Home / Browse projects / Thane, Maharashtra / SAI WORLD DREAMS PHASE 3 TOWER NO. 4 SPRING

Registered No litigation declared Residential / Group Housing project

SAI WORLD DREAMS PHASE 3 TOWER NO. 4 SPRING

By Out N Out Infotech India LLP

RG-MH-33305 · RERA P51700080658 · Last updated on MahaRERA portal: 14 Jul 2026

Source: official MahaRERA filing

Red flags

  • Rs 110.75 crore secured on the land, in favour of IndusInd Bank
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 11 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Slabs of Super Structure, 10%
124 of 233Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 97 documents Report an error

SAI WORLD DREAMS PHASE 3 TOWER NO. 4 SPRING is a Residential / Group Housing project by Out N Out Infotech India LLP in Thane, Maharashtra, registered with MahaRERA as P51700080658 on 23 Jun 2025. Possession is promised by 31 Dec 2030. 109 of the 233 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameSAI WORLD DREAMS PHASE 3 TOWER NO. 4 SPRING
  • TypeResidential / Group Housing
  • Location
    • Kalyan Shill Road
    • Dombivali East
    • gharivle
    • Kalyan
    • Thane
    • 421204
  • Pincode421204
  • RERA no.P51700080658
  • ReraGenie IDRG-MH-33305

Builder

  • NameOut N Out Infotech India LLP
  • Entity typePartnership
  • PartnersMadhu Bhagwandas Bathija, Amit Madhu Bathija, Manish Madhu Bathija
  • Other registrations3 more →
  • Declared earlier projects11 →

Key dates

this monthRegisteredJun 2025PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Jun 2025
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings1 building record
  • Documents filed97 files

Current status

47%109 of 233 units booked
48.8%Work done, per cost certificate

Figures as on 14 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower no 4NA42302330233

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 14 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 10%.

Tower no 4: 46% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 14 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed233

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots233
Closed/Covered233

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area3,000 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofIndusInd Bank
Secured amountRs 110.75 crore
CERSAI search filedYes
Declared on26 Dec 2025

Approvals and building plan

Sanctioning authorityMMRDA
Permissible FSI34287.66
Proposed, not sanctioned34,288 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR, SHOP. NO. 5, MAHATMA PHULE BHAVAN, PLOT NO.66, SECTOR NO.17, VASHI, NAVI MUMBAI- 400 703
Estimated costRs 171.03 cr
Cost incurredRs 83.41 cr
Work done48.77%
BuildingWingEstimatedIncurred
Tower no 4NARs 163.00 crRs 83.41 cr
-NARs 8.03 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSpaceage Consultants
ArchitectHitensethi Associates
EngineerStructural concept Designs Pvt Ltd
EngineerPrabhu Chavan
Chartered AccountantRangani & Co
Chartered AccountantS U Radhakrishnani & co
PartnerRole in project
Out N Out Infotech India LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 May 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Apr 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Dec 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed97

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 97 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf14 Jul 2026
Withdrawal Update Form 2File: Form 2.pdf14 Jul 2026
Withdrawal Update Form 3File: Form 3.pdf14 Jul 2026
Form 2A (FY 2025-2026)File: SWD PHASE III.pdf7 May 2026
Withdrawal Update Form 1File: Form 1.pdf15 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf15 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf15 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf6 Feb 2026
Withdrawal Update Form 2File: Form 2.pdf6 Feb 2026
Withdrawal Update Form 3File: Form 3.pdf6 Feb 2026
Withdrawal Update Form 1File: Form 1.pdf17 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf17 Jan 2026
Withdrawal Update Form 3File: Form 3.pdf17 Jan 2026
Building plan approvalFile: Sheet 13 of 25.pdf27 Dec 2025
Form 1File: Form 1.pdf15 Oct 2025
Form 2File: Form 2.pdf15 Oct 2025
Form 3File: Form 3.pdf15 Oct 2025
Disclosure of Sold and Booked InventoryFile: Inventory.pdf15 Oct 2025
Self-declaration of Quarterly ProgressFile: Self Declaration.pdf15 Oct 2025
Form 1File: Form 1.pdf16 Jul 2025
Form 2File: Form 2.pdf16 Jul 2025
Form 3File: Form 3.pdf16 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory.pdf16 Jul 2025
Self-declaration of Quarterly ProgressFile: Undertaking.pdf16 Jul 2025
Other - TechnicalFile: RECEIPT MAHARERA-.pdf14 Jun 2025
Other - TechnicalFile: Letter.pdf9 Jun 2025
Declaration about Commencement CertificateFile: Tower 4 CC Layout.pdf7 Jun 2025
Declaration about Commencement CertificateFile: Declaration.pdf7 Jun 2025
Other - TechnicalFile: Declaration.pdf7 Jun 2025
Other - TechnicalFile: Tower 4 CC Layout.pdf7 Jun 2025
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT AFS.pdf7 Jun 2025
Proforma of Agreement for saleFile: AFS SWD SPRING.pdf7 Jun 2025
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured Unsecured Finance.pdf7 Jun 2025
Copy of the legal title reportFile: Title Report.pdf5 May 2025
Proforma of Allotment letterFile: ALLOTMENT LETTER Final.pdf5 May 2025
Other - LegalFile: 44-1.pdf5 May 2025
Other - LegalFile: घारीवली_645__फेरफार pg 13.pdf5 May 2025
Declaration about Commencement CertificateFile: Declaration for Commencement Certificate.pdf5 May 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Declaration RERA Designated Account Format A.pdf5 May 2025
Deviation Report with respect to Allotment letterFile: DEVIATION REPORT AL.pdf5 May 2025
Declaration in FORM BFile: Form B.pdf8 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Spring.pdf7 Apr 2025
Other - LegalFile: ONO 7-12.pdf7 Apr 2025
Other - TechnicalFile: Spring Email.pdf7 Apr 2025
Other - TechnicalFile: Declaration Cum Undertaking Annexure A Spring.pdf7 Apr 2025
Layout approvalFile: Tower 4 - LOI 2023.pdf5 Apr 2025
Layout approvalFile: LOI.pdf5 Apr 2025
Building plan approvalFile: 1.pdf5 Apr 2025
Building plan approvalFile: 2.pdf5 Apr 2025
Building plan approvalFile: 3.pdf5 Apr 2025
Building plan approvalFile: 4.pdf5 Apr 2025
Building plan approvalFile: 5.pdf5 Apr 2025
Building plan approvalFile: 6.pdf5 Apr 2025
Building plan approvalFile: 7.pdf5 Apr 2025
Building plan approvalFile: 8.pdf5 Apr 2025
Building plan approvalFile: 9.pdf5 Apr 2025
Building plan approvalFile: 10.pdf5 Apr 2025
Building plan approvalFile: 11.pdf5 Apr 2025
Building plan approvalFile: 12.pdf5 Apr 2025
Building plan approvalFile: 13.pdf5 Apr 2025
Building plan approvalFile: 14.pdf5 Apr 2025
Building plan approvalFile: 15.pdf5 Apr 2025
Building plan approvalFile: 16.pdf5 Apr 2025
Building plan approvalFile: 17.pdf5 Apr 2025
Copy of Layout Approval (in case of layout)File: Tower 4 - LOI 2023.pdf5 Apr 2025
Copy of Layout Approval (in case of layout)File: LOI.pdf5 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf5 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 17.pdf5 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 16.pdf5 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 15.pdf5 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 14.pdf5 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 13.pdf5 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 12.pdf5 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 11.pdf5 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 10.pdf5 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 8.pdf5 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 9.pdf5 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 1.pdf5 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf5 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf5 Apr 2025

Promoter's earlier projects11

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

11 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SAI WONDERSECTOR 35F KHARGHAR NAVI MUMBAI95CompletedJul 2017May 2017
SAI SOLITAIRESECTOR 35H KHARGHAR NAVI MUMBAI83CompletedJul 2017Jun 2017
SAI GANGASECTOR 5 ULWE62CompletedMay 2017Jan 2017
SAI SAHILSECTOR 5 ULWE NAVI MUMBAI50CompletedMay 2017Apr 2017
SAI FORTUNESECTOR 8 ULWE99CompletedDec 2016Nov 2016
SAI CRYSTALSECTOR 35D KHARGHAR NAVI MUMBAI166CompletedOct 2016Sep 2016
SAI SPRINGSECTOR 35G KHARGHAR NAVI MUMBAI148CompletedAug 2016Jul 2016
SAI MIRACLESECTOR 35E110CompletedAug 2016Jul 2016
SAI HARMONYSECTOR 21 ULWE115CompletedJul 2016Jul 2016
SAI MOKSHSECTOR 15 KHARGHAR NAVI MUMBAI73CompletedAug 2015Jun 2015
SAI SAPPHIRESECTOR 20 ULWE NAVI MUMBAI162CompletedJul 2015Jul 2015

How this compares with Thane

47%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAI WORLD DREAMS PHASE 3 TOWER NO. 4 SPRING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dombivali East7,600+ in Thane

Builder: Out N Out Infotech India LLP

Out N Out Infotech India LLP has 4 registrations on MahaRERA, including SAI WORLD DREAMS PHASE 1 and SAI WORLD DREAMS PHASE 2. Its filings disclose 11 earlier MahaRERA projects: declares 11 of 11 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SAI WORLD DREAMS PHASE 3 TOWER NO. 4 SPRING is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAI WORLD DREAMS PHASE 3 TOWER NO. 4 SPRING?

The registered promoter entity is Out N Out Infotech India LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAI WORLD DREAMS PHASE 3 TOWER NO. 4 SPRING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAI WORLD DREAMS PHASE 3 TOWER NO. 4 SPRING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAI WORLD DREAMS PHASE 3 TOWER NO. 4 SPRING?

The professionals named in the filing: Architect: Spaceage Consultants; Architect: Hitensethi Associates; Engineer: Structural concept Designs Pvt Ltd; Engineer: Prabhu Chavan; Chartered Accountant: Rangani & Co; Chartered Accountant: S U Radhakrishnani & co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAI WORLD DREAMS PHASE 3 TOWER NO. 4 SPRING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAI WORLD DREAMS PHASE 3 TOWER NO. 4 SPRING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAI WORLD DREAMS PHASE 3 TOWER NO. 4 SPRING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.