ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / Runwal Gardens Phase 4 Bldg No. 37

Registered No litigation declared Residential / Group Housing project

Runwal Gardens Phase 4 Bldg No. 37

By Runwal Residency Private Limited

RG-MH-55876 · RERA P51700033206 · Last updated on MahaRERA portal: 18 Jul 2026

Source: official MahaRERA filing

Red flags

  • 7 complaints at MahaRERA
  • Completion date moved by 15 months
  • 1 extension taken
  • Rs 790.00 crore secured on the land, in favour of Indusind Bank ltd

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedmoved 15 months from the original
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 92%
43 of 282Units unsoldnot recorded sold or booked
7Complaints at MahaRERAon this registration
Jump to the 172 documents Report an error

Runwal Gardens Phase 4 Bldg No. 37 is a Residential / Group Housing project by Runwal Residency Private Limited in Thane, Maharashtra, registered with MahaRERA as P51700033206 on 9 Feb 2022. Possession is promised by 30 Jun 2027. The completion date has moved by 15 months from the original filing. 239 of the 282 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete. 7 complaints are on record with the regulator.

At a glance

Project

  • NameRunwal Gardens Phase 4 Bldg No. 37
  • TypeResidential / Group Housing
  • Location
    • KALYAN SHILPHATA ROAD
    • Dombivali
    • gharivle
    • Kalyan
    • Thane
    • 421204
  • Pincode421204
  • RERA no.P51700033206
  • ReraGenie IDRG-MH-55876

Builder

  • NameRunwal Residency Private Limited
  • Entity typeCompany
  • CINU45400MH2011PTC212140
  • CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • DirectorsVijay Kisan Patil, Lucy Roychoudhury
  • Other registrations17 more →
  • Completed3 of 18
  • No longer live5 lapsed, de-registered or revoked

Key dates

this monthRegisteredFeb 2022First promiseMar 2026Revised toJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Feb 2022
  • Promised completion30 Jun 2027
  • Revised completionRevised to 30 Jun 2027 (originally 31 Mar 2026)
  • Buildings1 building record
  • Documents filed172 files

Current status

85%239 of 282 units booked
81.3%Work done, per cost certificate

Figures as on 18 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Bldg No 37NA35322820282

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 92%.

Bldg No 37: 56% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth0%
Stilt Floor100%
Slabs of Super Structure92%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%

Progress on shared amenities15

As on 18 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area738 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofIndusind Bank ltd
Secured amountRs 790.00 crore
CERSAI search filedYes
Declared on3 Jul 2025

Approvals and building plan

Sanctioning authorityMMRDA
Permissible FSI23892.27
Proposed, not sanctioned12,817 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 9 and 10 Mary Corner Besides NEXT Showroom Near Sion Circle Sion Mumbai 400022
Estimated costRs 90.87 cr
Cost incurredRs 73.90 cr
Work done81.33%
BuildingWingEstimatedIncurred
Bldg No 37NARs 73.27 crRs 59.99 cr
-NARs 17.59 crRs 13.91 cr

Certifying professionals and partners13

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr Sandeep Prabhu for Sakaar
ArchitectPrecise Architects and consultants
ArchitectSaakar Architects
ArchitectSakar Architects
EngineerChetan Sampat
EngineerSHAILESH MAHIMTURA
EngineerUTTAM KAWATHANKAR
EngineerSAAKAR ARCHITECTS
Chartered AccountantKshirsagar and Associates
Chartered AccountantM.B. AGRAWAL & CO.
Chartered AccountantM B AGARWAL AND CO
Chartered AccountantSINGHI AND CO
PartnerRole in project
Runwal Residency Private Limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA23032620347Mar 2026 → Jun 2027

Reason as filed by the promoterThe project continued to encounter significant post-pandemic challenges, including persistent labour shortages, irregular manpower availability, disruptions in procurement and supply chains, and reduced operational efficiency. Additionally, there were instances of non-performance and negligence on the part of the contractor, which necessitated their termination. The process post termination and completion of all related formalities required considerable time, further impacting the project timeline. Owing to these continuing constraints, the pace of execution was materially affected, resulting

Complaints filed with MahaRERA7

Case no.ComplainantRespondentFiled
CC006000000303684Swapna Sangesh PawarRunwal Gardens19/12/2022
CC12503873Leenesh Satyanarayana VadapallyRunwal Residency Private Limited05/11/2025
CC12600375Runwal Residency Private LimitedRavindra Kailash Gaikar20/01/2026
CC12600540Pravin Dinkar ShirwadkarRunwal Residency Private Limited31/01/2026
CC12600822Runwal Residency Private LimitedVarsha Pankajkumar Chaurasia13/02/2026
CC12601485Runwal Residency Private LimitedSava Ram17/03/2026
CC12601729Maqsood Mehmood ShaikhRunwal Residency Private Limited26/03/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Feb 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Jan 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Feb 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed172

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 172 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 - 37.pdf18 Jul 2026
Withdrawal Update Form 2File: FORM 2 - 37.pdf18 Jul 2026
Withdrawal Update Form 3File: Form 3 Tower 37.pdf18 Jul 2026
Withdrawal Update Form 1File: form 1 - 37.pdf20 Apr 2026
Withdrawal Update Form 2File: ENGINEER CERTIFICATE 37.pdf20 Apr 2026
Withdrawal Update Form 3File: Form 3 Tower 37.pdf20 Apr 2026
Withdrawal Update Form 1File: FORM 1 37- DEC 25.pdf19 Jan 2026
Withdrawal Update Form 2File: form 2 37 dec 25.pdf19 Jan 2026
Withdrawal Update Form 3File: Form 3 Tower 37.pdf19 Jan 2026
Form 1File: Form 1 37.pdf20 Oct 2025
Form 2File: Form 2 37.pdf20 Oct 2025
Form 3File: Form 3 Tower 37.pdf20 Oct 2025
Disclosure of Sold and Booked InventoryFile: 37 inventory.pdf20 Oct 2025
Self-declaration of Quarterly ProgressFile: Declaration for Compliance RRPL final.pdf20 Oct 2025
Form 2A (FY 2024-2025)File: Form 2A 37.pdf20 Oct 2025
Form 5 (FY 2024-2025)File: RRPL T37.pdf20 Oct 2025
Withdrawal Update Form 1File: Form 1 RG phase 4 blg no 37.pdf10 Oct 2025
Withdrawal Update Form 2File: PH4 T37 RERA FORM 2 ENGINEERS CERTIIFICATE 30 06 2025.pdf10 Oct 2025
Withdrawal Update Form 3File: Form 3 Tower 37.pdf10 Oct 2025
Withdrawal Update Form 1File: Form 1 RG phase 4 blg no 37.pdf9 Oct 2025
Withdrawal Update Form 2File: PH4 T37 RERA FORM 2 ENGINEERS CERTIIFICATE 30 06 2025.pdf9 Oct 2025
Withdrawal Update Form 3File: Form 3 Tower 37.pdf9 Oct 2025
Withdrawal Update Form 1File: Form 1 RG phase 4 blg no 37.pdf7 Oct 2025
Withdrawal Update Form 1File: Form 1 RG phase 4 blg no 37.pdf7 Oct 2025
Withdrawal Update Form 1File: Form 1 RG phase 4 blg no 37.pdf7 Oct 2025
Withdrawal Update Form 2File: PH4 T37 RERA FORM 2 ENGINEERS CERTIIFICATE 30 06 2025.pdf7 Oct 2025
Withdrawal Update Form 2File: PH4 T37 RERA FORM 2 ENGINEERS CERTIIFICATE 30 06 2025.pdf7 Oct 2025
Withdrawal Update Form 2File: PH4 T37 RERA FORM 2 ENGINEERS CERTIIFICATE 30 06 2025.pdf7 Oct 2025
Withdrawal Update Form 3File: Form 3 Tower 37.pdf7 Oct 2025
Withdrawal Update Form 3File: Form 3 Tower 37.pdf7 Oct 2025
Withdrawal Update Form 3File: Form 3 Tower 37.pdf7 Oct 2025
Disclosure of sold/ booked inventoryFile: Runwal Gardens Phase 4 Bldg No 37.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Tower 37.pdf2 May 2025
Form 1 37 25 04 2529 Apr 2025
Disclosure of sold/ booked inventoryFile: Runwal Gardens Phase 4 Bldg No 37.pdf23 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PH4 T37 RERA FORM 2 ENGINEERS CERTIIFICATE 31 03 2025.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Tower 37.pdf12 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Done Form 1 37 31st December 2024.pdf3 Feb 2025
Disclosure of sold/ booked inventoryFile: Runwal Gardens Phase 4 Bldg No 37.pdf31 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Done PH4 T37 RERA FORM 2 ENGINEERS CERTIIFICATE.pdf30 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Done Form 1 37 31st December 2024.pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Tower 37 done.pdf21 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A NEW 2024-TW-37.pdf25 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PH4 T37 RERA FORM 2 ENGINEERS CERTIIFICATE 30-09-2024.pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 37.pdf21 Oct 2024
Disclosure of sold/ booked inventoryFile: Runwal Gardens Phase 4 Bldg No 37.pdf21 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RRPL TOWER 37 Form 5 FY 23-24_signed.pdf7 Oct 2024
Disclosure of sold/ booked inventoryFile: Inventory Format - Phase-4D.pdf26 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 37.pdf23 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PH4 T37 FORM 2.pdf18 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Tower 37.pdf18 Jul 2024
Declaration about Commencement CertificateFile: RRPL Revised CC phase 8 dated 14 May 2024_11zon.pdf12 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 37 - March 24.pdf26 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Phase 4 T 37.pdf18 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Tower 37.pdf18 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 37.pdf24 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Tower 37.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Tower 37.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 37.pdf21 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 37.pdf21 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 37.pdf20 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Tower 37 Form 5 FY 2022-23-min.pdf30 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 37.pdf18 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 37.pdf18 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 - 37.pdf21 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 37.pdf21 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 T37.pdf20 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 T37.pdf20 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 37.pdf24 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 T37.pdf24 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Runwal Gardens - Form 1 - Tower 37.pdf28 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 BLDG NO 37.pdf21 Apr 2023
Disclosure of sold/ booked inventoryFile: INVENTORY T37_compressed.pdf21 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 BLDG NO 37.pdf21 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A BLDG-37.pdf17 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Bldg 37.pdf30 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: build 37 ARCH.pdf22 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng 37_compressed.pdf22 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Runwal Gardens Tower 37.pdf22 Oct 2022
Details of encumbrancesFile: ENCUMB INDUSIND.pdf19 Aug 2022

How this compares with Thane

85%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 15 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Runwal Gardens Phase 4 Bldg No. 37 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dombivali7,600+ in Thane

Builder: Runwal Residency Private Limited

Runwal Residency Private Limited has 18 registrations on MahaRERA, including Runwal Gardens Phase I and Runwal Gardens Phase 2 Bldg no 18-23. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Runwal Gardens Phase 4 Bldg No. 37 is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Runwal Gardens Phase 4 Bldg No. 37?

The registered promoter entity is Runwal Residency Private Limited, a company as per the filing. Its CIN U45400MH2011PTC212140 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Runwal Gardens Phase 4 Bldg No. 37?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Runwal Gardens Phase 4 Bldg No. 37?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Runwal Gardens Phase 4 Bldg No. 37?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Runwal Gardens Phase 4 Bldg No. 37?

The professionals named in the filing: Architect: Ar Sandeep Prabhu for Sakaar; Architect: Precise Architects and consultants; Architect: Saakar Architects; Architect: Sakar Architects; Engineer: Chetan Sampat; Engineer: SHAILESH MAHIMTURA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Runwal Gardens Phase 4 Bldg No. 37?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Runwal Gardens Phase 4 Bldg No. 37. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Runwal Gardens Phase 4 Bldg No. 37 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.