Home / Browse projects / Nashik, Maharashtra / SAARTHAK GARIMA
SAARTHAK GARIMA
RG-MH-76726 · RERA P51600018278 · Last updated on MahaRERA portal: 30 Jan 2023
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SAARTHAK GARIMA is a Others project by Saarthak Constructions in Nashik, Maharashtra, registered with MahaRERA as P51600018278 on 22 Oct 2018. The registration is recorded completed; possession was promised by 30 Mar 2024.
At a glance
Project
- NameSAARTHAK GARIMA
- TypeOthers
- Location
- KAMATWADA AMBAD LINK RAOD
- DGP NAGAR NO 2
- Nashik (M Corp.)
- Nashik
- 422010
- Pincode422010
- RERA no.P51600018278
- ReraGenie IDRG-MH-76726
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on22 Oct 2018
- Promised completion30 Mar 2024
- Revised completionNone
- Buildings2 building records
- Documents filed56 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING A AND B | NA | 14 | 0 | 0 | 0 | 0 |
| WING C | NA | 2 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 30 Jan 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 96%.
WING A AND B81%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 96% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 75% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 70% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50% |
WING C0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities18
As on 30 Jan 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 50% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
| LIFT WITH POWER BACKUP | Yes | 50% |
| INTERCOM | Yes | 50% |
| CCTV | Yes | 50% |
Parking filed103
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| WING A AND B | 41 | 57 | 98 |
| WING C | 0 | 5 | 5 |
Land and ownership2
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| BAGLAN DEVELOPERS PVT LTD | Aanandwali | Nashik |
| DADASAHEB RAOSAHEB DHAVANE | Loni Bk. | Ahmednagar |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SUMIT MOHANLAL KUMATH |
| Engineer | YOGIN ARVIND KULKARNI |
| Partner | Role in project |
|---|---|
| Saarthak Constructions | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 18 Oct 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 18 Oct 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 23 Aug 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 23 Aug 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 6 Jul 2022
Documents filed56
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: RERA Audit Report Fy21-22.pdf | 30 Jan 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Sale Deed-1-10 (1).pdf | 6 Sep 2022 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Sale Deed-11-20 (1).pdf | 6 Sep 2022 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Sale Deed-21-30.pdf | 6 Sep 2022 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Sale Deed-31-40.pdf | 6 Sep 2022 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Sale Deed-41-50.pdf | 6 Sep 2022 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Sale Deed-51-60.pdf | 6 Sep 2022 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Sale Deed-61-70.pdf | 6 Sep 2022 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Sale Deed-71-80.pdf | 6 Sep 2022 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Sale Deed-81-90.pdf | 6 Sep 2022 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Sale Deed-91-100.pdf | 6 Sep 2022 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Sale Deed-101-110.pdf | 6 Sep 2022 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Sale Deed-111-120.pdf | 6 Sep 2022 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Sale Deed-121-130.pdf | 6 Sep 2022 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Sale Deed-131-137.pdf | 6 Sep 2022 |
| Status of ConveyanceFile: Sale Deed 2-5.pdf | 6 Sep 2022 |
| Status of ConveyanceFile: Sale Deed 3-3.pdf | 6 Sep 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Garima Completion Cert Wing A and C.pdf | 6 Jul 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy certifictae Garima B Wing_compressed.pdf | 6 Jul 2022 |
| Architect’s Certificate on Completion of Project (Form 4)File: Ar Certificate Form 4 Garima Wing A and C.pdf | 6 Jul 2022 |
| Certificates of CA (Form 3)File: Saarthak CA Cert signed.pdf | 20 May 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Saarthak rera Audit signed.pdf | 20 May 2022 |
| Certificates of CA (Form 3)File: SARTHAK GARIMA CA Certificate_16_03_2021.pdf | 27 Apr 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: RERA Audit Report_2019-20.pdf | 10 Mar 2021 |
| OtherFile: OC.pdf | 21 Jan 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Saarthak Constructions RERA Audit 18-19.pdf | 16 Nov 2019 |
| Declaration in FORM BFile: Form B.pdf | 24 Aug 2019 |
| OtherFile: HDFC CF Sanctioned Letter.pdf | 24 Aug 2019 |
| Building plan approvalFile: SANTIONED PLAN GARIMA-1.pdf | 23 Aug 2019 |
| Building plan approvalFile: SANTIONED PLAN GARIMA-2.pdf | 23 Aug 2019 |
| Building plan approvalFile: SANTIONED PLAN GARIMA-3.pdf | 23 Aug 2019 |
| Building plan approvalFile: SANTIONED PLAN GARIMA-4.pdf | 23 Aug 2019 |
| Building Plan Approval (IOD)File: SANTIONED PLAN GARIMA-1.pdf | 23 Aug 2019 |
| Building Plan Approval (IOD)File: SANTIONED PLAN GARIMA-2.pdf | 23 Aug 2019 |
| Building Plan Approval (IOD)File: SANTIONED PLAN GARIMA-3.pdf | 23 Aug 2019 |
| Building Plan Approval (IOD)File: SANTIONED PLAN GARIMA-4.pdf | 23 Aug 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 23 Aug 2019 |
| Proforma of Allotment letterFile: Agreement Draft-Revised.pdf | 22 Aug 2019 |
| Proforma of Allotment letterFile: Rera Agreement for sale.pdf | 26 Oct 2018 |
| Building plan approvalFile: Approved Building Plan-.pdf | 18 Oct 2018 |
| Layout approvalFile: lAYOUT.pdf | 18 Oct 2018 |
| PAN CardFile: Pan Card.pdf | 18 Oct 2018 |
| Copy of the legal title reportFile: Title Report-New (1).pdf | 18 Oct 2018 |
| Details of encumbrancesFile: Encumbrance Certificate.pdf | 18 Oct 2018 |
| Copy of Layout Approval (in case of layout)File: lAYOUT.pdf | 18 Oct 2018 |
| Building Plan Approval (IOD)File: Approved Building Plan-.pdf | 18 Oct 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate-New.pdf | 18 Oct 2018 |
| Declaration in FORM BFile: Form B Promoters-New.pdf | 18 Oct 2018 |
| Declaration in FORM BFile: Form B Co Promoters-New.pdf | 18 Oct 2018 |
| Certificates of CA (Form 3)File: CA CERTIFICATE.pdf | 18 Oct 2018 |
| Proforma of Allotment letterFile: Final Agreement draft (Rera).pdf | 18 Oct 2018 |
| Proforma of Allotment letterFile: Allotment Letter (Rera).pdf | 18 Oct 2018 |
| OtherFile: PROPOSED ELEVATION.pdf | 18 Oct 2018 |
| OtherFile: PROPOSED FLOOR PLAN 1 TO 7 AND 9TH TO 10 floor.pdf | 18 Oct 2018 |
| OtherFile: Proposed Floor Plan 8th Floor.pdf | 18 Oct 2018 |
| OtherFile: WING-C FLOOR PLAN.pdf | 18 Oct 2018 |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Saarthak Leher | Plot No 4 Kamatwade Ambad Link Road Opp DGP Nagar Ambad Nashik | 20 | Completed | Nov 2017 | Nov 2017 |
| Saarthak Elina | Plot no 31 Chetna Nagar Nashik | 11 | Completed | Jun 2017 | Late, Feb 2018 |
| Saarthak Euphoria | Plot No 1 Serene Meadows Gangapur Road Ananwalli Nashik | 7 | Completed | Oct 2013 | Late, Feb 2014 |
| Saarthak Srishti | Opp DGP Nagar Kamatwade Ambad link Road Ambad Shiwar1 Nashik | 24 | Completed | Aug 2012 | Aug 2012 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 2 other registrations, which the RERA portal never shows together
- All 56 filed documents as one ZIP, foldered, with a manifest
Keep SAARTHAK GARIMA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near DGP NAGAR NO 24,100+ in Nashik
SHREE SATYANARAYAN ROONGTA FORUM
ROONGTA HOMES LLP
LIFE 360
VELOCITY INFRA PROJECTS
ARYAN'S LIFEONE
SHREE ARYAN BUILDERS AND DEVELOPERS
SUNFLOWER CITY
DEEPAK KALYANJI CHANDE
Laxminarayan Heaven
Sahajanand Builders And Developers
SWASTIK MANGAL APARTMENT
SHREEMANGAL CONSTRUCTION
See every Nashik project, with the district possession charts
Builder: Saarthak Constructions
Saarthak Constructions has 3 registrations on MahaRERA, including SAARTHAK GARIMA and Saarthak Athena. Its filings disclose 6 earlier MahaRERA projects: declares 4 of 6 past projects completed on time. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if SAARTHAK GARIMA is delayed beyond 30 Mar 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SAARTHAK GARIMA?
The registered promoter entity is Saarthak Constructions, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SAARTHAK GARIMA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SAARTHAK GARIMA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SAARTHAK GARIMA?
The professionals named in the filing: Architect: SUMIT MOHANLAL KUMATH; Engineer: YOGIN ARVIND KULKARNI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SAARTHAK GARIMA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback