ROHAN LEHER III
By ROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED
RG-MH-10108 · RERA P52100000794 · Last updated on MahaRERA portal: 30 Sep 2022
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 27 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ROHAN LEHER III is a Residential / Group Housing project by ROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100000794 on 23 Jul 2017. The registration is recorded completed; possession was promised by 30 Jun 2022.
At a glance
Project
- NameROHAN LEHER III
- TypeResidential / Group Housing
- Location
- Baner Road
- Baner
- Haveli
- Pune
- 411045
- Pincode411045
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100000794
- ReraGenie IDRG-MH-10108
Builder
- NameROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED
- Entity typeCompany
- CINU45202PN2001PTC016352
- GSTIN27AABCR8171R1ZL
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- DirectorsSUHAS KUSHALCHAND LUNKAD, SANJAY KUSHALCHAND LUNKAD, MILIND KUSHALCHAND LUNKAD, DEEPAK KUSHALCHAND BHATEWARA
- Other registrations27 more →
- Completed15 of 28
- Declared earlier projects15 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on23 Jul 2017
- Promised completion30 Jun 2022
- Revised completionNone
- Buildings1 building record
- Documents filed88 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING A | NA | 20 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 30 Sep 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
BUILDING A: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 30 Sep 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
Parking filed199
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SHUBHANGI SUNIL HINGMIRE |
| Partner | Role in project |
|---|---|
| ROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 20 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 7 Jun 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 7 Oct 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 7 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 7 Oct 2021
Documents filed88
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Leher III FY 21 22.pdf | 30 Sep 2022 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Reg Certificate LEHER III.pdf | 2 Dec 2021 |
| Form 2AFile: Leher III 2A - Sep 21.pdf | 13 Oct 2021 |
| Building plan approvalFile: Revised Sanction Plan Leher III.pdf | 7 Oct 2021 |
| Building Plan Approval (IOD)File: Revised Sanction Plan Leher III.pdf | 7 Oct 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Revised CC Leher III.pdf | 7 Oct 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Leher III Engg Sep 21.pdf | 7 Oct 2021 |
| Disclosure of sold/ booked inventoryFile: Leher III Inventory Update - Sep 21.pdf | 7 Oct 2021 |
| Certificates of CA (Form 3)File: Leher III CA Cert Sep 21.pdf | 7 Oct 2021 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Leher III.pdf | 7 Oct 2021 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Rohan leher III - Sept 21.pdf | 7 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Leher III Form 5.pdf | 30 Sep 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Leher III Architech Cert June 21.pdf | 14 Aug 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Cert Leher III June 21.pdf | 14 Aug 2021 |
| Form 2AFile: Leher III 2A Cert June 21.pdf | 14 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2A Leher III Mar 21.pdf | 14 Aug 2021 |
| Disclosure of sold/ booked inventoryFile: Inventory Update Leher III June 21.pdf | 14 Aug 2021 |
| Certificates of CA (Form 3)File: CA Cert Leher III June 21.pdf | 14 Aug 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Cer Leher III Mar 21.pdf | 1 Jul 2021 |
| Form 2AFile: 2A Leher III Mar 21.pdf | 1 Jul 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Leher III Mar 21.pdf | 30 Jun 2021 |
| Disclosure of sold/ booked inventoryFile: Leher III Mar 21.pdf | 2 Jun 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: LEHER III Engg Cert DEC 20.pdf | 31 Mar 2021 |
| Certificates of CA (Form 3)File: LEHER III CA certificate DEC 2020 RotatePdf.pdf | 31 Mar 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: LEHER III Engg Cert - Sep 20.pdf | 17 Dec 2020 |
| Form 2AFile: 2A Leher III Sep 20.pdf | 17 Dec 2020 |
| Certificates of CA (Form 3)File: LEHER III CA Cert SEP 20.pdf | 17 Dec 2020 |
| Certificates of CA (Form 5)File: CA Cert Leher III June 20.pdf | 3 Nov 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Cert Leher III Mar 20.pdf | 29 Oct 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Leher III.pdf | 29 Oct 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Cert Leher III Mar 20.pdf | 17 Aug 2020 |
| Form 2AFile: Engg 2A Leher III Mar 20.pdf | 17 Aug 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Cert Leher III Mar 20.pdf | 14 Aug 2020 |
| Certificates of CA (Form 3)File: CA Cert Leher III Mar 20.pdf | 14 Aug 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Cert Leher III Dec 19.pdf | 28 Feb 2020 |
| Certificates of CA (Form 3)File: CA Cert LEHER III DEC 19.pdf | 28 Feb 2020 |
| Form 2AFile: 2A LEHER III DEC 19.pdf | 17 Feb 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Cert Leher III Sep 19.pdf | 26 Nov 2019 |
| Certificates of CA (Form 3)File: CA Cert LEHER III Sep 19.pdf | 26 Nov 2019 |
| Form 2AFile: 2A L III SEP 19.pdf | 25 Nov 2019 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Leher-III_FY 18-19 Form 5.pdf | 25 Nov 2019 |
