Saarrthi Supremus
RG-MH-16797 · RERA P52100027384 · Last updated on MahaRERA portal: 10 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 63 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Saarrthi Supremus is a Commercial project by Siddharth Properties in Pune, Maharashtra, registered with MahaRERA as P52100027384 on 8 Dec 2020. Possession is promised by 31 Dec 2027. The completion date has moved by 63 months from the original filing. 3 of the 5 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.
At a glance
Project
- NameSaarrthi Supremus
- TypeCommercial
- Location
- Bavdhan Khurd
- Mulshi
- Pune
- 411021
- Pincode411021
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100027384
- ReraGenie IDRG-MH-16797
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on8 Dec 2020
- Promised completion31 Dec 2027
- Revised completionRevised to 31 Dec 2027 (originally 30 Sep 2022)
- Buildings1 building record
- Documents filed100 files
Current status
Figures as on 10 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Saarrthi Supremus | NA | 2 | 2 | 0 | 5 | 5 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 10 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.
Saarrthi Supremus: 0% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 10 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed5
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Saarrthi Supremus | NA | Rs 1.25 cr | - |
| - | NA | Rs 25.00 lakh | - |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Vilas Yele ideas and images |
| Engineer | Jitendra Jadhav |
| Engineer | RAVIRAJ KARANDE |
| Chartered Accountant | Saransh Dey |
| Chartered Accountant | Rohan Nahar |
| Chartered Accountant | H N V & CO |
| Chartered Accountant | NITESH M SHAH & CO |
| Partner | Role in project |
|---|---|
| Siddharth Properties | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to heavy rainfall waterlogged on road resulting into stoppage of supply of materials, process of external plastering was also suspended. Further due to situations beyond control of the Promoter it is not possible for us to deliver possession on declared date.
Reason as filed by the promoterDue to revision in plans we were not able to complete the project in time.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 11 Nov 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 4 Dec 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 4 Dec 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 11 Nov 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed100
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 100 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1.pdf | 10 Jul 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 10 Jul 2026 |
| Withdrawal Update Form 3File: FORM 3.pdf | 10 Jul 2026 |
| Withdrawal Update Form 1File: FORM 1.pdf | 16 Feb 2026 |
| Withdrawal Update Form 2File: Dec 25 Saarrthi Supremes Engg Cert.pdf | 16 Feb 2026 |
| Withdrawal Update Form 3File: Form No 3 Saarrthi Supremus Dec 25.pdf | 16 Feb 2026 |
| Withdrawal Update Form 1File: Sept 25_Saarrthi Supremus Architect Cert.pdf | 8 Dec 2025 |
| Withdrawal Update Form 2File: Engineers Certificate - 30-09-2025 - Saarrthi Supremes.pdf | 8 Dec 2025 |
| Withdrawal Update Form 3File: Form 3 - Supremus - Sept 2025.pdf | 8 Dec 2025 |
| Form 5 (FY 2024-2025)File: Form 5 - FY 24-25 - Supremus.pdf | 29 Nov 2025 |
| Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf | 29 Jul 2025 |
| Form 2File: FORM 2 ENGINEER CERTIFICATE.pdf | 29 Jul 2025 |
| Form 3File: FORM 3 CA CERTIFICATE.pdf | 29 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY.pdf | 29 Jul 2025 |
| Form 1File: Mar 25_Saarrthi Supremus Architect Cert.pdf | 12 Jun 2025 |
| Form 2File: Mar 25 Saarrthi Supremes Engg Cert.pdf | 12 Jun 2025 |
| Form 3File: Form III - Supremus - March 2025.pdf | 12 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Supremes_Mar 25 Sold Unsold Inventory Certificate.pdf | 12 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mar 25_Saarrthi Supremus Architect Cert.pdf | 19 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form III - Supremus - March 2025.pdf | 19 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Supremes_Mar 25 Sold Unsold Inventory Certificate.pdf | 19 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Dec 24 Saarrthi Supremes Engg Cert.pdf | 29 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 03 Saarrthi Supremus.pdf | 24 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dec 24 Saarrthi Supremus Architect Cert.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Supremes Dec 24 Sold Unsold Inventory Certificate.pdf | 20 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 CA Certificate - Saarrthi Supremus - Dec.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Saarrthi Supremes .pdf | 23 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sept 24 Saarrthi Supremes Engg Cert.pdf | 23 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sept 24 saarrthi Supremus Architect Cert.pdf | 19 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Sept 24 Supremes Sold Unsold Inventory Certificate.pdf | 19 Oct 2024 |
| Declaration in FORM BFile: 03 Form B - Affidavit cum Declaration - Saarrthi Supremus - 13082024.pdf | 13 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Mar 23 Supremes_Sold Unsold Inventory Certificate.pdf | 13 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: June 23 Supremes_Sold Unsold Inventory Certificate.pdf | 13 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: September 23 Supremes_Sold Unsold Inventory Certificate.pdf | 13 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: December 23 Supremes_Sold Unsold Inventory Certificate.pdf | 13 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: June 24 Supremes_Sold Unsold Inventory Certificate.pdf | 13 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 2022.pdf | 13 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 2023.pdf | 13 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 2024.pdf | 13 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Saarrthi Supremus Form 1 - June 24 Arch.pdf | 30 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Saarrthi Supremes Form 2 - June 24 Eng.pdf | 29 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Saarrthi Supremus Form 3 - June 24.pdf | 29 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Mar 24 Saarrthi Supremes_Q cert (1).pdf | 4 May 2024 |
| Disclosure of sold/ booked inventoryFile: Mar 24 Supremes_Sold Unsold Inventory Certificate.pdf | 4 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mar 24_Saarrthi Supremus Architect Cert.pdf | 29 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mar 24 Saarrthi Supremes Engg Cert.pdf | 29 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Cretificate - Saarrthi Supremus.pdf | 29 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 20240308130800.pdf | 8 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dec 23_Saarrthi Supremus.pdf | 2 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Dec 23 Supremus registration_E cert.pdf | 2 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Saarrthi Suprenus_compressed.pdf | 20 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1_Jun 23_Saarrthi Supremus.pdf | 19 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2_Supremus_compressed.pdf | 19 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2_M23_Supremus.pdf | 18 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_March23_Saarrthi Supremus.pdf | 15 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 03 Saarrthi Supermus.pdf | 15 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form No2 Supermus_Dec22.pdf | 11 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dec 22_Saarrthi Supremus.pdf | 7 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3_Supremes_Sept22_c.pdf | 7 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form No3 Supermus_Dec22.pdf | 7 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: Supremus_June22.pdf | 23 Nov 2022 |
| Disclosure of sold/ booked inventoryFile: Supremus_Sept22.pdf | 23 Nov 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Mar 22 Saarrthi Supremes_Q cert.pdf | 10 Nov 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form5_March21_Supremus_c.pdf | 10 Nov 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1_Supremes_Sept22_compressed.pdf | 22 Oct 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2_Supremes_Sept22_compressed.pdf | 22 Oct 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Architects Certificate_Sept21_Saarrthi Supremes.pdf | 27 Jul 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificates_Saarrthi Suprems.pdf | 27 Jul 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1_Jun 22_Saarrthi Supremes.pdf | 27 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_SAARRTHI SUPREMUS.pdf | 27 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificates_Saarrthi Supremes.pdf | 27 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2_Jun 22_Saarrthi Supremes_c.pdf | 27 Jul 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Saarrthi Supremes_Q cert.pdf | 27 Jul 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Saarrthi Supremus_Sep'21_c.pdf | 27 Jul 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Saarrthi Supremus.pdf | 27 Jul 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3_Jun 22_Saarrthi Supremes_c.pdf | 27 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Dec 21 Supremes Engg Certificate.pdf | 31 Jan 2022 |
| Declaration about Commencement CertificateFile: Saarrthi Supremus.pdf | 11 Nov 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SAARRTHI SUPREMUS_FORM 2.pdf | 12 Oct 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: SAARRTHI SUPREMUS_FORM 2A.pdf | 12 Oct 2021 |
Promoter's earlier projects5
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Shimmer N Shine | S NO 19 HINGNE KHURD | 147 | Completed | Mar 2020 | Apr 2016 |
| Souvenir | S.NO 15- 6- 1 MAU MAHALUNGE TAL MULSHI PUNE | 246 | Completed | Mar 2016 | Oct 2015 |
| Sovereign | MARUNJI TAL MULSHI PUNE | 259 | Completed | Aug 2015 | Late, Oct 2015 |
| Signor | S NO 273 HINJEWADI TAL MULSHI PUNE | 129 | Completed | Sep 2013 | Sep 2013 |
| Satin Hills | S NO 37 BAVDHAN BK PUNE 411021 | 101 | Completed | Jan 2010 | Late, Jun 2011 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 8 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 100 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Saarrthi Supremus on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bavdhan Khurd13,700+ in Pune
Filed coordinates, straight-line distance. 9 registered projects within 2 km.
NYATI EQUINOX I
MIHIR HOMES ENTERPRISE LLP
Puraniks Abitante Fiore, Phase 2A
Puranik Buildcon Private Limited
Puraniks Abitante Fiore, Phase 2B
Puranik Buildcon Private Limited
cloud 51
OREE REALITY PVT LTD
CIELO BY VTP LUXE
DELAS REALCON LLP
Puraniks Abitante Fiore Phase 2C1
Puranik Buildcon Private Limited
Builder: Siddharth Properties
Siddharth Properties has 9 registrations on MahaRERA, including Saarrthi Skybay and Success Square. Its filings disclose 7 earlier MahaRERA projects: declares 4 of 7 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Saarrthi Supremus is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Saarrthi Supremus?
The registered promoter entity is Siddharth Properties, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Saarrthi Supremus?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Saarrthi Supremus?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Saarrthi Supremus?
The professionals named in the filing: Architect: Vilas Yele ideas and images; Engineer: Jitendra Jadhav; Engineer: RAVIRAJ KARANDE; Chartered Accountant: Saransh Dey; Chartered Accountant: Rohan Nahar; Chartered Accountant: H N V & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Saarrthi Supremus?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback