Home / Browse projects / Pune, Maharashtra / SAI PARK TOWN

Registered No litigation declared Others project

SAI PARK TOWN

By Shree Sai Reality

RG-MH-26574 · RERA P52100014452 · Last updated on MahaRERA portal: 30 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 72 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 72 months from the original
43 of 44Construction stages doneacross 4 buildings; furthest along: Podiums (if any), 0%
20 of 167Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 94 documents Report an error

SAI PARK TOWN is a Others project by Shree Sai Reality in Pune, Maharashtra, registered with MahaRERA as P52100014452 on 4 Dec 2017. Possession is promised by 30 Dec 2026. The completion date has moved by 72 months from the original filing. 147 of the 167 units on this registration are recorded sold or booked, and 43 of 44 construction stages are filed complete.

At a glance

Project

  • NameSAI PARK TOWN
  • TypeOthers
  • Location
    • Maharashtra
    • Kiwle
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 412101
  • Pincode412101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100014452
  • ReraGenie IDRG-MH-26574

Builder

  • NameShree Sai Reality
  • Entity typePartnership
  • PartnersSANDEEP DEENDAYAL AGARWAL, SUMEET DEENDAYAL AGARWAL, SACHIN DEENDAYAL AGARWAL, KAPIL SATPAL AGARWAL

Key dates

this monthRegisteredDec 2017First promiseDec 2020Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Dec 2017
  • Promised completion30 Dec 2026
  • Revised completionRevised to 30 Dec 2026 (originally 31 Dec 2020)
  • Buildings4 building records
  • Documents filed94 files

Current status

88%147 of 167 units booked
100.0%Work done, per cost certificate

Figures as on 30 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Sai Parktown Wing BNA161040040
Sai Parktown Wing ANA9502929
Sai Parktown Wing CNA161040040
Sai Parktown Wing DNA1610382058

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 30 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

43 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Podiums (if any), at 0%.

Sai Parktown Wing B100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Sai Parktown Wing A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Sai Parktown Wing C100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Sai Parktown Wing D100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 30 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed118

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots118
Closed/Covered118
BuildingClosed/CoveredTotal
Sai Parktown Wing B3939
Sai Parktown Wing A66
Sai Parktown Wing C3434
Sai Parktown Wing D3939

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,050 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on3 Jun 2026

Approvals and building plan

Sanctioning authorityPIMPRI CHINCHWAD
Permissible FSI11510.0
Proposed, not sanctioned4,510 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKALYANI CHAMBERS, NIGDI, PUNE 411044
Estimated costRs 33.27 cr
Cost incurredRs 33.27 cr
Work done100.0%
BuildingWingEstimatedIncurred
Sai Parktown Wing DNARs 9.92 crRs 9.92 cr
Sai Parktown Wing BNARs 8.29 crRs 8.29 cr
Sai Parktown Wing CNARs 7.95 crRs 7.95 cr
Sai Parktown Wing ANARs 3.85 crRs 3.85 cr
-NARs 3.26 crRs 3.26 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectYOGESH SHANKARLAL MANASKE
EngineerBhanuvilas Pundlik Bhawsar
EngineerMahesh
EngineerARUN PATIL
EngineerAbhijit Sutar
Chartered AccountantSUMEET SURESH KATE
Chartered AccountantNikhil Inani
PartnerRole in project
Shree Sai Reality-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100000328Dec 2020 → Dec 2021

Reason as filed by the promoterProject Completion Date was mentioned incorrectly by oversight.

EXT52100027907Dec 2020 → Dec 2026

Reason as filed by the promoterWe have received the part occupancy certificate, for building B,C,D and applied for occupancy certificate for building A, which is pending with the authority, hence we are applying for extension till 31/12/2026.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Dec 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Dec 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Dec 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 6 Jul 2023

Documents filed94

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 94 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 q3 fy 25-26.pdf30 Jun 2026
Withdrawal Update Form 2File: Form 2 FY 25-26 Q3.pdf30 Jun 2026
Withdrawal Update Form 3File: Form_3_SS Reality_Q3 FY25-26 Final_compressed.pdf30 Jun 2026
Form 5 (FY 2024-2025)File: form 5.pdf30 Jun 2026
Withdrawal Update Form 1File: form-1 shree sai reality -Q-1.pdf26 Jun 2026
Withdrawal Update Form 1File: Form 1 Q 2 fy 25-26.pdf26 Jun 2026
Withdrawal Update Form 1File: Form 1 q3 fy 25-26.pdf26 Jun 2026
Withdrawal Update Form 2File: Form 2 FY 25-26 Q2.pdf26 Jun 2026
Withdrawal Update Form 2File: Form 2 FY 25-26 Q2.pdf26 Jun 2026
Withdrawal Update Form 2File: Form 2 FY 25-26 Q3.pdf26 Jun 2026
Withdrawal Update Form 3File: SHREE SAI REALITY FORM -3 Q-1.pdf26 Jun 2026
Withdrawal Update Form 3File: Form_3_SS Reality_Q2 _FY 25-26 Final_compressed (1).pdf26 Jun 2026
Withdrawal Update Form 3File: Form_3_SS Reality_Q3 FY25-26 Final_compressed.pdf26 Jun 2026
Form 5 (FY 2023-2024)File: Form 5 23-24.pdf24 Jun 2026
Form 2A (FY 2024-2025)File: FORM -2A SHREE SAI REALITY-Q-4.pdf3 Jun 2026
Withdrawal Update Form 1File: form-1 shree sai reality -Q-1.pdf2 Jun 2026
Withdrawal Update Form 2File: Form 2 Q1 FY 25-26.pdf2 Jun 2026
Withdrawal Update Form 3File: SHREE SAI REALITY FORM -3 Q-1.pdf2 Jun 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form-1 shree sai reality -Q-4.pdf3 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2 SHREE SAI REALITY-Q-4.pdf3 May 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD SHREE SAI REALITY - Q-4.pdf3 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM -2A SHREE SAI REALITY-Q-4.pdf3 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: SS REALITY FORM - 2A MARCH 24 .pdf3 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf29 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: SS REALITY FORM 2A - 31-03-24 1111.pdf29 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SHREE SAI REALITY- FORM-1 SIGN (1).pdf28 Mar 2025
Certificates of CA (Form 3)File: SHREE SAI REALITY Form 3 Q 4 FY 22-23.pdf28 Mar 2025
Certificates of CA (Form 3)File: SHREE SAI REALITY Form 3 Q 4 FY 22-23.pdf28 Mar 2025
Certificates of CA (Form 3)File: SHREE SAI REALITY Form 3 Q 1 FY 23-24.pdf28 Mar 2025
Certificates of CA (Form 3)File: SHREE SAI REALITY Form 3 Q 2 FY 23-24.pdf28 Mar 2025
Certificates of CA (Form 3)File: SHREE SAI REALITY Form 3 Q 3 FY 23-24.pdf28 Mar 2025
Certificates of CA (Form 3)File: SHREE SAI REALITY Form 3 Q 4 FY 23-24.pdf28 Mar 2025
Certificates of CA (Form 3)File: june 24 form 3.pdf28 Mar 2025
Certificates of CA (Form 3)File: sep 24 form 3.pdf28 Mar 2025
Certificates of CA (Form 3)File: dec 24 form 3.pdf28 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 june 24.pdf28 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 sep 24.pdf28 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SHREE SAI REALITY FORM 2 Q4 FY 23-24.pdf28 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SHREE SAI REALITY FORM 2 Q3 FY 23-24.pdf28 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SHREE SAI REALITY FORM 2 Q1 FY 23-24.pdf28 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SHREE SAI REALITY FORM 2 Q4 FY 22-23.pdf28 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SHREE SAI REALITY FORM 2 Q3 FY 22-23.pdf28 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SHREE SAI REALITY- FORM -2 -Q-3 FY 24-25.pdf28 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SHREE SAI REALITY FORM 2 Q2 FY 23-24.pdf28 Mar 2025
Disclosure of sold/ booked inventoryFile: SHREE SAI REALITY Sold-Unsold -Q3 23-24 f.pdf28 Mar 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD - SHREE SAI REALITY (1).pdf28 Mar 2025
Disclosure of sold/ booked inventoryFile: SHREE SAI REALITY Sold-Unsold -Q3 24-25.pdf28 Mar 2025
Disclosure of sold/ booked inventoryFile: SHREE SAI REALITY Sold-Unsold -Q2 24-25.pdf28 Mar 2025
Disclosure of sold/ booked inventoryFile: SHREE SAI REALITY Sold-Unsold -Q1 24-25.pdf28 Mar 2025
Disclosure of sold/ booked inventoryFile: SHREE SAI REALITY Sold-Unsold -Q4 23-24.pdf28 Mar 2025
Disclosure of sold/ booked inventoryFile: SHREE SAI REALITY Sold-Unsold -Q2 23-24.pdf28 Mar 2025
Disclosure of sold/ booked inventoryFile: SHREE SAI REALITY Sold-Unsold -Q1 23-24.pdf28 Mar 2025
Disclosure of sold/ booked inventoryFile: SHREE SAI REALITY Sold-Unsold -Q4 22-23.pdf28 Mar 2025
Disclosure of sold/ booked inventoryFile: SHREE SAI REALITY Sold-Unsold - Q3 22-23.pdf28 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: SHREE SAI REALITY Sold-Unsold - Q3 22-23.pdf28 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: SHREE SAI REALITY Form 2A Q4 FY 23-24.pdf28 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: SHREE SAI REALITY Form 5.pdf28 Mar 2025
Declaration in FORM BFile: Form B Sai park town.pdf20 Mar 2025
Other - TechnicalFile: Part chart sai park.pdf20 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5-20-21.pdf3 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5-21-22.pdf3 Apr 2024
Proforma of Agreement for saleFile: FORM 5-21-22.pdf3 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 3 FORM 2A 2022 23 REALITY.pdf29 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: shree sai reality Form 5.pdf29 Dec 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Cert.pdf6 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 3 FORM 2A SEP 2022 REALITY.pdf9 Jan 2023
Certificates of CA (Form 3)File: 4 FORM-3 SEP 2022 REALITY_compressed.pdf9 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 FORM-1 SEP 2022 REALITY.pdf27 Dec 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2 FORM 2 SEP 2022 REALITY.pdf27 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 3 FORM 2A SEP 2022 REALITY.pdf27 Dec 2022
Disclosure of sold/ booked inventoryFile: 5 SOLD AND UNSOLD SEP 2022 REALITY_compressed.pdf27 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM -5 2018-19 Sai Park Town.pdf25 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM -5 2019-20 Sai Park Town.pdf25 Nov 2022
Certificates of CA (Form 3)File: Chartered Account Certificate (1)_compressed.pdf3 Sep 2021
Declaration about Commencement CertificateFile: FORM D SAIPARKTOWN (1).pdf1 Sep 2021
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY SAIPARKTWON (1)_compressed.pdf1 Sep 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 REALITY JUNE 2021 ABHISHEK CHINTAMANI.pdf26 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A REALITY JUNE 2021 ABHISHEK CHINTAMANI.pdf26 Aug 2021
Certificates of CA (Form 3)File: FORM 3 CA CERTIFICATE MARCH 2021.pdf26 Aug 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: SOCIETY CERTIFICATE INFORMATION.pdf26 Aug 2021

How this compares with Pune

88%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 72 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAI PARK TOWN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kiwle13,700+ in Pune

2 kmSAI PARK TOWNCompleted 75Lapsed / revoked 49Other 101Dot size: filed unitsN

Filed coordinates, straight-line distance. 225 registered projects within 2 km.

Builder: Shree Sai Reality

Shree Sai Reality has 1 registration on MahaRERA, including SAI PARK TOWN. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SAI PARK TOWN is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAI PARK TOWN?

The registered promoter entity is Shree Sai Reality, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAI PARK TOWN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAI PARK TOWN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAI PARK TOWN?

The professionals named in the filing: Architect: YOGESH SHANKARLAL MANASKE; Engineer: Bhanuvilas Pundlik Bhawsar; Engineer: Mahesh; Engineer: ARUN PATIL; Engineer: Abhijit Sutar; Chartered Accountant: SUMEET SURESH KATE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAI PARK TOWN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAI PARK TOWN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAI PARK TOWN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.