Home / Browse projects / Mumbai Suburban, Maharashtra / SAFAL TRADEMARK

Registered No litigation declared Residential / Group Housing project

SAFAL TRADEMARK

By JAI MATA DI HOME CONSTRUCTION PVT LTD

RG-MH-25169 · RERA P51800003754 · Last updated on MahaRERA portal: 29 Jul 2026

Source: official MahaRERA filing

Red flags

  • 30 complaints at MahaRERA
  • Completion date moved by 36 months
  • 5 extensions taken
  • Rs 45.00 crore secured on the land, in favour of BANK OF INDIA

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 36 months from the original
5 of 11Construction stages donefurthest along: Internal walls, 95%
40 of 252Units unsoldnot recorded sold or booked
30Complaints at MahaRERAon this registration
Jump to the 176 documents Report an error

SAFAL TRADEMARK is a Residential / Group Housing project by JAI MATA DI HOME CONSTRUCTION PVT LTD in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800003754 on 6 Aug 2017. Possession is promised by 31 Dec 2026. The completion date has moved by 36 months from the original filing. 212 of the 252 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete. 30 complaints are on record with the regulator.

At a glance

Project

  • NameSAFAL TRADEMARK
  • TypeResidential / Group Housing
  • Location
    • V.N.PURAV MARG
    • CHEMBUR
    • Kurla
    • Mumbai Suburban
    • 400071
  • Pincode400071
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800003754
  • ReraGenie IDRG-MH-25169

Builder

  • NameJAI MATA DI HOME CONSTRUCTION PVT LTD
  • Entity typeCompany
  • GSTIN27AABCJ0318A1ZB
  • Managing DirectorsVARUN VINOD ASRANI, SANJAY VINOD ASRANI
  • DirectorsVARUN VINOD ASRANI, SANJAY VINOD ASRANI
  • Other registrations1 more →
  • Declared earlier projects2 →

Key dates

this monthRegisteredAug 2017First promiseDec 2023Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Aug 2017
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2023)
  • Buildings1 building record
  • Documents filed176 files

Current status

84%212 of 252 units booked
84.8%Work done, per cost certificate

Figures as on 29 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SAFAL TRADEMARK TOWER 1,2,3 4 WAMANDEVNA19162520252

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

SAFAL TRADEMARK TOWER 1,2,3 4 WAMANDEV: 81% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)70%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%

Progress on shared amenities15

As on 29 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes20%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes70%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes10%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed323

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots323
Closed/Covered323

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area4,411 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofBANK OF INDIA
Secured amountRs 45.00 crore
Declared on14 Feb 2026

Approvals and building plan

Sanctioning authoritySLUM REHABILITATION AUTHORITY , MUMBAI
Permissible FSI18610.0
Proposed, not sanctioned18,610 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTHE SHELTER 32ND ROADOPP NATIONAL COLLEGE
Estimated costRs 158.00 cr
Cost incurredRs 134.00 cr
Work done84.81%
BuildingWingEstimatedIncurred
SAFAL TRADEMARK TOWER 1,2,3 4 WAMANDEVNARs 147.00 crRs 130.60 cr
-NARs 11.00 crRs 3.40 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDILIP SANGHVI CONSULTANTS
EngineerVIJAY NARANG
Chartered AccountantBANWAT & CO.
Chartered AccountantP.C. DHOLAKIA & CO.
PartnerRole in project
JAI MATA DI HOME CONSTRUCTION PVT LTD-

Extensions applied for5

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800018372Dec 2023 → Aug 2024

Reason as filed by the promoterTHE LOCKDOWNS LED TO CONSTRUCTION ACTIVITIES COMING TO A STANDSTILL DUE TO NON-AVAILABILITY OF LABOUR AND IMPACT ON THE MOVEMENT OF BUILDING MATERIAL. COVID-19 OUT BREAK DELAYED PROJECT COMPLETION TIMELINES, SALES ARE BADLY AFFECTED, EVEN WE ARE UNABLE TO RECOVER FUNDS EXISTING BUYERS AS FINANCIAL CRISIS ARE FACED BY ALMOST EVERYONE DUE TO FUND ISSUE, NOW WE HAVE TAKEN CONSTRUCTION FINANCE, CONSTRUCTION WORK IS IN PROGRESS.

EXT51800024702Dec 2023 → Mar 2025

Reason as filed by the promoterDUE TO FINANCIAL CONSTRAINTS FACED CONSTRUCTION WORK IS NOT COMPLETED THEREFORE REQUIRE EXTENSION UPTO 31ST MARCH 2025.

EXT51800028240Dec 2023 → Dec 2025

Reason as filed by the promoterDUE TO UNRESOLVED FINANCIAL CONSTRAINTS FACED , CONSTRUCTION WORK OF THE BUILDINGS ARE NOT COMPLETED . THEREFORE, WE REQUIRE ADDTIONAL TIME I.E EXTENSION UPTO 31ST DECEMBER 2025 TO COMPLETE THE CONSTRUCTION OF PROJECT. WE ARE COMMITTED TO RESOLVE THE FINANCIAL MATTERS AT THE EARLIEST AND ENSURE TIMELY COMPLETION OF PROJECT.

EA17022619878Dec 2023 → May 2026

Reason as filed by the promoterDue to financial constraints faced by us, the progress of the project was temporarily affected. We wish to inform you that all financial issues have now been resolved, and construction work has recommenced in full swing with adequate resources deployed at site. We assure you that the interests of the allottees / customers are fully secured, and the project shall be completed within the extended period.

EA05082622028Dec 2023 → Dec 2026

Reason as filed by the promoter1. The structural construction of the project is fully completed. However, additional time of approximately7 (Seven Months) months is required to complete the remaining finishing works, Car Parking, testing, common area development, and rectification of minor pending items and statutory inspections, compliance procedures, and obtaining the Occupancy Certificate from the competent authority. Please Grant extension upto 31st December 2026

Complaints filed with MahaRERA30

Case no.ComplainantRespondentFiled
CC12401251Sumeet Ramnath NayakJAI MATA DI HOME CONSTRUCTION PVT LTD27/12/2024
CC12501118MANISH SINGHVIJAI MATA DI HOME CONSTRUCTION PVT LTD03/04/2025
CC12501604PRITHIPAL SINGH BHAMBRAJAI MATA DI HOME CONSTRUCTION PVT LTD15/05/2025
CC12501639HARLEEN PASRICHAJAI MATA DI HOME CONSTRUCTION PVT LTD21/05/2025
CC12501640MANINDER PASRICHAJAI MATA DI HOME CONSTRUCTION PVT LTD21/05/2025
CC12502045Sonal SharmaJAI MATA DI HOME CONSTRUCTION PVT LTD23/06/2025
CC12502586Rakesh Prakash BhatJAI MATA DI HOME CONSTRUCTION PVT LTD27/07/2025
CC12502587Sharad Nagesh ShenoyJAI MATA DI HOME CONSTRUCTION PVT LTD27/07/2025
CC12502589Shankar JagtapJAI MATA DI HOME CONSTRUCTION PVT LTD27/07/2025
CC12502509Deep MukherjeeJAI MATA DI HOME CONSTRUCTION PVT LTD21/07/2025
CC12502625Rajesh BhatiaJAI MATA DI HOME CONSTRUCTION PVT LTD30/07/2025
CC12502591Rahul Rajanikant PathakJAI MATA DI HOME CONSTRUCTION PVT LTD27/07/2025
CC12502593Deepak Prakash GurnaneJAI MATA DI HOME CONSTRUCTION PVT LTD28/07/2025
CC12502603Sonali MelmaneJAI MATA DI HOME CONSTRUCTION PVT LTD28/07/2025
CC12502626Amit ChandaJAI MATA DI HOME CONSTRUCTION PVT LTD30/07/2025
CC12502607Ronak JohariJAI MATA DI HOME CONSTRUCTION PVT LTD28/07/2025
CC12502627Offshore Infrastructures LimitedJAI MATA DI HOME CONSTRUCTION PVT LTD30/07/2025
CC12502592Amit Gulshan TalwarJAI MATA DI HOME CONSTRUCTION PVT LTD27/07/2025
CC12502594Sethu naga muthu Rakkumuthu ThangaveluJAI MATA DI HOME CONSTRUCTION PVT LTD28/07/2025
CC12503369Neha ChendvankarJAI MATA DI HOME CONSTRUCTION PVT LTD21/09/2025
CC12503409Unita Agatha DmelloJAI MATA DI HOME CONSTRUCTION PVT LTD23/09/2025
CC12503517Rajesh Chander JagasiaJAI MATA DI HOME CONSTRUCTION PVT LTD02/10/2025
CC12503559Jagan RamaswamyJAI MATA DI HOME CONSTRUCTION PVT LTD07/10/2025
CC12503523Umesh Ravindra GuptaJAI MATA DI HOME CONSTRUCTION PVT LTD03/10/2025
CC12503524Shailendra Surendra GuptaJAI MATA DI HOME CONSTRUCTION PVT LTD03/10/2025
CC12503849Bina Vijay PatelJAI MATA DI HOME CONSTRUCTION PVT LTD02/11/2025
CC12503848Vijay Ambalal PatelJAI MATA DI HOME CONSTRUCTION PVT LTD02/11/2025
CC12600574Arvind SetiaJAI MATA DI HOME CONSTRUCTION PVT LTD02/02/2026
CC12601626Mona Ajay KakarJAI MATA DI HOME CONSTRUCTION PVT LTD23/03/2026
CC12601245Sunil Kumar SinghJAI MATA DI HOME CONSTRUCTION PVT LTD07/03/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 May 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Feb 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed176

