Home / Browse projects / Satara, Maharashtra / SAI VILLAS BUILDING-A, BUILDING-B AND BUILDING-C

Registration lapsed No litigation declared Residential / Group Housing project

SAI VILLAS BUILDING-A, BUILDING-B AND BUILDING-C

By SAI DREAMS ASSOCIATES

RG-MH-15935 · RERA P52700025465 · Last updated on MahaRERA portal: 18 Sep 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 4 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.
Jun 2026Possession promised4 months past this date
19 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 66%
0Complaints at MahaRERAon this registration
Jump to the 142 documents Report an error

SAI VILLAS BUILDING-A, BUILDING-B AND BUILDING-C is a Residential / Group Housing project by SAI DREAMS ASSOCIATES in Satara, Maharashtra, registered with MahaRERA as P52700025465 on 3 Jun 2020. Possession was promised by 30 Jun 2026 and is now 4 months past that date.

At a glance

Project

  • NameSAI VILLAS BUILDING-A, BUILDING-B AND BUILDING-C
  • TypeResidential / Group Housing
  • Location
    • -
    • PHALATAN
    • Jadhavwadi (563279)
    • Phaltan
    • Satara
    • 415523
  • Pincode415523
  • RERA no.P52700025465
  • ReraGenie IDRG-MH-15935

Builder

  • NameSAI DREAMS ASSOCIATES
  • Entity typePartnership
  • PartnersROHIT ANIL BEDKE, VINIT RAMESH DESHMUKH

Key dates

4 months past promisethis monthRegisteredJun 2020PromisedJun 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on3 Jun 2020
  • Promised completion30 Jun 2026
  • Revised completionNone
  • Buildings3 building records
  • Documents filed142 files

Current status

62.5%Work done, per cost certificate

Figures as on 18 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SAI VILLAS BUILDING -ANA20000
SAI VILLAS BUILDING-BNA20000
SAI VILLAS BUILDING-CNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 18 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

19 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 66%.

SAI VILLAS BUILDING -A73%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
SAI VILLAS BUILDING-B75%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%
SAI VILLAS BUILDING-C33%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure66%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed8

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots8
Open Space8

Land and ownership6

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,547 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on29 May 2026
LandownerVillageDistrict
SHRI VILAS SAHEBRAO RASALPhaltan (M Cl)Satara
SAU ARATI VILAS RASALPhaltan (M Cl)Satara
SHRI BALKRUSHAN GULABRAO SASTEPhaltan (M Cl)Satara
SAU SUMAN BALKRUSHN SASTEPhaltan (M Cl)Satara
SHRI ABHIJEET BALKRUSHN SASTEPhaltan (M Cl)Satara
SHRI SATYAJIT BALKRUSHNA SASTEPhaltan (M Cl)Satara

Approvals and building plan

Sanctioning authorityTehsildar Phaltan
Permissible FSI1378.52
Proposed, not sanctioned1,379 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRAJWADA AT POST AND TAL PHALATAN DIST SATARA
Estimated costRs 2.99 cr
Cost incurredRs 1.87 cr
Work done62.45%
BuildingWingEstimatedIncurred
SAI VILLAS BUILDING -ANARs 74.80 lakhRs 46.72 lakh
SAI VILLAS BUILDING-BNARs 74.80 lakhRs 46.72 lakh
SAI VILLAS BUILDING-CNARs 74.80 lakhRs 46.72 lakh
-NARs 74.80 lakhRs 46.72 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMR RAHUL L NALAWADE
EngineerMR SAGAR J SHINDE
EngineerTanuj Adgale
Chartered AccountantMR SUJAY BALKRISHNA CHAVAN
Chartered AccountantAjit Bhoite & Associates
PartnerRole in project
SAI DREAMS ASSOCIATES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Mar 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Mar 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Mar 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Mar 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed142

