ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / SAI RACHANA APARTMENT

Registered No litigation declared Others project

SAI RACHANA APARTMENT

By Singh enterprises Builders & developers

RG-MH-99789 · RERA P99000004057 · Last updated on MahaRERA portal: 6 Feb 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 78 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 78 months from the original
9 of 11Construction stages donefurthest along: Basement (if any), 0%
32 of 63Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 98 documents Report an error

SAI RACHANA APARTMENT is a Others project by Singh enterprises Builders & developers in Palghar, Maharashtra, registered with MahaRERA as P99000004057 on 7 Aug 2017. Possession is promised by 31 Dec 2027. The completion date has moved by 78 months from the original filing. 31 of the 63 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameSAI RACHANA APARTMENT
  • TypeOthers
  • Location
    • Palghar
    • Padghe
    • 401404
  • Pincode401404
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000004057
  • ReraGenie IDRG-MH-99789

Builder

  • NameSingh enterprises Builders & developers
  • Entity typePartnership
  • PartnersShailesh surendra singh, Bipin Batuk Singh

Key dates

this monthRegisteredAug 2017First promiseJun 2021Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Aug 2017
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 30 Jun 2021)
  • Buildings1 building record
  • Documents filed98 files

Current status

49%31 of 63 units booked
100.0%Work done, per cost certificate

Figures as on 6 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SAI RACHANA APARTMENTNA5555863

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

SAI RACHANA APARTMENT: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 6 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed70

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots70
Closed/Covered70

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,386 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on3 Sep 2025
LandownerVillageDistrict
SHALIGRAM BUILDERS AND DEVELOPERSVasai-Virar City (M Corp)Palghar

Approvals and building plan

Sanctioning authorityCOLLECTOR
Permissible FSI2386.45
Proposed, not sanctioned2,386 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNARAYAN NAGAR, NALASOPARA, PALGHAR
Estimated costRs 3.91 cr
Cost incurredRs 3.91 cr
Work done100.0%
BuildingWingEstimatedIncurred
SAI RACHANA APARTMENTNARs 3.86 crRs 3.86 cr
-NARs 5.25 lakhRs 5.25 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMANOJ SHARMA
ArchitectSWAPNIL ADSUL
EngineerPARESH UNNARKAR
EngineerRAHUL KAPOOR
Chartered AccountantNIKHIL MALAIYA
Chartered Accountantashwin nair
PartnerRole in project
Singh enterprises Builders & developers-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000009770Jun 2021 → Dec 2023

Reason as filed by the promoterDue to lockdown manpower was not available, material supply was stuck,

EXT99000024210Jun 2021 → Dec 2025

Reason as filed by the promoterDuring the execution of project there were 3 years of pandemic but its effect on our industry were beyond that. Before covid the contractor who started the project was replaced by another contractor as he was not avilable. Due to change in contractor the project got delayed. There was also non availibility of certain materials in construction. Our allottes know the situation hence has given us time to complete the project.

EA25122518992Jun 2021 → Dec 2027

Reason as filed by the promoterDUE to some unavoidable reasons the project could not be completed before time.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Jul 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Jul 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed98

