ReraGenieLog inGet a buyer report

Home / Browse projects / RUDRAKSHUM RESIDENCY

Registered No litigation declared Others project

RUDRAKSHUM RESIDENCY

By RUDRAKSHUM CONSTRUCTIONS PRIVATE LIMITED

RG-MH-07437 · RERA P52100066464 · Last updated on MahaRERA portal: 23 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Mar 2028Possession promisedmoved 24 months from the original
3 of 11Construction stages donefurthest along: Stilt Floor, 92%
8 of 19Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 63 documents Report an error

RUDRAKSHUM RESIDENCY is a Others project by RUDRAKSHUM CONSTRUCTIONS PRIVATE LIMITED in Kharadi, 411014, registered with MahaRERA as P52100066464 on 11 Jun 2024. Possession is promised by 31 Mar 2028. The completion date has moved by 24 months from the original filing. 11 of the 19 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameRUDRAKSHUM RESIDENCY
  • TypeOthers
  • Location
    • Kharadi Lohgaon Road
    • Kharadi
    • 411014
  • Pincode411014
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100066464
  • ReraGenie IDRG-MH-07437

Builder

  • NameRUDRAKSHUM CONSTRUCTIONS PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsKARAN JAIPURIA, SIDHARTH JAIPURIA

Key dates

this monthRegisteredJun 2024First promiseMar 2026Revised toMar 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Jun 2024
  • Promised completion31 Mar 2028
  • Revised completionRevised to 31 Mar 2028 (originally 31 Mar 2026)
  • Buildings1 building record
  • Documents filed63 files

Current status

58%11 of 19 units booked
62.3%Work done, per cost certificate

Figures as on 23 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RUDRAKSHUM RESIDENCYNA5515419

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 92%.

RUDRAKSHUM RESIDENCY: 55% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor92%
Slabs of Super Structure67%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises62%
Sanitary Fittings within the flats / premises22%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks52%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.15%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 23 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes82%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed38

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots38
Closed/Covered1
Open Space37

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area929 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on19 Jun 2025

Approvals and building plan

Permissible FSI2940.61
Proposed, not sanctioned1,334 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR, UNIT NO - 8 AND 9, SR NO 62/1B, WING -D, GLOBAL HIGHSTREET, KHARADI, PUNE - 411014
Estimated costRs 3.82 cr
Cost incurredRs 2.38 cr
Work done62.34%
BuildingWingEstimatedIncurred
RUDRAKSHUM RESIDENCYNARs 3.82 crRs 2.38 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectASIF SHAIKH
EngineerRahul Patil
EngineerAmal Jalindar Nagargoje
Chartered AccountantV. S. Fathepur & Co
Chartered AccountantK Y M & & ASSOCIATES
PartnerRole in project
RUDRAKSHUM CONSTRUCTIONS PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA02032620060Mar 2026 → Mar 2028

Reason as filed by the promoterTo, MAHARERA, Sir/Mam, I, Mr. KARAN JAIPURIA Director of “RUDRAKSHUM CONSTRUCTIONS PRIVATE LIMITED” with registered office at Sahyadri Farm, Ground, Office No. 201, Suman Ankur Building, PO - Baner, Dist. Pune, State Maharashtra, Pin No 411045 do hereby state and explaining that, 1) We have registered the said project under MahaRERA on 11/06/2024 having MahaRERA registration no. P52100066464. We hereby apply to extend the said project time line. We have applied to PMC (Pune Municipal Corporation) for plan revision, the file has been submitted for revision in the current plan. We planned to rev

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2028

Documents filed63

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - June 2026.pdf23 Jul 2026
Withdrawal Update Form 2File: Form 2 - June 2026.pdf23 Jul 2026
Withdrawal Update Form 3File: Form 3 - June 2026.pdf23 Jul 2026
Form 5 (FY 2025-2026)File: Form 5 - Rudrakshum Constructions Pvt Ltd - rudra.pdf23 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A- Engineer certificate Quality Assurance - March 2026.pdf18 Apr 2026
Withdrawal Update Form 1File: Form 1- Architect - March 2026.pdf9 Apr 2026
Withdrawal Update Form 1File: Form 1- Architect - March 2026.pdf9 Apr 2026
Withdrawal Update Form 2File: Form 2- Engineers - March 2026.pdf9 Apr 2026
Withdrawal Update Form 2File: Form 2- Engineers - March 2026.pdf9 Apr 2026
Withdrawal Update Form 3File: Form 3- CA - March 2026.pdf9 Apr 2026
Withdrawal Update Form 3File: Form 3- CA - March 2026.pdf9 Apr 2026
Withdrawal Update Form 1File: Form 1 - Rudra- Dec 25.pdf13 Jan 2026
Withdrawal Update Form 2File: Form 2 - Rudra- Dec 25.pdf13 Jan 2026
Withdrawal Update Form 3File: Form 3 - Rudra- Dec 25.pdf13 Jan 2026
Withdrawal Update Form 1File: Form 1 - Rudrakshum - Sept 25.pdf15 Oct 2025
Withdrawal Update Form 2File: Form 2 - Rudrakshum - sept 25.pdf15 Oct 2025
Withdrawal Update Form 3File: Form 3 - rudrakshum - sept 25.pdf15 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 - Rudrakshum Constructions Pvt Ltd.pdf16 Sep 2025
Form 2A (FY 2024-2025)File: Form 2A - FY -2024-25.pdf25 Jul 2025
Withdrawal Update Form 1File: Form - 1 June 2025.pdf22 Jul 2025
Withdrawal Update Form 2File: rera Form - 2 - June 25.pdf22 Jul 2025
Withdrawal Update Form 3File: Form - 3 June 2025.pdf22 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- March 2025.pdf17 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- March 2025.pdf17 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 1- March 2025.pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: rudra form 1.pdf23 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: rudra form 3 dec 24_compressed.pdf23 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: rudra form 2.pdf23 Jan 2025
Disclosure of sold/ booked inventoryFile: disclosure.pdf23 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Rudrakshum- Sept 2024.pdf26 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Rudrakshum- Sept 2024.pdf26 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Rudrakshum- Sept 2024.pdf26 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Architect - June 2024.pdf27 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Engineers - June 2024.pdf27 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- CA- June 2024.pdf27 Jul 2024
Other - LegalFile: PAGE NO 1-25 - Land Purchase agreement - KHARADI.pdf7 Jun 2024
Other - LegalFile: PAGE NO 26-50 - Land Purchase agreement - KHARADI.pdf7 Jun 2024
Other - LegalFile: खराडी_55_2_45_Satbara.pdf7 Jun 2024
CERSAI detailsFile: 2) CERSAI_Search_Report.pdf29 May 2024
CERSAI detailsFile: 2) declaration cum undertaking CERSAI.pdf29 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 1) Format A - declaration seperate bank.pdf29 May 2024
Other - TechnicalFile: 3) Declaration no dubble registration.pdf29 May 2024
Layout approvalFile: 7 - LAYOUT.pdf25 May 2024
Building plan approvalFile: 7 - LAYOUT.pdf25 May 2024
PAN CardFile: Pan card Rudrakshum Constuctions Pvt Ltd.pdf25 May 2024
Copy of the legal title reportFile: Title Report.pdf25 May 2024
Details of encumbrances concerned to FinanceFile: 6 - Self declaration - legal encumbrance.pdf25 May 2024
Details of encumbrances concerned to FinanceFile: 5 - Self declaration - Fianance encumbrance.pdf25 May 2024
Details of encumbrances concerned to LegalFile: 6 - Self declaration - legal encumbrance.pdf25 May 2024
Details of encumbrances concerned to LegalFile: 5 - Self declaration - Fianance encumbrance.pdf25 May 2024
Copy of Layout Approval (in case of layout)File: 7 - LAYOUT.pdf25 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 7 - LAYOUT.pdf25 May 2024
Commencement Certificates / NA Order for plotted developmentFile: 8 - Commencement Certificate.pdf25 May 2024
Declaration about Commencement CertificateFile: 9 - Self declaration - Commencement certificate.pdf25 May 2024
Declaration in FORM BFile: 1 - Form B.pdf25 May 2024
Declaration in FORM BFile: 10 - CERSAI details - Declaration - cersai.pdf25 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 11 - CA Certificate on Project Cost and Fund withdrawal.pdf25 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: desclosure of interest- other real estate.pdf25 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: desclosure of interest- other real estate 2.pdf25 May 2024
Proforma of Agreement for saleFile: 12 - Proforma - Agrrement for sale.pdf25 May 2024
Proforma of Allotment letterFile: 13 - Proforma of Allottment letter.pdf25 May 2024
Deviation Report with respect to Allotment letterFile: 14 - Deviation Report with respect to model copy of Agreement Allotment letter.pdf25 May 2024
Deviation Report with respect to model copy of AgreementFile: 15- Deviation Report with respect to agreement for sale.pdf25 May 2024

Keep RUDRAKSHUM RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kharadi

2 kmRUDRAKSHUM RESIDENCYCompleted 3Lapsed / revoked 1Other 1Dot size: filed unitsN

Filed coordinates, straight-line distance. 5 registered projects within 2 km.

Builder: RUDRAKSHUM CONSTRUCTIONS PRIVATE LIMITED

RUDRAKSHUM CONSTRUCTIONS PRIVATE LIMITED has 1 registration on MahaRERA, including RUDRAKSHUM RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What are my rights if RUDRAKSHUM RESIDENCY is delayed beyond 31 Mar 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RUDRAKSHUM RESIDENCY?

The registered promoter entity is RUDRAKSHUM CONSTRUCTIONS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RUDRAKSHUM RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RUDRAKSHUM RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RUDRAKSHUM RESIDENCY?

The professionals named in the filing: Architect: ASIF SHAIKH; Engineer: Rahul Patil; Engineer: Amal Jalindar Nagargoje; Chartered Accountant: V. S. Fathepur & Co; Chartered Accountant: K Y M & & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RUDRAKSHUM RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RUDRAKSHUM RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RUDRAKSHUM RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.