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 142 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM1 june 2026.PDF18 Sep 2026
Withdrawal Update Form 2File: form 2 june 30 2026.PDF18 Sep 2026
Withdrawal Update Form 3File: Form 3 June 30 2026.PDF18 Sep 2026
Withdrawal Update Form 1File: FORM 1 32026 (1).pdf3 Sep 2026
Withdrawal Update Form 2File: form 2 mar 26.PDF3 Sep 2026
Withdrawal Update Form 3File: mar 25.PDF3 Sep 2026
Form 2A (FY 2026-2027)File: 2526.PDF3 Sep 2026
Withdrawal Update Form 1File: form 1 march 25.pdf17 Aug 2026
Withdrawal Update Form 2File: mar 25.PDF17 Aug 2026
Withdrawal Update Form 3File: mar 25.PDF17 Aug 2026
Withdrawal Update Form 1File: form 1 march 25.pdf28 Jul 2026
Withdrawal Update Form 1File: form 1 march 25.pdf28 Jul 2026
Withdrawal Update Form 2File: mar 25.PDF28 Jul 2026
Withdrawal Update Form 2File: mar 25.PDF28 Jul 2026
Withdrawal Update Form 3File: mar 25.PDF28 Jul 2026
Withdrawal Update Form 3File: mar 25.PDF28 Jul 2026
Withdrawal Update Form 1File: form 1 march 25.pdf24 Jul 2026
Withdrawal Update Form 2File: 20260522-124359 - 23-23 mar 26.PDF24 Jul 2026
Withdrawal Update Form 3File: 20260522-124854 -23-23 mar 26.PDF24 Jul 2026
Form 2A (FY 2020-2021)File: 2021.PDF25 Jun 2026
Form 2A (FY 2021-2022)File: 2122.PDF25 Jun 2026
Form 2A (FY 2022-2023)File: 2223.PDF25 Jun 2026
Form 2A (FY 2023-2024)File: 2324.PDF25 Jun 2026
Form 2A (FY 2024-2025)File: 2425.PDF25 Jun 2026
Form 2A (FY 2025-2026)File: 2425.PDF25 Jun 2026
Form 1File: sept 24.PDF18 Jun 2026
Form 2File: sept 24.PDF18 Jun 2026
Form 3File: sept 24.PDF18 Jun 2026
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf18 Jun 2026
Form 1File: dec 24.PDF18 Jun 2026
Form 2File: dec 24.PDF18 Jun 2026
Form 3File: dec 24.PDF18 Jun 2026
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf18 Jun 2026
Form 1File: march 25.PDF18 Jun 2026
Form 2File: mar 25.PDF18 Jun 2026
Form 3File: mar 25.PDF18 Jun 2026
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf18 Jun 2026
Form 5 (FY 2024-2025)File: 24 25.PDF18 Jun 2026
Form 5 (FY 2020-2021)File: 20 21.PDF11 Jun 2026
Form 5 (FY 2021-2022)File: 21 22.PDF11 Jun 2026
Form 5 (FY 2022-2023)File: 22 23.PDF11 Jun 2026
Form 5 (FY 2023-2024)File: 23 24.PDF11 Jun 2026
Form 1File: june 2020.pdf9 Jun 2026
Form 2File: form 2 june 2020.pdf9 Jun 2026
Form 3File: june 2020.pdf9 Jun 2026
Disclosure of Sold and Booked InventoryFile: SRO.pdf9 Jun 2026
Form 1File: sept 2020.PDF9 Jun 2026
Form 2File: sept 2020.PDF9 Jun 2026
Form 3File: sept 2020.PDF9 Jun 2026
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf9 Jun 2026
Form 1File: dec 2020.PDF9 Jun 2026
Form 2File: dec 2020.PDF9 Jun 2026
Form 3File: dec 2020.PDF9 Jun 2026
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf9 Jun 2026
Form 1File: dec 21.PDF9 Jun 2026
Form 2File: mar 21.PDF9 Jun 2026
Form 3File: mar 21.PDF9 Jun 2026
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf9 Jun 2026
Form 1File: june 21.PDF9 Jun 2026
Form 2File: june 21.PDF9 Jun 2026
Form 3File: june 21.PDF9 Jun 2026
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf9 Jun 2026
Form 1File: sept 21.PDF9 Jun 2026
Form 2File: sept 21.PDF9 Jun 2026
Form 3File: sept 21.PDF9 Jun 2026
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf9 Jun 2026
Form 2File: dec 21.PDF9 Jun 2026
Form 1File: dec 21.PDF9 Jun 2026
Form 3File: des 21.PDF9 Jun 2026
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf9 Jun 2026
Form 1File: mar 22.PDF9 Jun 2026
Form 2File: mar 22.PDF9 Jun 2026
Form 3File: mar 22.PDF9 Jun 2026
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf9 Jun 2026
Form 1File: june 22.PDF9 Jun 2026
Form 2File: june 22.PDF9 Jun 2026
Form 3File: june 22.PDF9 Jun 2026
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf9 Jun 2026
Form 1File: sept 22.PDF9 Jun 2026
Form 2File: sept 22.PDF9 Jun 2026

How this compares with Satara

16%of Satara projects moved their completion datethis one has not
35%of Satara registrations have lapsed or been cancelledthis one is among them

Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.

Keep SAI VILLAS BUILDING-A, BUILDING-B AND BUILDI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PHALATAN1,100+ in Satara

Builder: SAI DREAMS ASSOCIATES

SAI DREAMS ASSOCIATES has 1 registration on MahaRERA, including SAI VILLAS BUILDING-A, BUILDING-B AND BUILDING-C. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Satara district page.

Frequently asked questions

What does it mean that SAI VILLAS BUILDING-A, BUILDING-B AND BUILDING-C shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SAI VILLAS BUILDING-A, BUILDING-B AND BUILDING-C is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAI VILLAS BUILDING-A, BUILDING-B AND BUILDING-C?

The registered promoter entity is SAI DREAMS ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAI VILLAS BUILDING-A, BUILDING-B AND BUILDING-C?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAI VILLAS BUILDING-A, BUILDING-B AND BUILDING-C?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAI VILLAS BUILDING-A, BUILDING-B AND BUILDING-C?

The professionals named in the filing: Architect: MR RAHUL L NALAWADE; Engineer: MR SAGAR J SHINDE; Engineer: Tanuj Adgale; Chartered Accountant: MR SUJAY BALKRISHNA CHAVAN; Chartered Accountant: Ajit Bhoite & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAI VILLAS BUILDING-A, BUILDING-B AND BUILDING-C?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAI VILLAS BUILDING-A, BUILDING-B AND BUILDING-C. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAI VILLAS BUILDING-A, BUILDING-B AND BUILDI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.