Home / Browse projects / Pune, Maharashtra / ROHAN LEHER III

Completed No litigation declared Residential / Group Housing project

ROHAN LEHER III

By ROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED

RG-MH-10108 · RERA P52100000794 · Last updated on MahaRERA portal: 30 Sep 2022

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 27 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2022Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 88 documents Report an error

ROHAN LEHER III is a Residential / Group Housing project by ROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100000794 on 23 Jul 2017. The registration is recorded completed; possession was promised by 30 Jun 2022.

At a glance

Project

  • NameROHAN LEHER III
  • TypeResidential / Group Housing
  • Location
    • Baner Road
    • Baner
    • Haveli
    • Pune
    • 411045
  • Pincode411045
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100000794
  • ReraGenie IDRG-MH-10108

Builder

  • NameROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED
  • Entity typeCompany
  • CINU45202PN2001PTC016352
  • GSTIN27AABCR8171R1ZL
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorsSUHAS KUSHALCHAND LUNKAD, SANJAY KUSHALCHAND LUNKAD, MILIND KUSHALCHAND LUNKAD, DEEPAK KUSHALCHAND BHATEWARA
  • Other registrations27 more →
  • Completed15 of 28
  • Declared earlier projects15 →

Key dates

this monthRegisteredJul 2017PromisedJun 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on23 Jul 2017
  • Promised completion30 Jun 2022
  • Revised completionNone
  • Buildings1 building record
  • Documents filed88 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING ANA200000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Sep 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

BUILDING A: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 30 Sep 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed199

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots199
Closed/Covered199

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,110 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI13277.04
Proposed, not sanctioned9,644 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch885 BHANDARKAR RD OPP SANE DAIRY PUNE 411004

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHUBHANGI SUNIL HINGMIRE
PartnerRole in project
ROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Jun 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Oct 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 7 Oct 2021

Documents filed88

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Leher III FY 21 22.pdf30 Sep 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Reg Certificate LEHER III.pdf2 Dec 2021
Form 2AFile: Leher III 2A - Sep 21.pdf13 Oct 2021
Building plan approvalFile: Revised Sanction Plan Leher III.pdf7 Oct 2021
Building Plan Approval (IOD)File: Revised Sanction Plan Leher III.pdf7 Oct 2021
Commencement Certificates / NA Order for plotted developmentFile: Revised CC Leher III.pdf7 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Leher III Engg Sep 21.pdf7 Oct 2021
Disclosure of sold/ booked inventoryFile: Leher III Inventory Update - Sep 21.pdf7 Oct 2021
Certificates of CA (Form 3)File: Leher III CA Cert Sep 21.pdf7 Oct 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Leher III.pdf7 Oct 2021
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Rohan leher III - Sept 21.pdf7 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Leher III Form 5.pdf30 Sep 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Leher III Architech Cert June 21.pdf14 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Cert Leher III June 21.pdf14 Aug 2021
Form 2AFile: Leher III 2A Cert June 21.pdf14 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2A Leher III Mar 21.pdf14 Aug 2021
Disclosure of sold/ booked inventoryFile: Inventory Update Leher III June 21.pdf14 Aug 2021
Certificates of CA (Form 3)File: CA Cert Leher III June 21.pdf14 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Cer Leher III Mar 21.pdf1 Jul 2021
Form 2AFile: 2A Leher III Mar 21.pdf1 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Leher III Mar 21.pdf30 Jun 2021
Disclosure of sold/ booked inventoryFile: Leher III Mar 21.pdf2 Jun 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: LEHER III Engg Cert DEC 20.pdf31 Mar 2021
Certificates of CA (Form 3)File: LEHER III CA certificate DEC 2020 RotatePdf.pdf31 Mar 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: LEHER III Engg Cert - Sep 20.pdf17 Dec 2020
Form 2AFile: 2A Leher III Sep 20.pdf17 Dec 2020
Certificates of CA (Form 3)File: LEHER III CA Cert SEP 20.pdf17 Dec 2020
Certificates of CA (Form 5)File: CA Cert Leher III June 20.pdf3 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Cert Leher III Mar 20.pdf29 Oct 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Leher III.pdf29 Oct 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Cert Leher III Mar 20.pdf17 Aug 2020
Form 2AFile: Engg 2A Leher III Mar 20.pdf17 Aug 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Cert Leher III Mar 20.pdf14 Aug 2020
Certificates of CA (Form 3)File: CA Cert Leher III Mar 20.pdf14 Aug 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Cert Leher III Dec 19.pdf28 Feb 2020
Certificates of CA (Form 3)File: CA Cert LEHER III DEC 19.pdf28 Feb 2020
Form 2AFile: 2A LEHER III DEC 19.pdf17 Feb 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Cert Leher III Sep 19.pdf26 Nov 2019
Certificates of CA (Form 3)File: CA Cert LEHER III Sep 19.pdf26 Nov 2019
Form 2AFile: 2A L III SEP 19.pdf25 Nov 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Leher-III_FY 18-19 Form 5.pdf25 Nov 2019
Certificates of CA (Form 5)File: Leher-III_FY 18-19.pdf30 Sep 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate L III June 2019.pdf19 Aug 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG L III JUNE 19.pdf19 Aug 2019
Form 2AFile: QA L III JUNE 19.pdf19 Aug 2019
Certificates of CA (Form 3)File: CA Cert Leher III June 19.pdf19 Aug 2019
Proforma of Allotment letterFile: Rohan Leher III AGRMTRERA.PDF1 Jul 2019
Layout approvalFile: Plain Sheet Leher III 04 06 19.pdf7 Jun 2019
Copy of Layout Approval (in case of layout)File: Plain Sheet Leher III 04 06 19.pdf7 Jun 2019
Commencement Certificates / NA Order for plotted developmentFile: CC Leher III 04 06 19.pdf7 Jun 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECTS CERTIFICATE Leher III 10042019.pdf6 Jun 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Leher 3.pdf6 Jun 2019
Form 2AFile: 2A Quality Certificate Leher III Mar 19.pdf6 Jun 2019
Certificates of CA (Form 3)File: CA Cert LEH III Mar 19.pdf6 Jun 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Cert Leher III.pdf31 Jan 2019
Certificates of CA (Form 3)File: CA Cert Leher III.pdf31 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate Leher III.pdf23 Jan 2019
Form 2AFile: Engineers Certificate 2A Leher III.pdf23 Jan 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Cert - Leher III - Sep 18.pdf19 Nov 2018
Certificates of CA (Form 3)File: CA Certificate - Leher III - Sep 18.pdf19 Nov 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECTS CERTIFICATE-Leher-III 10102018.pdf16 Nov 2018
Certificates of CA (Form 5)File: Leher-III.pdf29 Sep 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECTS CERTIFICATE-Leher-III.pdf3 Aug 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate_Leher III_June 18.pdf3 Aug 2018
Certificates of CA (Form 3)File: CA Certificate_Leher III_June 18.pdf3 Aug 2018
Certificates of CA (Form 3)File: CA Certificate - Leher-III.pdf11 May 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECTS CERTIFICATE-Leher-III 26042018.pdf8 May 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Certificate Leher-III.pdf8 May 2018
Commencement Certificates / NA Order for plotted developmentFile: Leher III CC.pdf12 Mar 2018
Commencement Certificates / NA Order for plotted developmentFile: Leher III Commencement Certificate.pdf12 Mar 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate Leher-III.pdf24 Feb 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate For RERA - Leher III.pdf24 Feb 2018
Certificates of CA (Form 3)File: C A Certificate Leher III.pdf24 Feb 2018
Layout approvalFile: Sheet No 1.pdf20 Jul 2017
Building plan approvalFile: Commencement Certificate.pdf20 Jul 2017
Layout approvalFile: Sheet No 2.pdf20 Jul 2017
PAN CardFile: RBDPL PAN.pdf20 Jul 2017
Copy of the legal title reportFile: Title Report.pdf20 Jul 2017
Details of encumbrancesFile: Encumbrance Certificate Leher 3.pdf20 Jul 2017
Copy of Layout Approval (in case of layout)File: Sheet No 2.pdf20 Jul 2017

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Rohan Ekam Phase 2PR1261012502532Balewadi, Pune100Feb 2026OngoingMar 2030Not due yet
Rohan Ekam Phase 1P52100052298Balewadi, Pune414Aug 2023OngoingDec 2027Not due yet
ROHAN VITIP52100046719Wakad, Pune93Sep 2022OngoingDec 2027Registered original: Dec 2025Not due yet
ROHAN ANAND PHASE IIP52100023451SOMATANE PHATA, Pune241Dec 2019OngoingDec 2026Registered original: Dec 2025Not due yet

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ROHAN LEHER III on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Baner13,700+ in Pune

2 kmROHAN LEHER IIICompleted 132Lapsed / revoked 39Other 91Dot size: filed unitsN

Filed coordinates, straight-line distance. 262 registered projects within 2 km.

Builder: ROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED

ROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED has 28 registrations on MahaRERA, including ROHAN KRITIKA WINGS A C and ROHAN LEHER 2 WING A. Its filings disclose 15 earlier MahaRERA projects: declares 9 of 10 past projects completed on time. Litigation is declared on 8 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if ROHAN LEHER III is delayed beyond 30 Jun 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ROHAN LEHER III?

The registered promoter entity is ROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED, a company as per the filing. Its CIN U45202PN2001PTC016352 and GSTIN 27AABCR8171R1ZL can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ROHAN LEHER III?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ROHAN LEHER III?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ROHAN LEHER III?

The professionals named in the filing: Architect: SHUBHANGI SUNIL HINGMIRE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ROHAN LEHER III?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ROHAN LEHER III. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ROHAN LEHER III to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.