SAI AASHIRWAD COMPLEX

By AASHIRWAD DEVELOPER

RG-MH-28937 · RERA P99000027337 · Last updated on MahaRERA portal: 14 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 42 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 42 months from the original
20 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
15 of 37Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 97 documents Report an error

SAI AASHIRWAD COMPLEX is a Residential / Group Housing project by AASHIRWAD DEVELOPER in Palghar, Maharashtra, registered with MahaRERA as P99000027337 on 4 Dec 2020. Possession is promised by 31 Dec 2026. The completion date has moved by 42 months from the original filing. 22 of the 37 units on this registration are recorded sold or booked, and 20 of 22 construction stages are filed complete.

At a glance

Project

  • NameSAI AASHIRWAD COMPLEX
  • TypeResidential / Group Housing
  • Location
    • Kanchan Universe
    • Vaghulsar
    • Palghar West
    • Mahim
    • Palghar
    • 401404
  • Pincode401404
  • RERA no.P99000027337
  • ReraGenie IDRG-MH-28937

Builder

  • NameAASHIRWAD DEVELOPER
  • Entity typePartnership
  • PartnersRajeshkumar Prabhunath Singh, SUNITA RAJESH KUMAR SINGH

Key dates

this monthRegisteredDec 2020First promiseJun 2023Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Dec 2020
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Jun 2023)
  • Buildings2 building records
  • Documents filed97 files

Current status

59%22 of 37 units booked

Figures as on 14 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building No-1,Wing A and BNA53121325
Building No-1A,Wing C and DNA5312012

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 14 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

Building No-1,Wing A and B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building No-1A,Wing C and D91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 14 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed6

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots6
Closed/Covered2
Open Space4
BuildingClosed/CoveredOpen SpaceTotal
Building No-1,Wing A and B123
Building No-1A,Wing C and D123

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,285 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Rajesh JainSaphalePalghar

Approvals and building plan

Sanctioning authorityPALHAR COLLECTOR OFFICE
Permissible FSI1054.43
Proposed, not sanctioned1,054 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNikisha Arcade Goddev Phatak Road, Bhayander East, Thane

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectParesh Gharat
EngineerGanesh Awhad
Chartered AccountantR D Lukad & Co
PartnerRole in project
AASHIRWAD DEVELOPER-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000024123Jun 2023 → Jun 2025

Reason as filed by the promoterEXTENSION REQUIRED TO COMPLETE THE STATUTORY COMPLIANCE TO OBTAIN OCCUPANCY CERTIFICATE

EXT99000017953Jun 2023 → Jun 2024

Reason as filed by the promoterDue To Covid Non availabity of material and labour

EA07072501969Jun 2023 → Dec 2026

Reason as filed by the promoterWe request an extension of the project's MahaRERA registration as several critical works under Interior Services and External Development are still in progress and are scheduled for phased completion up to December 2026, as per the detailed PERT chart submitted. While the structural and finishing works were largely completed by March 2024, the remaining work - including electrical meter room installation, rainwater harvesting system, landscaping, driveway, compound lighting, and other external service provisions - require additional time due to: Sequencing of technical and finishing stages, De

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Nov 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Nov 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Nov 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Nov 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed97