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 176 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Building plan approvalFile: TRADEMARK PLAN NO 1.pdf29 Jul 2026
Building plan approvalFile: trademark plan no 2.pdf29 Jul 2026
Building plan approvalFile: trademark plan no 3.pdf29 Jul 2026
Building plan approvalFile: trademark plan no 4.pdf29 Jul 2026
Building plan approvalFile: trademark plan no 5.pdf29 Jul 2026
Building plan approvalFile: trademark plan no 6.pdf29 Jul 2026
Building plan approvalFile: trademark plan no 7.pdf29 Jul 2026
Building plan approvalFile: trademark plan no 8.pdf29 Jul 2026
Building plan approvalFile: trademark plan no 9.pdf29 Jul 2026
Building plan approvalFile: trademark plan no 10.pdf29 Jul 2026
Building plan approvalFile: trademark plan no 11.pdf29 Jul 2026
Building plan approvalFile: trademark plan no 12.pdf29 Jul 2026
Building plan approvalFile: trademark plan no 13.pdf29 Jul 2026
Building plan approvalFile: trademark plan no 14.pdf29 Jul 2026
Building plan approvalFile: rehab sale.pdf29 Jul 2026
Withdrawal Update Form 1File: FORM 1 SAFAL STRADEMARK APR TO JUNE 2026.pdf24 Jul 2026
Withdrawal Update Form 2File: Form 2 SAFAL TRADEMARK APR TO JUNE 2026.pdf24 Jul 2026
Withdrawal Update Form 3File: FORM 3 SAFAL TRADEMARK APR TO JUNE 2026.pdf24 Jul 2026
Withdrawal Update Form 1File: Form 1 MAR 2026 SAFAL TRADEMARK.pdf27 May 2026
Withdrawal Update Form 1File: Form 1 MAR 2026 SAFAL TRADEMARK.pdf27 May 2026
Withdrawal Update Form 2File: Form 2 TRADEAMRK MAR 2026.pdf27 May 2026
Withdrawal Update Form 2File: Form 2 TRADEAMRK MAR 2026.pdf27 May 2026
Withdrawal Update Form 3File: FORM 3 SAFAL TRADEMARK mar26.pdf27 May 2026
Withdrawal Update Form 3File: FORM 3 SAFAL TRADEMARK mar26.pdf27 May 2026
Form 2A (FY 2025-2026)File: Safal Treadmark Form 2A.pdf27 May 2026
Layout approvalFile: Layout with highlights.pdf2 May 2026
Building plan approvalFile: PLAN with highlights.pdf2 May 2026
Building plan approvalFile: Rehab Sale.pdf2 May 2026
Commencement certificateFile: SAFAL TRADEMARK Full CC.pdf16 Feb 2026
Withdrawal Update Form 1File: SAFAL TRADEMARK FORM 1 JUNE 2025.pdf16 Feb 2026
Withdrawal Update Form 1File: TM FORM 1 SEPT 2025.pdf16 Feb 2026
Withdrawal Update Form 1File: TM FORM 1 DEC 2025.pdf16 Feb 2026
Withdrawal Update Form 2File: Safal Traedmark Form 2 JUNE 2025.pdf16 Feb 2026
Withdrawal Update Form 2File: SAFAL TRADEMARK FORM 2 SEPT 2025.pdf16 Feb 2026
Withdrawal Update Form 2File: TM FORM 2 DEC 2025.pdf16 Feb 2026
Withdrawal Update Form 3File: SAFAL TRADEMARK FORM 3 JUNE 2025.pdf16 Feb 2026
Withdrawal Update Form 3File: SAFAL TRADEMARK FROM 3 SEPT 2025.pdf16 Feb 2026
Withdrawal Update Form 3File: SAFAL TRADEMARK FROM 3 DEC 2025.pdf16 Feb 2026
Declaration in FORM BFile: TM FORM B.pdf19 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Safal Treadmark Form 1.pdf17 Apr 2025
Certificates of CA (Form 3)File: FORM 3 TM MAR 2025.pdf17 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Safal Treadmark Form 2.pdf17 Apr 2025
Disclosure of sold/ booked inventoryFile: MARCH TM INVENTORY.pdf17 Apr 2025
Disclosure of sold/ booked inventoryFile: inventory december 2024.pdf17 Apr 2025
Disclosure of sold/ booked inventoryFile: MARCH TM INVENTORY.pdf17 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Safal Treadmark Form 2A.pdf17 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 TM MAR 2025.pdf17 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 tm dec 2024.pdf28 Jan 2025
Certificates of CA (Form 3)File: TM FORM 3 DEC 2024.pdf28 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 tm dec 2024.pdf28 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 TM SEPT 2024.pdf9 Jan 2025
Certificates of CA (Form 3)File: FORM 3 TM SEPT 2024.pdf9 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: TM FORM 2 SEPT 2024.pdf9 Jan 2025
Building plan approvalFile: Amended Letter.pdf17 Oct 2024
Building plan approvalFile: S1.pdf17 Oct 2024
Building plan approvalFile: S3.pdf17 Oct 2024
Building plan approvalFile: S6.pdf17 Oct 2024
Building plan approvalFile: S2.pdf17 Oct 2024
Building plan approvalFile: S10.pdf17 Oct 2024
Building plan approvalFile: Built-up Area.pdf17 Oct 2024
Building plan approvalFile: Proforma.pdf17 Oct 2024
Building Plan Approval (IOD)File: Proforma.pdf17 Oct 2024
Building Plan Approval (IOD)File: Built-up Area.pdf17 Oct 2024
Building Plan Approval (IOD)File: S10.pdf17 Oct 2024
Building Plan Approval (IOD)File: S2.pdf17 Oct 2024
Building Plan Approval (IOD)File: S6.pdf17 Oct 2024
Building Plan Approval (IOD)File: S3.pdf17 Oct 2024
Building Plan Approval (IOD)File: Amended Letter.pdf17 Oct 2024
Building Plan Approval (IOD)File: S1.pdf17 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: TM Form 2A WITH SIGN.pdf17 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: TM FORM 5 WITH SIGN.pdf17 Oct 2024
Building plan approvalFile: Amended Letter (1).pdf14 Oct 2024
Building plan approvalFile: Typical Floor Diagram.pdf14 Oct 2024
Building plan approvalFile: Amended Letter.pdf14 Oct 2024
Copy of Layout Approval (in case of layout)File: Layout.pdf14 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: SAFAL TRADEMARK Full CC.pdf14 Oct 2024
Building Plan Approval (IOD)File: R6.pdf14 Oct 2024
Building Plan Approval (IOD)File: R1.pdf14 Oct 2024
Building Plan Approval (IOD)File: Amended Letter.pdf14 Oct 2024
Building Plan Approval (IOD)File: Typical Floor Diagram.pdf14 Oct 2024

How this compares with Mumbai Suburban

84%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 36 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAFAL TRADEMARK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHEMBUR6,700+ in Mumbai Suburban

2 kmSAFAL TRADEMARKCompleted 144Lapsed / revoked 103Other 148Dot size: filed unitsN

Filed coordinates, straight-line distance. 395 registered projects within 2 km.

Builder: JAI MATA DI HOME CONSTRUCTION PVT LTD

JAI MATA DI HOME CONSTRUCTION PVT LTD has 2 registrations on MahaRERA, including SAFAL TRADEMARK and SAFAL MONTBAY. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SAFAL TRADEMARK is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAFAL TRADEMARK?

The registered promoter entity is JAI MATA DI HOME CONSTRUCTION PVT LTD, a company as per the filing. Its GSTIN 27AABCJ0318A1ZB can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAFAL TRADEMARK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SAFAL TRADEMARK?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SAFAL TRADEMARK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAFAL TRADEMARK?

The professionals named in the filing: Architect: DILIP SANGHVI CONSULTANTS; Engineer: VIJAY NARANG; Chartered Accountant: BANWAT & CO.; Chartered Accountant: P.C. DHOLAKIA & CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAFAL TRADEMARK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAFAL TRADEMARK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAFAL TRADEMARK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.