SAI SIDDHI

By DHARMENDRA SINGH PARIHAR

RG-MH-60225 · RERA P99000014781 · Last updated on MahaRERA portal: 14 Apr 2022

Source: official MahaRERA filing

Red flags

  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Jul 2019Possession promisedregistration recorded completed
10 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 80%
0Complaints at MahaRERAon this registration
Jump to the 22 documents Report an error

SAI SIDDHI is a Residential / Group Housing project by DHARMENDRA SINGH PARIHAR in Palghar, Maharashtra, registered with MahaRERA as P99000014781 on 2 Jan 2018. The registration is recorded completed; possession was promised by 18 Jul 2019.

At a glance

Project

  • NameSAI SIDDHI
  • TypeResidential / Group Housing
  • Location
    • MAKANE ROAD PANDIT PADA
    • SAPHALE
    • Makane
    • Palghar
    • 401404
  • Pincode401404
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000014781
  • ReraGenie IDRG-MH-60225

Builder

  • NameDHARMENDRA SINGH PARIHAR
  • Entity typeIndividual

Key dates

this monthRegisteredJan 2018PromisedJul 2019Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on2 Jan 2018
  • Promised completion18 Jul 2019
  • Revised completionNone
  • Buildings2 building records
  • Documents filed22 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A TYPENA60000
B TYPENA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 14 Apr 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 80%.

A TYPE53%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B TYPE53%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 14 Apr 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,301 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI1778.88
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch777, GAURAV GARDENS MIRA BHAYANDER ROAD

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHANTANU RAJARAM VICHARE
PartnerRole in project
DHARMENDRA SINGH PARIHAR-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000002123Jul 2019 → Jul 2020

Reason as filed by the promoterReason for delay the electric supply cannot be running time to time. and crack, send by govt not issue in time for royalty.

EXT99000008891Jul 2019 → Jun 2021

Reason as filed by the promoterReason axtended for covid-19. other some problem need to site. and also ready for our site wing B . wing A 90 % completed but material and labour problem are faced for covid-19. no labour availabe at this time so i try for my best ASAP for complete the work. so please my humble request provide extend for this certify.

EXT99000009958Jul 2019 → Oct 2022

Reason as filed by the promoterDear Sir We Request for our projecct Sai Siddhi wing A. the labour problem faced again. and at no labour is available on the site. for covid-19. and our site wing B is already ready for the possesion. Please our request a extend the our project next 7 to 8 months. provide the all legel document please check and revert soon.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Dec 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Dec 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Dec 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Apr 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 16 Jun 2021

Documents filed22

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration about Commencement CertificateFile: Cerculer 32.pdf14 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2 A.pdf14 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 5 20-21.pdf14 Apr 2022
Disclosure of sold/ booked inventoryFile: Shree Enter SOLD UNLS.pdf14 Apr 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 19-20.pdf14 Apr 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 20-21.pdf14 Apr 2022
Commencement Certificates / NA Order for plotted developmentFile: CC Saphala.pdf9 Apr 2022
Declaration in FORM BFile: Sold Unsold .pdf9 Apr 2022
Annual Audit Report of Statutory CA (Form 5)File: Form 05.pdf9 Apr 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Sai Siddhi OC.pdf16 Jun 2021
Architect’s Certificate on Completion of Project (Form 4)File: Sai Siddhi Form-4.pdf16 Jun 2021
Annual Audit Report of Statutory CA (Form 5)File: Form 5 Rera.pdf23 Sep 2019
Building plan approvalFile: LAYOUT APPROVAL.pdf26 Dec 2017
Layout approvalFile: LAYOUT APPROVAL.pdf26 Dec 2017
PAN CardFile: PAN CARD.pdf26 Dec 2017
Copy of the legal title reportFile: LEGAL REPORT.pdf26 Dec 2017
Details of encumbrancesFile: SEARCH REPORT.pdf26 Dec 2017
Copy of Layout Approval (in case of layout)File: LAYOUT APPROVAL.pdf26 Dec 2017
Building Plan Approval (IOD)File: LAYOUT APPROVAL.pdf26 Dec 2017
Declaration in FORM BFile: FORM B.pdf26 Dec 2017
Certificates of CA (Form 3)File: CA CERTIFICATE.pdf26 Dec 2017
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf26 Dec 2017

How this compares with Palghar

31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is completed

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAI SIDDHI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SAPHALE3,200+ in Palghar

2 kmSAI SIDDHICompleted 21Lapsed / revoked 7Other 28Dot size: filed unitsN

Filed coordinates, straight-line distance. 56 registered projects within 2 km.

Builder: DHARMENDRA SINGH PARIHAR

DHARMENDRA SINGH PARIHAR has 1 registration on MahaRERA, including SAI SIDDHI. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if SAI SIDDHI is delayed beyond 18 Jul 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAI SIDDHI?

The registered promoter entity is DHARMENDRA SINGH PARIHAR, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAI SIDDHI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAI SIDDHI?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAI SIDDHI?

The professionals named in the filing: Architect: SHANTANU RAJARAM VICHARE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAI SIDDHI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAI SIDDHI. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAI SIDDHI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.