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 98 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 - DEC 2025.pdf6 Feb 2026
Withdrawal Update Form 2File: FORM 2 - DEC 2025.pdf6 Feb 2026
Withdrawal Update Form 3File: FORM 3 DEC 2025.pdf6 Feb 2026
Withdrawal Update Form 1File: form 1 -SEPT 2025.pdf25 Dec 2025
Withdrawal Update Form 2File: FORM 2 - SEPT 2025.pdf25 Dec 2025
Withdrawal Update Form 3File: FORM 3 SEPT 2025.pdf25 Dec 2025
Withdrawal Update Form 1File: form 1.pdf22 Dec 2025
Withdrawal Update Form 2File: FORM 2.pdf22 Dec 2025
Withdrawal Update Form 3File: form 3.pdf22 Dec 2025
Withdrawal Update Form 1File: form 1.pdf3 Sep 2025
Withdrawal Update Form 1File: form 1.pdf3 Sep 2025
Withdrawal Update Form 2File: FORM 2.pdf3 Sep 2025
Withdrawal Update Form 2File: FORM 2.pdf3 Sep 2025
Withdrawal Update Form 3File: form 3.pdf3 Sep 2025
Withdrawal Update Form 3File: form 3.pdf3 Sep 2025
Layout approvalFile: LAYOUT SR.pdf16 Jul 2024
Building plan approvalFile: FLOOR PLAN 1.pdf16 Jul 2024
Building plan approvalFile: FLOOR PLAN 2.pdf16 Jul 2024
Building plan approvalFile: FLOOR PLAN 3.pdf16 Jul 2024
Layout approvalFile: LAYOUT SR highlighted.pdf16 Jul 2024
Copy of Layout Approval (in case of layout)File: LAYOUT SR.pdf16 Jul 2024
Copy of Layout Approval (in case of layout)File: LAYOUT SR highlighted.pdf16 Jul 2024
Building Plan Approval (IOD)File: FLOOR PLAN 1.pdf16 Jul 2024
Building Plan Approval (IOD)File: FLOOR PLAN 2.pdf16 Jul 2024
Building Plan Approval (IOD)File: FLOOR PLAN 3.pdf16 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: IMG-20240716-WA0001 (1)_organized (1).pdf16 Jul 2024
Declaration about Commencement CertificateFile: form d.pdf16 Jul 2024
Building plan approvalFile: Building Plan 1 Converted.pdf2 Jul 2024
Building plan approvalFile: Building Plan 2 Converted.pdf2 Jul 2024
Building plan approvalFile: Building Plan 3 Converted.pdf2 Jul 2024
Layout approvalFile: Layout Plan - converted.pdf2 Jul 2024
Copy of Layout Approval (in case of layout)File: Layout Plan - converted.pdf2 Jul 2024
Building Plan Approval (IOD)File: Building Plan 1 Converted.pdf2 Jul 2024
Building Plan Approval (IOD)File: Building Plan 2 Converted.pdf2 Jul 2024
Building Plan Approval (IOD)File: Building Plan 3 Converted.pdf2 Jul 2024
Declaration in FORM BFile: Form B.pdf2 Jul 2024
Deviation Report with respect to Allotment letterFile: Deviation Allotment Letter.pdf2 Jul 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Sale Deed.pdf2 Jul 2024
Other - TechnicalFile: Form B.pdf2 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Q1.pdf1 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Q2.pdf1 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Q3.pdf1 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Q4.pdf1 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Q2.pdf1 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Q2.pdf1 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Q3.pdf1 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Q4.pdf1 Jul 2024
Proforma of Agreement for saleFile: Sale Deed.pdf1 Jul 2024
Details of encumbrances concerned to FinanceFile: Declaration for Legal.pdf29 Jun 2024
Details of encumbrances concerned to LegalFile: Declaration for Legal.pdf29 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Q1.pdf29 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Q2.pdf29 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Q4.pdf29 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Q1.pdf29 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Architect Certificate Q3.pdf29 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Q2.pdf29 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Q2.pdf29 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Q3.pdf29 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Q4.pdf29 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 2021-22.pdf29 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 2022-23.pdf29 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 2023-24.pdf29 Jun 2024
CERSAI detailsFile: Undertaking For CERSAI.pdf29 Jun 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory Details.pdf29 Jun 2024
Certificates of CA (Form 3)File: CA Form 3 Q1.pdf29 Jun 2024
Certificates of CA (Form 3)File: CA From 3 Q2.pdf29 Jun 2024
Certificates of CA (Form 3)File: Form 3 Q3.pdf29 Jun 2024
Certificates of CA (Form 3)File: Ca Form 3 Q4.pdf29 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Surendra.pdf29 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Bipin.pdf29 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 2021-22.pdf29 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 2022-23.pdf29 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 2023-24.pdf29 Jun 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Bank account declaration.pdf29 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: download (2).pdf12 Jul 2021
Declaration about Commencement CertificateFile: Declaration About Commencement Certificate.pdf12 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form - 2A.pdf12 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form - 2A.pdf12 Jul 2021
Disclosure of sold/ booked inventoryFile: Disclosure of Sold.pdf12 Jul 2021
Certificates of CA (Form 5)File: 2017-18.pdf2 Jul 2021

How this compares with Palghar

49%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one moved by 78 months
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAI RACHANA APARTMENT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Padghe3,200+ in Palghar

2 kmSAI RACHANA APARTMENTCompleted 4Lapsed / revoked 16Other 4Dot size: filed unitsN

Filed coordinates, straight-line distance. 24 registered projects within 2 km.

Builder: Singh enterprises Builders & developers

Singh enterprises Builders & developers has 1 registration on MahaRERA, including SAI RACHANA APARTMENT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if SAI RACHANA APARTMENT is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAI RACHANA APARTMENT?

The registered promoter entity is Singh enterprises Builders & developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAI RACHANA APARTMENT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAI RACHANA APARTMENT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAI RACHANA APARTMENT?

The professionals named in the filing: Architect: MANOJ SHARMA; Architect: SWAPNIL ADSUL; Engineer: PARESH UNNARKAR; Engineer: RAHUL KAPOOR; Chartered Accountant: NIKHIL MALAIYA; Chartered Accountant: ashwin nair. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAI RACHANA APARTMENT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAI RACHANA APARTMENT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAI RACHANA APARTMENT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.