| Certificates of CA (Form 5)File: Leher-III_FY 18-19.pdf | 30 Sep 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate L III June 2019.pdf | 19 Aug 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG L III JUNE 19.pdf | 19 Aug 2019 |
| Form 2AFile: QA L III JUNE 19.pdf | 19 Aug 2019 |
| Certificates of CA (Form 3)File: CA Cert Leher III June 19.pdf | 19 Aug 2019 |
| Proforma of Allotment letterFile: Rohan Leher III AGRMTRERA.PDF | 1 Jul 2019 |
| Layout approvalFile: Plain Sheet Leher III 04 06 19.pdf | 7 Jun 2019 |
| Copy of Layout Approval (in case of layout)File: Plain Sheet Leher III 04 06 19.pdf | 7 Jun 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Leher III 04 06 19.pdf | 7 Jun 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECTS CERTIFICATE Leher III 10042019.pdf | 6 Jun 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Leher 3.pdf | 6 Jun 2019 |
| Form 2AFile: 2A Quality Certificate Leher III Mar 19.pdf | 6 Jun 2019 |
| Certificates of CA (Form 3)File: CA Cert LEH III Mar 19.pdf | 6 Jun 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Cert Leher III.pdf | 31 Jan 2019 |
| Certificates of CA (Form 3)File: CA Cert Leher III.pdf | 31 Jan 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate Leher III.pdf | 23 Jan 2019 |
| Form 2AFile: Engineers Certificate 2A Leher III.pdf | 23 Jan 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Cert - Leher III - Sep 18.pdf | 19 Nov 2018 |
| Certificates of CA (Form 3)File: CA Certificate - Leher III - Sep 18.pdf | 19 Nov 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECTS CERTIFICATE-Leher-III 10102018.pdf | 16 Nov 2018 |
| Certificates of CA (Form 5)File: Leher-III.pdf | 29 Sep 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECTS CERTIFICATE-Leher-III.pdf | 3 Aug 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate_Leher III_June 18.pdf | 3 Aug 2018 |
| Certificates of CA (Form 3)File: CA Certificate_Leher III_June 18.pdf | 3 Aug 2018 |
| Certificates of CA (Form 3)File: CA Certificate - Leher-III.pdf | 11 May 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECTS CERTIFICATE-Leher-III 26042018.pdf | 8 May 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Certificate Leher-III.pdf | 8 May 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: Leher III CC.pdf | 12 Mar 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: Leher III Commencement Certificate.pdf | 12 Mar 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate Leher-III.pdf | 24 Feb 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate For RERA - Leher III.pdf | 24 Feb 2018 |
| Certificates of CA (Form 3)File: C A Certificate Leher III.pdf | 24 Feb 2018 |
| Layout approvalFile: Sheet No 1.pdf | 20 Jul 2017 |
| Building plan approvalFile: Commencement Certificate.pdf | 20 Jul 2017 |
| Layout approvalFile: Sheet No 2.pdf | 20 Jul 2017 |
| PAN CardFile: RBDPL PAN.pdf | 20 Jul 2017 |
| Copy of the legal title reportFile: Title Report.pdf | 20 Jul 2017 |
| Details of encumbrancesFile: Encumbrance Certificate Leher 3.pdf | 20 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Sheet No 2.pdf | 20 Jul 2017 |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Rohan Ekam Phase 2PR1261012502532 | Balewadi, Pune | 100 | Feb 2026 | Ongoing | Mar 2030 | Not due yet |
| Rohan Ekam Phase 1P52100052298 | Balewadi, Pune | 414 | Aug 2023 | Ongoing | Dec 2027 | Not due yet |
| ROHAN VITIP52100046719 | Wakad, Pune | 93 | Sep 2022 | Ongoing | Dec 2027Registered original: Dec 2025 | Not due yet |
| ROHAN ANAND PHASE IIP52100023451 | SOMATANE PHATA, Pune | 241 | Dec 2019 | Ongoing | Dec 2026Registered original: Dec 2025 | Not due yet |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 27 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 88 filed documents as one ZIP, foldered, with a manifest
Keep ROHAN LEHER III on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Baner13,700+ in Pune
Filed coordinates, straight-line distance. 262 registered projects within 2 km.
EARTH 1 BY VTP LUXE PHASE 1
MAHALUNGE REAL ESTATE DEVELOPERS PVT. LTD.
Godrej Meadows
Mahalunge Township Developers Private Limi
Godrej Green Vistas
Mahalunge Township Developers Private Limi
Godrej Hill Retreat
Mahalunge Township Developers Private Limi
Godrej Green Cove
Mahalunge Township Developers Private Limi
NYATI EMERALD I
NYATI BUILDERS PRIVATE LIMITED
Builder: ROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED
ROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED has 28 registrations on MahaRERA, including ROHAN KRITIKA WINGS A C and ROHAN LEHER 2 WING A. Its filings disclose 15 earlier MahaRERA projects: declares 9 of 10 past projects completed on time. Litigation is declared on 8 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if ROHAN LEHER III is delayed beyond 30 Jun 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ROHAN LEHER III?
The registered promoter entity is ROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED, a company as per the filing. Its CIN U45202PN2001PTC016352 and GSTIN 27AABCR8171R1ZL can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ROHAN LEHER III?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for ROHAN LEHER III?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ROHAN LEHER III?
The professionals named in the filing: Architect: SHUBHANGI SUNIL HINGMIRE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ROHAN LEHER III?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.