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 97 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architech-Form 1.pdf14 May 2026
Withdrawal Update Form 1File: Architech-Form 1.pdf14 May 2026
Withdrawal Update Form 2File: Form2.pdf14 May 2026
Withdrawal Update Form 2File: Form2.pdf14 May 2026
Withdrawal Update Form 3File: 6.pdf14 May 2026
Withdrawal Update Form 3File: 6.pdf14 May 2026
Withdrawal Update Form 1File: Architech-Form 1.pdf30 Dec 2025
Withdrawal Update Form 2File: Form2.pdf30 Dec 2025
Withdrawal Update Form 3File: 6.pdf30 Dec 2025
Form 2A (FY 2020-2021)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21).pdf1 Aug 2025
Form 2A (FY 2021-2022)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22) .pdf1 Aug 2025
Form 2A (FY 2022-2023)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23).pdf1 Aug 2025
Form 2A (FY 2023-2024)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24).pdf1 Aug 2025
Form 2A (FY 2024-2025)File: Form 2A (10) (1).pdf1 Aug 2025
Form 5 (FY 2020-2021)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21).pdf1 Aug 2025
Form 5 (FY 2021-2022)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22).pdf1 Aug 2025
Form 5 (FY 2024-2025)File: fORM 5- 2024-2025.pdf1 Aug 2025
Form 5 (FY 2022-2023)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23).pdf1 Aug 2025
Form 5 (FY 2023-2024)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24).pdf1 Aug 2025
Form 1File: FORM 1 APR TO JUNE 24.pdf31 Jul 2025
Form 2File: form 2 april to june 24.pdf31 Jul 2025
Form 3File: FORM 3 APRIL 4-JUNE24.pdf31 Jul 2025
Disclosure of Sold and Booked InventoryFile: 6 (1).pdf31 Jul 2025
Form 1File: FORM 1 TO MARCH 25.pdf31 Jul 2025
Form 2File: form 2 jan to march 25.pdf31 Jul 2025
Form 3File: FORM 3 JAN 25 MARCH 25_0001.pdf31 Jul 2025
Disclosure of Sold and Booked InventoryFile: Jan-March-25.pdf31 Jul 2025
Form 1File: FORM 1 OCT TO DEC 24.pdf31 Jul 2025
Form 2File: form 2 oct to dec 24.pdf31 Jul 2025
Form 3File: FORM 3 OCT 24-DEC24_0001.pdf31 Jul 2025
Disclosure of Sold and Booked InventoryFile: Oct-Dec-24.pdf31 Jul 2025
Form 1File: FORM 1 JULY TO SEP 24.pdf31 Jul 2025
Form 2File: form 2 july to sep 24.pdf31 Jul 2025
Form 3File: FORM 3 JULY 24-SEP24_0001.pdf31 Jul 2025
Disclosure of Sold and Booked InventoryFile: july to sep24.pdf31 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf6 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf6 Mar 2025
Disclosure of sold/ booked inventoryFile: SOLD AND UNSOLD.pdf6 Mar 2025
Details of encumbrances concerned to FinanceFile: Legal.pdf25 Jun 2024
Details of encumbrances concerned to LegalFile: Legal.pdf25 Jun 2024
Declaration about Commencement CertificateFile: Circular 32-CC COPY DECLARATION- FORM D -latest_page-0001.pdf25 Jun 2024
Declaration in FORM BFile: AFFIDAVIT_compressed.pdf25 Jun 2024
CERSAI detailsFile: Cersai.pdf25 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosuer of Interest in Other Real Estate Projects- Rajesh_page-0001.pdf25 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosuer of Interest in Other Real Estate Projects-Sunita SIngh_page-0001.pdf25 Jun 2024
Proforma of Agreement for saleFile: Rera Draft mahim 414 924 Plot 20 bldg no 1 ( Poonam Komal Saroj ) 06 - C.pdf25 Jun 2024
Deviation Report with respect to Allotment letterFile: Deviation-Allotment.pdf25 Jun 2024
Deviation Report with respect to model copy of AgreementFile: Deviation-Agreement.pdf25 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AASHIRWAD FORM 3.pdf31 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf28 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf28 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seperate Bank Account.pdf28 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech-Form 1.pdf14 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2.pdf14 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2.pdf14 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf14 May 2024
Disclosure of sold/ booked inventoryFile: inventory _page-0001.pdf14 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf14 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf14 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow2 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seperate Bank.pdf23 Apr 2024
Other - FinanceFile: Declaration Cum Undertaking.pdf23 Apr 2024
Declaration in FORM BFile: AASHIRWAD DEVELOPER AFFIDAVIT.pdf21 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: fORM1 Aashirwad developers.pdf10 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form-2 sai ashirwad.pdf10 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form2A20-21.pdf10 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form2a 21-22.pdf10 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form2A fy22-23.pdf10 Nov 2023
Disclosure of sold/ booked inventoryFile: INVENTORY DISCLOURE.pdf10 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECH CERTIFICATE.pdf7 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 CA CERTITFICATE 20-21.pdf7 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 CA CERTIFICATE 21-22.pdf7 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 CA CERTIFICATE 22-23.pdf7 Nov 2023
OtherFile: Aashirwad Further Clarification.pdf29 Nov 2020
OtherFile: Aashirwad Further Clarification.pdf29 Nov 2020
OtherFile: Aashirwad Further Clarification.pdf29 Nov 2020
OtherFile: Aashirwad Clarification.pdf28 Nov 2020
OtherFile: Aashirwad declaration.pdf27 Nov 2020
OtherFile: Aashirwad FSI purchase deed-1-8.pdf27 Nov 2020
Commencement Certificates / NA Order for plotted developmentFile: Aashirwad cc.pdf26 Nov 2020

How this compares with Palghar

59%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one moved by 42 months
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAI AASHIRWAD COMPLEX on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Vaghulsar, Palghar West3,200+ in Palghar

Builder: AASHIRWAD DEVELOPER

AASHIRWAD DEVELOPER has 1 registration on MahaRERA, including SAI AASHIRWAD COMPLEX. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if SAI AASHIRWAD COMPLEX is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAI AASHIRWAD COMPLEX?

The registered promoter entity is AASHIRWAD DEVELOPER, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAI AASHIRWAD COMPLEX?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAI AASHIRWAD COMPLEX?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAI AASHIRWAD COMPLEX?

The professionals named in the filing: Architect: Paresh Gharat; Engineer: Ganesh Awhad; Chartered Accountant: R D Lukad & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAI AASHIRWAD COMPLEX?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAI AASHIRWAD COMPLEX. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAI AASHIRWAD COMPLEX to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.