Runwal Gardens Phase 3 Bldg No 29-30
By Runwal Residency Private Limited
RG-MH-28808 · RERA P51700028344 · Last updated on MahaRERA portal: 20 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 4 months past the filed date
- 8 complaints at MahaRERA
- Rs 790.00 crore secured on the land, in favour of INDUSIND BANK LTD
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Runwal Gardens Phase 3 Bldg No 29-30 is a Residential / Group Housing project by Runwal Residency Private Limited in Thane, Maharashtra, registered with MahaRERA as P51700028344 on 18 Feb 2021. Possession was promised by 30 Jun 2026 and is now 4 months past that date. 8 complaints are on record with the regulator.
At a glance
Project
- NameRunwal Gardens Phase 3 Bldg No 29-30
- TypeResidential / Group Housing
- Location
- Village Gharivali usarghar and Sagoan
- Dombivli
- Kalyan
- Thane
- 421204
- Pincode421204
- RERA no.P51700028344
- ReraGenie IDRG-MH-28808
Builder
- NameRunwal Residency Private Limited
- Entity typeCompany
- CINU45400MH2011PTC212140
- CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- DirectorsVijay Kisan Patil, Lucy Roychoudhury
- Other registrations17 more →
- Completed3 of 18
- No longer live5 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on18 Feb 2021
- Promised completion30 Jun 2026
- Revised completionNone
- Buildings2 building records
- Documents filed145 files
Current status
Figures as on 20 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building No 29 | NA | 35 | 0 | 0 | 0 | 0 |
| Building No 30 | NA | 35 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 98%.
Building No 2962%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 19% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 55% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 70% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 60% |
Building No 3068%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 98% |
| Sanitary Fittings within the flats / premises | 25% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 85% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 60% |
Progress on shared amenities15
As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 25% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 25% |
| Storm Water Drains | Yes | 30% |
| Landscaping & Tree Planting | Yes | 25% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 50% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 40% |
| Electrical meter room, sub-station, receiving station | Yes | 20% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed1
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Building No 29 | NA | Rs 72.68 cr | Rs 60.70 cr |
| Building No 30 | NA | Rs 70.00 cr | Rs 60.03 cr |
| - | NA | Rs 40.24 cr | Rs 26.67 cr |
Certifying professionals and partners11
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ar. Sandeep Prabhu for SAAKAAR |
| Architect | Precise Architects and consultants |
| Architect | Saakar Architects |
| Engineer | Chetan Sampat |
| Engineer | Uttam Kawathankar |
| Engineer | SHAILESH MAHIMTURA |
| Chartered Accountant | Bhatter & Company Chartered Accountants |
| Chartered Accountant | M.B. Agrawal & Co. |
| Chartered Accountant | kshirsagar and associates |
| Chartered Accountant | M B AGARWAL AND CO |
| Chartered Accountant | singhi and co |
| Partner | Role in project |
|---|---|
| Runwal Residency Private Limited | - |
Complaints filed with MahaRERA8
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000197353 | Shraddha Nilesh Toraskar | Runwal Residency Pvt ltd | 21/06/2021 |
| CC12602810 | Ketan Panchal | Runwal Residency Private Limited | 14/05/2026 |
| CC12503387 | Runwal Residency Private Limited | Rohit Vishwanath Rankhambe | 22/09/2025 |
| CC12504086 | Runwal Residency Private Limited | Mr Jogindar Balbirsingh Bohit | 19/11/2025 |
| CC12504475 | Runwal Residency Private Limited | Mr Dnyaneshwar G Pawar | 15/12/2025 |
| CC12504476 | Runwal Residency Private Limited | Mrs Chitra Avinash More | 15/12/2025 |
| CC12504478 | Runwal Residency Private Limited | Vijay Shivmurti Chaurasiya | 15/12/2025 |
| CC12504508 | Runwal Residency Private Limited | SMITA SAKHARAM SHINDE | 17/12/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 4 Nov 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 12 Feb 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 12 Feb 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed145
