Red flags

  • 2 complaints at MahaRERA
  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 2 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2021Possession promisedregistration recorded completed
80 of 110Construction stages doneacross 10 buildings; furthest along: Podiums (if any), 0%
2Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

Runal Gateway Phase 1 is a Others project by Rajendra Suresh Jain in Pune, Maharashtra, registered with MahaRERA as P52100002021 on 31 Jul 2017. The registration is recorded completed; possession was promised by 29 Dec 2021. The completion date has moved by 24 months from the original filing. 2 complaints are on record with the regulator.

At a glance

Project

  • NameRunal Gateway Phase 1
  • TypeOthers
  • Location
    • Pune Mumbai Express Way
    • Kiwale
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 412101
  • Pincode412101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100002021
  • ReraGenie IDRG-MH-11650

Builder

  • NameRajendra Suresh Jain
  • Entity typeIndividual
  • Other registrations4 more →
  • Completed4 of 5
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

this monthRegisteredJul 2017First promiseDec 2019Revised toDec 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on31 Jul 2017
  • Promised completion29 Dec 2021
  • Revised completionRevised to 29 Dec 2021 (originally 30 Dec 2019)
  • Buildings10 building records
  • Documents filed71 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WingNA230000
B WingNA230000
C WingNA230000
D WingNA230000
Commercial and Amenity BuildingNA40000
G WINGNA20000
I WINGNA20000
H WINGNA20000
Row House Cluster-4NA00000
Row House Cluster-5NA00000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building10

As on 13 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

80 of 110 construction stages are filed complete across 10 buildings. The stage furthest along is Podiums (if any), at 0%.

A Wing100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B Wing100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C Wing100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
D Wing100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Commercial and Amenity Building82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
G WING82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
I WING82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
H WING82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Row House Cluster-40%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Row House Cluster-50%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities17

As on 13 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%
24x7 Security System with CCTV at strategic PointsYes100%
Compound wall fencing security cabin cum surveillance room near main gateYes100%

Parking filed392

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots392
Closed/Covered298
Open Space94
BuildingClosed/CoveredOpen SpaceTotal
A Wing691382
B Wing641781
C Wing8121102
D Wing8222104
G WING088
I WING01212
H WING213

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area21,420 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI32117.74
Proposed, not sanctioned32,118 sq m
Buildings approved10
Buildings sanctioned8

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 3 TO 8, F WING, PREMIER PLAZA CHINCHWAD PUNE 411019

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectLandmark Design Group
EngineerUmesh Joshi, Designated Partner JW Consultants LLP
PartnerRole in project
Rajendra Suresh Jain-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100003907Dec 2019 → Dec 2020

Reason as filed by the promoterDue to Heavy Monsoon and Labours Problem.

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC005000000177707M/s Runal Developers proprietary concern of Mr. Rajendra JainMrs Mangal Ashok Kadam22/10/2022
CC005000000177710M/s Runal Developers proprietary concern of Mr. Rajendra JainMrs Mangal Ashok Kadam22/10/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Oct 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 May 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Oct 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 May 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 21 Aug 2021

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of ConveyanceFile: Desclosure regarding-Conveyance-13-12-2024_0001_compressed-compressed (1).pdf13 Dec 2024
Details of encumbrancesFile: NO ENCUMBRANCE-RELEASE DEEDS-INDEX-II.pdf9 Nov 2024
Status of ConveyanceFile: Index 2 Copy Gateway Conveyance Deed_0001_compressed.pdf9 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Phase I 20-21 Qualitay certifiate.PDF21 Aug 2021
Disclosure of sold/ booked inventoryFile: commercial gateway booking001.pdf21 Aug 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: completion letter commercial gateway001.pdf21 Aug 2021
Architect’s Certificate on Completion of Project (Form 4)File: form -4 phase 1.pdf21 Aug 2021
Disclosure of sold/ booked inventoryFile: Gateway A Wing001-min.pdf14 Aug 2021
Disclosure of sold/ booked inventoryFile: Gateway B Wing001-min.pdf14 Aug 2021
Disclosure of sold/ booked inventoryFile: Gateway C Wing001-min.pdf14 Aug 2021
Disclosure of sold/ booked inventoryFile: Gateway D Wing001-min.pdf14 Aug 2021
Disclosure of sold/ booked inventoryFile: Gateway Row g-wing phase-1.pdf14 Aug 2021
Disclosure of sold/ booked inventoryFile: Gateway Row h-wing phase-1.pdf14 Aug 2021
Disclosure of sold/ booked inventoryFile: Gateway Row i winh phase-1.pdf14 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5_Runal Gateway_ Phase I.pdf13 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Annexure B_Runal Gateway_ Phase I.pdf13 Aug 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Runal Gateway A Wing Society Registration Certificate.pdf13 Aug 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Runal Gateway B Wing Society Registeration Certificate.pdf13 Aug 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Runal Gateway C Wing Society Registration Certificate.pdf13 Aug 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Runal Gateway D Wing Society Registration Certificate.pdf13 Aug 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Regsitration certificate- Row House001.pdf13 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 along with annexure Phase I.pdf21 May 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate.pdf21 May 2021
Proforma of Allotment letterFile: Shop Agreement 2nd viersion-compressed.pdf29 Jun 2019
Form 2AFile: Document_001_compressed.pdf13 Jun 2019
Proforma of Allotment letterFile: Agreementshop phase one version 1.pdf13 Jun 2019
Proforma of Allotment letterFile: Allotment Row House-Phase-I 5version.pdf11 Jun 2019
Proforma of Allotment letterFile: Draft Agreement flat Phase-I8version.pdf11 Jun 2019
Layout approvalFile: LAYOUT NEW.pdf10 May 2019
Copy of Layout Approval (in case of layout)File: LAYOUT NEW.pdf10 May 2019
Commencement Certificates / NA Order for plotted developmentFile: new commencement.pdf10 May 2019
Proforma of Allotment letterFile: Allotment Draft Flat.pdf10 May 2019
Proforma of Allotment letterFile: Allotment Row House draft 4.pdf10 May 2019
Proforma of Allotment letterFile: Final Agreement-for-sale-_Flat-Agreement-6th-Version.pdf27 Feb 2019
Proforma of Allotment letterFile: Final Agreement-for-Sale-_Row-House-3rd-Version.pdf27 Feb 2019
Certificates of CA (Form 5)File: Gateway Report - Form 5.pdf5 Jan 2019
Details of encumbrancesFile: Encumbrance certificate -1.PDF3 Nov 2018
Details of encumbrancesFile: Encumbrance Certificate (2).PDF3 Nov 2018
Declaration in FORM BFile: Promoters Declaration.PDF3 Nov 2018
Proforma of Allotment letterFile: Allotment and Draft Agreement of flat.pdf3 Nov 2018
Copy of the legal title reportFile: Certificate of Title.PDF29 Oct 2018
Proforma of Allotment letterFile: Allottment and Draft Agreement of Row House Phase-I-min.pdf29 Oct 2018
Proforma of Allotment letterFile: 4th Version Allotment and Agreement.pdf6 Jul 2018
OtherFile: VERSION-3 PROMOTERS LAYOUT PLAN 07032018.pdf9 Mar 2018
Proforma of Allotment letterFile: Runal Gateway phase-I Allotment and Row House Agreement120118.pdf12 Jan 2018
Layout approvalFile: GATEWAY SANCTION PLAN_171017.pdf17 Oct 2017
Building plan approvalFile: G_AND_H WING PLAN_171017.pdf17 Oct 2017
Building plan approvalFile: I WING PLAN_171017.pdf17 Oct 2017
Copy of Layout Approval (in case of layout)File: GATEWAY SANCTION PLAN_171017.pdf17 Oct 2017
Building Plan Approval (IOD)File: G_AND_H WING PLAN_171017.pdf17 Oct 2017
Building Plan Approval (IOD)File: I WING PLAN_171017.pdf17 Oct 2017
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE_171017.PDF17 Oct 2017
Proforma of Allotment letterFile: AGREEMENT COPY_171017.pdf17 Oct 2017
OtherFile: PromotersProposedLayout.pdf17 Oct 2017
Proforma of Allotment letterFile: gateway allotment and agreement file (2).pdf31 Jul 2017
Proforma of Allotment letterFile: gateway allotment and agreement file.pdf31 Jul 2017
Certificates of CA (Form 3)File: 7_CA CERTIFICATE.pdf27 Jul 2017
Proforma of Allotment letterFile: 6_ALLOTMENT AND AGREEMENT.pdf27 Jul 2017
OtherFile: 14_PROMOTER'S PROPOSED LAYOUT PLAN.pdf27 Jul 2017
OtherFile: 13_ARCHITECT COPY OF PROPOSED LAYOUT PLAN.pdf27 Jul 2017
Layout approvalFile: 7_SANCTION PLAN.pdf26 Jul 2017
Building plan approvalFile: 7_SANCTION PLAN.pdf26 Jul 2017
PAN CardFile: 2_JAIN SIR_PAN CARD.PDF26 Jul 2017
Copy of the legal title reportFile: 5_TITLE SEARCH.PDF26 Jul 2017
Details of encumbrancesFile: 6_ENCUMBRANCE WITH LOAN CERTIFICATE.pdf26 Jul 2017
Copy of Layout Approval (in case of layout)File: 7_SANCTION PLAN.pdf26 Jul 2017
Building Plan Approval (IOD)File: 7_SANCTION PLAN.pdf26 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: 9_COMMENCEMENT CERTIFICTATE.PDF26 Jul 2017
Declaration in FORM BFile: 7_FORM-B.PDF26 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 10_ARCHITECT CERTIFICATE.PDF26 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 11_ENGINEER CERTIFICATE.PDF26 Jul 2017

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Runal ElanzaPlot No 17 sector no 29 at pimpari chinchawad Corp Haveli Pune 41210124CompletedJun 2019Jan 2019
ROYAL CASAS NO 206 HISSA NO 04 CTS NO 274 338 Village Ravet Taluka Haveli District Pune412101283CompletedMar 2012Feb 2012

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 24 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Runal Gateway Phase 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kiwale13,700+ in Pune

2 kmRunal Gateway Phase 1Completed 84Lapsed / revoked 50Other 116Dot size: filed unitsN

Filed coordinates, straight-line distance. 250 registered projects within 2 km.

Builder: Rajendra Suresh Jain

Rajendra Suresh Jain has 5 registrations on MahaRERA, including Runal Elanza and Runal Gateway Phase 1. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Runal Gateway Phase 1 is delayed beyond 29 Dec 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Runal Gateway Phase 1?

The registered promoter entity is Rajendra Suresh Jain, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Runal Gateway Phase 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Runal Gateway Phase 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Runal Gateway Phase 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Runal Gateway Phase 1?

The professionals named in the filing: Architect: Landmark Design Group; Engineer: Umesh Joshi, Designated Partner JW Consultants LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Runal Gateway Phase 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Runal Gateway Phase 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Runal Gateway Phase 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.