ReraGenieLog inGet a buyer report

Home / Browse projects / Nashik, Maharashtra / RUSHIRAJ ZENITH APARTMENT

Completed No litigation declared Residential / Group Housing project

RUSHIRAJ ZENITH APARTMENT

By JHALA INFRATECH

RG-MH-66279 · RERA P51600020875 · Last updated on MahaRERA portal: 29 Nov 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 5 completed earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 7 other registrations.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Mar 2024Possession promisedregistration recorded completed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 89%
0Complaints at MahaRERAon this registration
Jump to the 115 documents Report an error

RUSHIRAJ ZENITH APARTMENT is a Residential / Group Housing project by JHALA INFRATECH in Nashik, Maharashtra, registered with MahaRERA as P51600020875 on 15 May 2019. The registration is recorded completed; possession was promised by 30 Mar 2024.

At a glance

Project

  • NameRUSHIRAJ ZENITH APARTMENT
  • TypeResidential / Group Housing
  • Location
    • GANGAPUR ROAD
    • NERSINH NAGAR
    • Nashik (M Corp.)
    • Nashik
    • 422013
  • Pincode422013
  • RERA no.P51600020875
  • ReraGenie IDRG-MH-66279

Builder

  • NameJHALA INFRATECH
  • Entity typePartnership
  • PartnersVIRAJ JAIRAJ JHALA, JAIRAJ MANOHARSINGH JHALA, VIRAJ JAIRAJ JHALA, JAIRAJ MANOHARSINGH JHALA, VIRAJ JAIRAJ JHALA, JAIRAJ MANOHARSINGH JHALA, VIRAJ JAIRAJ JHALA, JAIRAJ MANOHARSINGH JHALA, VIRAJ JAIRAJ JHALA, JAIRAJ MANOHARSINGH JHALA
  • Other registrations7 more →
  • Completed6 of 8
  • Declared earlier projects7 →

Key dates

this monthRegisteredMay 2019PromisedMar 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on15 May 2019
  • Promised completion30 Mar 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed115 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RUSHIRAJ ZENITH APARTMENTNA210000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Nov 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 89%.

RUSHIRAJ ZENITH APARTMENT: 43% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure89%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 29 Nov 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed85

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots85
Closed/Covered30
Open Space55

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,876 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI8999.86
Proposed, not sanctioned9,000 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNEEL KAMAL HOUSE THATTE NAGAR COLLEGE ROAD NASHIK

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKABRE CONSULTANT
EngineerPUNIT DINESHCHANDRA RAI
Chartered AccountantNAMAN D OHARA
Chartered AccountantSANKET S SHAH AND CO
Chartered AccountantAKSHAY PICHA ASSOCIATES
PartnerRole in project
JHALA INFRATECH-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 May 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 May 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Mar 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 11 Mar 2023

Documents filed115

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 115 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Architect Certificate FORM 4 - Zenith - 10 03 23.pdf29 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1.pdf1 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1.pdf1 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form No 2.pdf1 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2.pdf1 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Zenith.pdf1 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Zenith.pdf1 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A.pdf1 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Zenith.pdf1 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Zenith.pdf1 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Zenith.pdf1 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf1 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2A.pdf1 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Punit Rai Certificate - Zenith - 30 June 2022.pdf13 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PUNIT RAI - ZENITH -2Form.pdf13 Oct 2023
Certificates of CA (Form 3)File: Rushiraj Zenith Dec-22.pdf13 Oct 2023
Certificates of CA (Form 3)File: RUSHIRAJ ZENITH APARTMENT FORM 3 UPLOADED.pdf13 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5.pdf30 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Punit Rai Certificate - Zenith - 31 Dec 2021_compressed.pdf15 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Zenith Architect's Certificate Dated 21-Dec-2021.pdf14 Apr 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: 3306-23 AMMENDMENT DECLARATION jhala infratech_1_11zon.pdf15 Mar 2023
Building plan approvalFile: Scan_3681-01_11zon.pdf11 Mar 2023
Building plan approvalFile: Scan_3681-02_11zon.pdf11 Mar 2023
Building plan approvalFile: Scan_3681-03_11zon.pdf11 Mar 2023
Building Plan Approval (IOD)File: Scan_3681-01_11zon.pdf11 Mar 2023
Building Plan Approval (IOD)File: Scan_3681-02_11zon.pdf11 Mar 2023
Building Plan Approval (IOD)File: Scan_3681-03_11zon.pdf11 Mar 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate - Rushiraj Zenith - 10 March 2023.pdf11 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 Architect - Zenith - Sagar Kabre Dt31MAR2022.pdf18 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RUSHIRAJ ZENITH - ARCHITECT CERTIFICATE - 30 JUNE 2021_compressed.pdf18 Jan 2023
Certificates of CA (Form 3)File: Rusiraj Zenith JUNE-22.pdf18 Jan 2023
Certificates of CA (Form 3)File: Rushiraj Zenith Sept-22.pdf18 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: RUSHIRAJ ZENITH FORM 5 FY 2021-22.pdf18 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: RUSHIRAJ ZENITH FORM 5 FY 2021-22.pdf1 Dec 2022
Certificates of CA (Form 3)File: Zenith Dec 2021 Form 3_compressed.pdf2 Jun 2022
Certificates of CA (Form 3)File: Zenith Mar 2022 Form 3_compressed.pdf2 Jun 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: AmendDeclaration Deed_11zon.pdf29 Apr 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: From 5.pdf26 Oct 2021
Certificates of CA (Form 3)File: Form 3 Zeinith Oct.pdf13 Oct 2021
Building plan approvalFile: Plan.pdf12 Oct 2021
Building Plan Approval (IOD)File: Plan.pdf12 Oct 2021
Commencement Certificates / NA Order for plotted developmentFile: Commencemnet Certificate_compressed (1).pdf12 Oct 2021
Declaration about Commencement CertificateFile: Declaration about commencement cert.pdf12 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - Rushiraj Zenith.pdf12 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate.pdf12 Oct 2021
Proforma of Allotment letterFile: Agreement to sale draft.pdf12 Oct 2021
Declaration about Commencement CertificateFile: Declaration CC.pdf14 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 30 June 2020.pdf14 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 30 Sep 2020.pdf14 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 31 Dec 2020.pdf14 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 31 Mar 2021.pdf14 Sep 2021
Disclosure of sold/ booked inventoryFile: Disclosure Of UnsolD inv.pdf14 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Annual Audit Report of Statutory CA (Form 5) (FY 2019-2020).pdf14 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Audit 2021.pdf14 Sep 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RUSHIRAJ ZENITH - ARCHITECT'S CERTIFICATE 31 DEC 2020.pdf30 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ZENIT - PUNIT RAI - 31 DEC 2020_compressed.pdf30 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ZENIT - PUNIT RAI - 31 MAR 2021_compr.pdf30 Aug 2021
Certificates of CA (Form 3)File: CA Certificate Dec Final - Zenith.pdf30 Aug 2021
Certificates of CA (Form 3)File: Form 3 March 21.pdf30 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Zenith 30 Sept 2020 Ar_compressed.pdf4 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Zenith 30 Sept 2020 Ar_compressed.pdf4 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PUNIT RAI ZENITH 30-09-20 Engg_compressed.pdf4 Aug 2021
Certificates of CA (Form 3)File: FORM - 3.pdf4 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Achitect Certificate Zenith 30 June 2020.pdf19 Jan 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PUNIT RAI ZENITH 30-06-20_compressed.pdf19 Jan 2021
Certificates of CA (Form 3)File: zenith form -3 Jun.pdf19 Jan 2021
OtherFile: Index II_compressed Upload Date 05102020.pdf5 Oct 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Zenith Appt FY 2019-20.pdf30 Sep 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Achitects Certificate Zenith.pdf30 Jun 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Punit Rai Zenith 31-March-2020.pdf30 Jun 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A - ZENITH 30-DEC-2019.pdf30 Jun 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 30-JUNE-2019.pdf30 Jun 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A SEPT-2019.pdf30 Jun 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A-MAR-2020.pdf30 Jun 2020
Certificates of CA (Form 3)File: CA CERT DEC ZENITH.pdf30 Jun 2020
Certificates of CA (Form 3)File: ZENITH MAR.pdf30 Jun 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sagar Kabre Arc ( Zenith ) 31-DEC-2019.pdf28 Feb 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Punit Rai Engg ( Zenith ) 31-DEC-2019_compressed.pdf28 Feb 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Cirtificate Zenit 31 Aug- 19.pdf11 Jan 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Cirtificate Zenit 30 Sept- 19 (1).pdf11 Jan 2020

Promoter's earlier projects6

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

5 delivered on promise1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
RUSHIRAJ HIGHLANDS APARTMENTP51600056460Datta Chowk Gangapur Road Nashik, Nashik23Jun 2024OngoingMar 2029Not due yet
RUSHIRAJ SERENITY APARTMENTP51600034166NASHIK, Nashik12Mar 2022CompletedDec 2025Nov 2023
RUSHIRAJ ZODIAC APARTMENTP51600031841NASHIK, Nashik18Nov 2021CompletedDec 2024Nov 2023
RUSHIRAJ RADIANCE APARTMENTP51600031933GANGAPUR ROAD, Nashik12Nov 2021CompletedDec 2024Feb 2024
RUSHIRAJ DIVINE APARTMENTP51600021013NEAR ATHARV LAWNS, Nashik-May 2019CompletedDec 2024Aug 2020
CRESCENT APARTMENTP51600001071Gangapur Road, Nashik-Jul 2017CompletedDec 2019Nov 2018

How this compares with Nashik

10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is completed

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RUSHIRAJ ZENITH APARTMENT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NERSINH NAGAR4,100+ in Nashik

Builder: JHALA INFRATECH

JHALA INFRATECH has 8 registrations on MahaRERA, including CRESCENT APARTMENT and RUSHIRAJ ZENITH APARTMENT. Its filings disclose 7 earlier MahaRERA projects: declares 6 of 6 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if RUSHIRAJ ZENITH APARTMENT is delayed beyond 30 Mar 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RUSHIRAJ ZENITH APARTMENT?

The registered promoter entity is JHALA INFRATECH, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RUSHIRAJ ZENITH APARTMENT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RUSHIRAJ ZENITH APARTMENT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RUSHIRAJ ZENITH APARTMENT?

The professionals named in the filing: Architect: KABRE CONSULTANT; Engineer: PUNIT DINESHCHANDRA RAI; Chartered Accountant: NAMAN D OHARA; Chartered Accountant: SANKET S SHAH AND CO; Chartered Accountant: AKSHAY PICHA ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RUSHIRAJ ZENITH APARTMENT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RUSHIRAJ ZENITH APARTMENT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RUSHIRAJ ZENITH APARTMENT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.