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 145 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: form 1 29-30.pdf | 20 Apr 2026 |
| Form 2File: ENGINEERS CERTIFICATE 29-30.pdf | 20 Apr 2026 |
| Form 3File: Form 3 Tower 29 to 30.pdf | 20 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Runwal Gardens 29 30.pdf | 20 Apr 2026 |
| Form 1File: Form 1 29 30 DEC 25.pdf | 19 Jan 2026 |
| Form 2File: form 2 29-30 dec 25.pdf | 19 Jan 2026 |
| Form 3File: Form 3 Tower 29 to 30.pdf | 19 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Runwal Gardens 29 30 2026.pdf | 19 Jan 2026 |
| Self-declaration of Quarterly ProgressFile: Declaration for Compliance RRPL.pdf | 19 Jan 2026 |
| Form 1File: Form 1 29 30.pdf | 20 Oct 2025 |
| Form 2File: Form 2 29 30.pdf | 20 Oct 2025 |
| Form 3File: Form 3 Tower 29 to 30.pdf | 20 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: 29 30 inventory.pdf | 20 Oct 2025 |
| Self-declaration of Quarterly ProgressFile: Declaration for Compliance RRPL final.pdf | 20 Oct 2025 |
| Form 2A (FY 2024-2025)File: Form 2A 29 30.pdf | 20 Oct 2025 |
| Form 5 (FY 2024-2025)File: RRPL T29-30.pdf | 20 Oct 2025 |
| Withdrawal Update Form 1File: Form 1 RG Phase 3 blg no 29 30.pdf | 9 Oct 2025 |
| Withdrawal Update Form 2File: FORM 2 T29 to T30 30 06 2025.pdf | 9 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 Tower 29 to 30.pdf | 9 Oct 2025 |
| Withdrawal Update Form 1File: Form 1 RG Phase 3 blg no 29 30.pdf | 7 Oct 2025 |
| Withdrawal Update Form 1File: Form 1 RG Phase 3 blg no 29 30.pdf | 7 Oct 2025 |
| Withdrawal Update Form 1File: Form 1 RG Phase 3 blg no 29 30.pdf | 7 Oct 2025 |
| Withdrawal Update Form 2File: FORM 2 T29 to T30 30 06 2025.pdf | 7 Oct 2025 |
| Withdrawal Update Form 2File: FORM 2 T29 to T30 30 06 2025.pdf | 7 Oct 2025 |
| Withdrawal Update Form 2File: FORM 2 T29 to T30 30 06 2025.pdf | 7 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 Tower 29 to 30.pdf | 7 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 Tower 29 to 30.pdf | 7 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 Tower 29 to 30.pdf | 7 Oct 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Tower 29 to 30.pdf | 2 May 2025 |
| Disclosure of sold/ booked inventoryFile: Runwal Gardens Phase 3 Bldg No 29 30.pdf | 2 May 2025 |
| Disclosure of sold/ booked inventoryFile: Runwal Gardens Phase 3 Bldg No 29 30 New.pdf | 23 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PH3 T29 to T30 RERA FORM 2 ENGINEERS CERTIIFICATE 31 03 2025.pdf | 18 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Tower 29 to 30.pdf | 12 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: doneForm 1 29 30 31st December 2024.pdf | 3 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Runwal Gardens Phase 3 Bldg No 29 to 30.pdf | 31 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Done PH3 T29 to T30 RERA FORM 2 ENGINEERS CERTIIFICATE.pdf | 30 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 29 30 31st December 2024 done.pdf | 24 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Tower 29 to 30 done.pdf | 21 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A NEW 2024-TW-29-30.pdf | 25 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PH3 T29 to T30 RERA FORM 2 ENGINEERS CERTIIFICATE 30-09-2024.pdf | 22 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 29-30.pdf | 21 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Runwal Gardens Phase 3 Bldg No 29-30.pdf | 21 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Tower 29 to 30.pdf | 18 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RRPL TOWER 29-30 Form-5 FY 23-24_signed.pdf | 7 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory Format - Phase-3C.pdf | 26 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 29 30.pdf | 23 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PH3 T29 to T30 FORM 2.pdf | 18 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Tower 29-30.pdf | 18 Jul 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: RRPL Revised CC phase 8 dated 14 May 2024_11zon.pdf | 12 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 -29-30 - March 24.pdf | 26 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Phase 3 T 29 to T 30.pdf | 18 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Tower 29-30.pdf | 17 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 T29-30.pdf | 25 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 29-30.pdf | 24 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Tower 29-30.pdf | 20 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Tower 29-30.pdf | 20 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 29-30.pdf | 21 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 29-30.pdf | 21 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 29-30.pdf | 20 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 29-30.pdf | 20 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Tower 29-30 Form 5 FY 2022-23-min.pdf | 30 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 29- 30.pdf | 18 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 29-30.pdf | 18 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 29-30.pdf | 21 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 29-30.pdf | 21 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 T29-T30.pdf | 20 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 T29-T30.pdf | 20 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 T29-T30.pdf | 24 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Phase 3 - 29-30.pdf | 16 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Phase 3 - 29-30.pdf | 16 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Runwal Gardens - Form 1 - Tower 29 to 30.pdf | 28 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: INVEN 29-30.pdf | 22 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 BLDG NO 29-30.pdf | 21 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 BLDG NO 29-30.pdf | 21 Apr 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Runwal Name Registation - Phase 3 Tower 29 to 30.pdf | 12 Apr 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Extension Certificate-Phase -3 Tower 24 to 30FINAL.pdf | 28 Feb 2023 |
| Other - FinanceFile: FINANCE ENCRUMBRANCES 29-30.pdf | 1 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 29-30 - 12-12-22.pdf | 10 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F 2 PHASE 3 Bldg 29 to 30.pdf | 9 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Bldg 29-30.pdf | 30 Nov 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 17 other registrations, which the RERA portal never shows together
- All 145 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Runwal Gardens Phase 3 Bldg No 29-30 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Dombivli7,600+ in Thane
Constrcution of 2557 EWS tenements at S.No.157
ARUN SHANKARRAO BORGAVE
Runwal Gardens Phase I
Runwal Residency Private Limited
Runwal Garden City Cluster 6 Tower 6 to 9
HORIZON PROJECTS PVT LTD
Runwal Gardens Phase 6A Bldg No. 53-54
Runwal Residency Private Limited
RGC Runwal My City EWS - LIG Building
HORIZON PROJECTS PVT LTD
BALAJI ESTATE PHASE 2
M/S SAI BALAJI BUILDCON
See every Thane project, with the district possession charts
Builder: Runwal Residency Private Limited
Runwal Residency Private Limited has 18 registrations on MahaRERA, including Runwal Gardens Phase I and Runwal Gardens Phase 2 Bldg no 18-23. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What does it mean that Runwal Gardens Phase 3 Bldg No 29-30 shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Runwal Gardens Phase 3 Bldg No 29-30 is delayed beyond 30 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Runwal Gardens Phase 3 Bldg No 29-30?
The registered promoter entity is Runwal Residency Private Limited, a company as per the filing. Its CIN U45400MH2011PTC212140 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Runwal Gardens Phase 3 Bldg No 29-30?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Runwal Gardens Phase 3 Bldg No 29-30?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Runwal Gardens Phase 3 Bldg No 29-30?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Runwal Gardens Phase 3 Bldg No 29-30?
The professionals named in the filing: Architect: Ar. Sandeep Prabhu for SAAKAAR; Architect: Precise Architects and consultants; Architect: Saakar Architects; Engineer: Chetan Sampat; Engineer: Uttam Kawathankar; Engineer: SHAILESH MAHIMTURA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Runwal Gardens Phase 3 Bldg No 29-30?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback