ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / SABARI MIRA

Registered No litigation declared Residential / Group Housing project

SABARI MIRA

By SABARI URBAN DEVELOPERS LLP

RG-MH-17644 · RERA P51800055844 · Last updated on MahaRERA portal: 14 Aug 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 91 documents Report an error

SABARI MIRA is a Residential / Group Housing project by SABARI URBAN DEVELOPERS LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800055844 on 23 Apr 2024. Possession is promised by 31 Dec 2026.

At a glance

Project

  • NameSABARI MIRA
  • TypeResidential / Group Housing
  • Location
    • 21ST ROAD
    • CHEMBUR
    • Kurla
    • Mumbai Suburban
    • 400071
  • Pincode400071
  • RERA no.P51800055844
  • ReraGenie IDRG-MH-17644

Builder

  • NameSABARI URBAN DEVELOPERS LLP
  • Entity typeOthers
  • Named personsMIHIR BHARANI, JEET BHARANI

Key dates

this monthRegisteredApr 2024PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Apr 2024
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed91 files

Current status

42.8%Work done, per cost certificate

Figures as on 14 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SABARI MIRANA110000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 14 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

SABARI MIRA: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 14 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes70%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed48

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots48
Closed/Covered48

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,251 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
MIRA CHEMBUR CO-OPERATIVE HOUSING SOCIETYChemburMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI3716.66
Proposed, not sanctioned2,793 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR UNIT NO 11 THE PARK CITY LODHA SENAPATI BAPAT MARG LOWER PAREL WEST MUMBAI 400013
Estimated costRs 20.50 cr
Cost incurredRs 8.76 cr
Work done42.75%
BuildingWingEstimatedIncurred
SABARI MIRANARs 19.50 crRs 8.51 cr
-NARs 1.00 crRs 25.00 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDEOLE BROS
Engineerchhaganlalp chheda
Chartered Accountantmanish modi and associates
Chartered AccountantPriyadarshini & Co
Chartered AccountantKapure & Kapure
PartnerRole in project
SABARI URBAN DEVELOPERS LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Dec 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Dec 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed91

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 91 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2024-2025)File: Form 2A 24-25.pdf14 Aug 2026
Form 2A (FY 2025-2026)File: Form 2A 25-26.pdf14 Aug 2026
Withdrawal Update Form 1File: Form 1- Mar 26.pdf3 Aug 2026
Withdrawal Update Form 2File: Form 2 Mar 26.pdf3 Aug 2026
Withdrawal Update Form 3File: Signed Form 3 Mar 26.pdf3 Aug 2026
Withdrawal Update Form 1File: Form 1 June 25.pdf23 Jun 2026
Withdrawal Update Form 1File: Form 1.pdf23 Jun 2026
Withdrawal Update Form 1File: Form 1 DEC 25.pdf23 Jun 2026
Withdrawal Update Form 1File: Form 1- Mar 26.pdf23 Jun 2026
Withdrawal Update Form 2File: Form 2 June 25.pdf23 Jun 2026
Withdrawal Update Form 2File: Form 2.pdf23 Jun 2026
Withdrawal Update Form 2File: Form 2 Dec 25.pdf23 Jun 2026
Withdrawal Update Form 2File: Form 2 Mar 26.pdf23 Jun 2026
Withdrawal Update Form 3File: Form 3 June 25.pdf23 Jun 2026
Withdrawal Update Form 3File: Form 3.pdf23 Jun 2026
Withdrawal Update Form 3File: Signed Form 3 Dec 25.pdf23 Jun 2026
Withdrawal Update Form 3File: Signed Form 3 Mar 26.pdf23 Jun 2026
Withdrawal Update Form 1File: Form 1.pdf1 Aug 2025
Withdrawal Update Form 2File: Form 2.pdf1 Aug 2025
Withdrawal Update Form 3File: Form 3.pdf1 Aug 2025
Withdrawal Update Form 1File: Form 1.pdf9 Jun 2025
Withdrawal Update Form 2File: Form 2.pdf9 Jun 2025
Withdrawal Update Form 3File: Form 3_11zon.pdf9 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf18 Jan 2025
Layout approvalFile: Amend letter.pdf5 Dec 2024
Building plan approvalFile: Approval Plan1.pdf5 Dec 2024
Building plan approvalFile: Approval Plan 2.pdf5 Dec 2024
Building plan approvalFile: Approval Plan 3.pdf5 Dec 2024
Building plan approvalFile: Approval Plan 4.pdf5 Dec 2024
Building plan approvalFile: Approval Plan 5.pdf5 Dec 2024
Building plan approvalFile: Approval Plan 6.pdf5 Dec 2024
Copy of Layout Approval (in case of layout)File: Amend letter.pdf5 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf5 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf5 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf5 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: further CC 10 floors.pdf5 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Approval Plan1.pdf5 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Approval Plan 2.pdf5 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Approval Plan 3.pdf5 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Approval Plan 4.pdf5 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Approval Plan 5.pdf5 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Approval Plan 6.pdf5 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf3 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf3 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf3 Aug 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold and Booked inventory.pdf3 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf3 Aug 2024
Declaration about Commencement CertificateFile: Declaration about CC.pdf16 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sabari Mira 16-3-2024.pdf16 Mar 2024
Other - LegalFile: sabari urban llp partnership deed final.pdf11 Mar 2024
Building plan approvalFile: IOD ISSUE Drawing 1.pdf19 Feb 2024
Building plan approvalFile: IOD ISSUE Drawing 2.pdf19 Feb 2024
Building plan approvalFile: IOD ISSUE Drawing 3.pdf19 Feb 2024
Building plan approvalFile: IOD ISSUE Drawing 4.pdf19 Feb 2024
Building plan approvalFile: IOD ISSUE Drawing 5.pdf19 Feb 2024
Building plan approvalFile: IOD ISSUE Drawing_6-end (1).pdf19 Feb 2024
Details of encumbrances concerned to FinanceFile: Declaration of no financial encumbrance.pdf19 Feb 2024
Details of encumbrances concerned to LegalFile: Declaration of no financial encumbrance.pdf19 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: IOD ISSUE Drawing 1.pdf19 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: IOD ISSUE Drawing 2.pdf19 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: IOD ISSUE Drawing 3.pdf19 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: IOD ISSUE Drawing 4.pdf19 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: IOD ISSUE Drawing 5.pdf19 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: IOD ISSUE Drawing_6-end (1).pdf19 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form1 with developer signature.pdf19 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations Jeet Bharani.pdf19 Feb 2024
Other - LegalFile: annexure A Declaration cum undertaking.pdf19 Feb 2024
Other - TechnicalFile: annexure A Declaration cum undertaking.pdf19 Feb 2024
Layout approvalFile: IOD CONDITIONS LETTER 25092023.pdf17 Feb 2024
Copy of Layout Approval (in case of layout)File: IOD CONDITIONS LETTER 25092023.pdf17 Feb 2024
CERSAI detailsFile: CERSAI_Search_Report_200296824144_For_Asset_Based_Search_14_02_2024_15_25_56_094.pdf14 Feb 2024
Copy of the legal title reportFile: Title Certificate - Mira.pdf12 Feb 2024
Proforma of Allotment letterFile: Allotment Letter Draft.pdf12 Feb 2024
Proforma of Allotment letterFile: Deviation Report with respect to Allotment letter.pdf12 Feb 2024
Proforma of Agreement for saleFile: Mira rera free sale agreement with deviation marked in yellow.pdf12 Feb 2024
Proforma of Agreement for saleFile: Deviation Letter model agreement.pdf12 Feb 2024
Deviation Report with respect to Allotment letterFile: Deviation Report with respect to Allotment letter.pdf12 Feb 2024
Deviation Report with respect to Allotment letterFile: Allotment Letter Draft.pdf12 Feb 2024

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SABARI MIRA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHEMBUR6,700+ in Mumbai Suburban

Builder: SABARI URBAN DEVELOPERS LLP

SABARI URBAN DEVELOPERS LLP has 1 registration on MahaRERA, including SABARI MIRA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SABARI MIRA is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SABARI MIRA?

The registered promoter entity is SABARI URBAN DEVELOPERS LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SABARI MIRA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SABARI MIRA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SABARI MIRA?

The professionals named in the filing: Architect: DEOLE BROS; Engineer: chhaganlalp chheda; Chartered Accountant: manish modi and associates; Chartered Accountant: Priyadarshini & Co; Chartered Accountant: Kapure & Kapure. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SABARI MIRA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SABARI MIRA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SABARI MIRA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.