location
    • V. N. Purav Marg
    • Chembur
    • Mumbai
    • Kurla
    • Mumbai Suburban
    • 400071
  • Pincode400071
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800020854
  • ReraGenie IDRG-MH-03152

Builder

  • NameCharisma Builders Ltd
  • Entity typeCompany
  • CINU45400MH2007PLC176256
  • GSTIN27AADCC2290E1ZX
  • Managing DirectorSudhir Vasu Shetty

Key dates

this monthRegisteredMay 2019First promiseMar 2024Revised toOct 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on15 May 2019
  • Promised completion31 Oct 2024
  • Revised completionRevised to 31 Oct 2024 (originally 30 Mar 2024)
  • Buildings1 building record
  • Documents filed141 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Resi and commercial buildingNA150000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Resi and commercial building: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 21 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed44

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots44
Closed/Covered44

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area964 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on27 Sep 2024

Approvals and building plan

Permissible FSI3250.51
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch118-121, Swastik Chambers, Sion Trombay Road, Chembur, Mumbai 400071

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
Charisma Builders Ltd-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800019506Mar 2024 → Jul 2024

Reason as filed by the promoterProject completed 98% and only 4 unsold units as on 31-03-2024. OC compliances are in process. We are awaiting for fire NOC.

EXT51800024429Mar 2024 → Oct 2024

Reason as filed by the promoterWe have now received CFO NOC as on date all other OC compliances are in process. Expecting OC in few days.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Apr 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Apr 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Apr 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 21 Jan 2025

Documents filed141

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 141 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Jun-24.pdf21 Jan 2025
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf21 Jan 2025
Certificates of CA (Form 3)File: Form 3 Sep-24.pdf21 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC 120924.pdf21 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure Sep-24.pdf21 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5.pdf21 Jan 2025
Declaration about Commencement CertificateFile: Form D.pdf8 Aug 2024
Declaration in FORM BFile: Form B.pdf8 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Jun-24.pdf8 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Jun24.pdf8 Aug 2024
Disclosure of sold/ booked inventoryFile: Disclousre Jun 2024.pdf8 Aug 2024
Certificates of CA (Form 3)File: Form 3 compressed.pdf8 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Mar-24.pdf18 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Mar-24.pdf18 Jun 2024
Certificates of CA (Form 3)File: Samara RERA From-3.pdf12 Jun 2024
Building plan approvalFile: Approved Drawing 1.pdf13 Apr 2024
Building plan approvalFile: Approved Drawing 2 and 3.pdf13 Apr 2024
Building Plan Approval (IOD)File: Approved Drawing 1.pdf13 Apr 2024
Building Plan Approval (IOD)File: Approved Drawing 2 and 3.pdf13 Apr 2024
Declaration about Commencement CertificateFile: Form D.pdf13 Apr 2024
Declaration in FORM BFile: Form B.pdf13 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1 Mar-24.pdf2 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure Mar-24.pdf2 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1.pdf29 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 Sep 23.pdf29 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf29 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form-2A Sep 23.pdf29 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf29 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure Sep 23.pdf29 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure Dec-23.pdf29 Jan 2024
Certificates of CA (Form 3)File: Form 3.pdf29 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf5 Jan 2024
Certificates of CA (Form 3)File: Form-3 Sep 23.pdf6 Nov 2023
Certificates of CA (Form 3)File: Form 3 compressed.pdf2 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf31 Jul 2023
Disclosure of sold/ booked inventoryFile: Disclosure June 23.pdf31 Jul 2023
Building plan approvalFile: Approved Drawing_11zon_11zon.pdf29 Jul 2023
Building plan approvalFile: Approved Amended Letter.pdf29 Jul 2023
Building Plan Approval (IOD)File: Approved Drawing_11zon_11zon.pdf29 Jul 2023
Building Plan Approval (IOD)File: Approved Amended Letter.pdf29 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: 2386725_FurtherCC_signed (1).pdf29 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf29 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf29 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Mar 23.pdf17 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Mar 23.pdf17 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Mar-23.pdf17 May 2023
Disclosure of sold/ booked inventoryFile: Disclosure 31-03-2023.pdf17 May 2023
Certificates of CA (Form 3)File: Form 3 Mar23.pdf17 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration of Separate Bank Account.pdf11 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other RERA Projects.pdf10 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 FY 2021 22.pdf18 Mar 2023
Proforma of Agreement for saleFile: Draft AGREEMENT FOR SALE.pdf18 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate ( Form 1 ).pdf6 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Dec-22.pdf6 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Dec-22.pdf6 Feb 2023
Disclosure of sold/ booked inventoryFile: Disclosure Dec-22.pdf6 Feb 2023
Certificates of CA (Form 3)File: Form 3 Dec-22 compressed.pdf6 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Sep-22.pdf22 Nov 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sep-22.pdf22 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A.pdf22 Nov 2022
Disclosure of sold/ booked inventoryFile: Disclosure Sept 2022.pdf22 Nov 2022
Certificates of CA (Form 3)File: Form 3 Sep-22_compressed.pdf22 Nov 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1.pdf30 Aug 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2.pdf30 Aug 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf30 Aug 2022
Disclosure of sold/ booked inventoryFile: Disclosure Jun-22.pdf30 Aug 2022
Certificates of CA (Form 3)File: Form-3_compressed (2).pdf30 Aug 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf29 Jun 2022
CERSAI detailsFile: Undertaking 2022.pdf29 Jun 2022
Certificates of CA (Form 3)File: FORM 3 Mar 22.pdf25 Jun 2022
Certificates of CA (Form 3)File: FORM 3 Mar 22.pdf25 Jun 2022
Disclosure of sold/ booked inventoryFile: Disclousre as on Dec 2021.pdf24 Jun 2022
Disclosure of sold/ booked inventoryFile: Disclousre AS on Mar 2022.pdf24 Jun 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: CBL letter to SICH.pdf24 Jun 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Letter Received From SICHS.pdf24 Jun 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf10 Mar 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf10 Mar 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf10 Mar 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf9 Mar 2022
Certificates of CA (Form 3)File: FORM - 3 Dec-21_compressed (2).pdf9 Mar 2022

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 7 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAMARA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Chembur, Mumbai6,700+ in Mumbai Suburban

2 kmSAMARACompleted 158Lapsed / revoked 123Other 154Dot size: filed unitsN

Filed coordinates, straight-line distance. 435 registered projects within 2 km.

Builder: Charisma Builders Ltd

Charisma Builders Ltd has 1 registration on MahaRERA, including SAMARA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SAMARA is delayed beyond 31 Oct 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAMARA?

The registered promoter entity is Charisma Builders Ltd, a company as per the filing. Its CIN U45400MH2007PLC176256 and GSTIN 27AADCC2290E1ZX can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAMARA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAMARA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in SAMARA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAMARA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAMARA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.