ROHAN ANAND PHASE II
By ROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED
RG-MH-15282 · RERA P52100023451 · Last updated on MahaRERA portal: 20 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ROHAN ANAND PHASE II is a Residential / Group Housing project by ROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100023451 on 16 Dec 2019. Possession is promised by 30 Dec 2026. The completion date has moved by 12 months from the original filing. 37 of the 230 units on this registration are recorded sold or booked, and 10 of 22 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameROHAN ANAND PHASE II
- TypeResidential / Group Housing
- Location
- SOMATANE PHATA ROAD
- SOMATANE PHATA
- Somatane
- Mawal
- Pune
- 410506
- Pincode410506
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100023451
- ReraGenie IDRG-MH-15282
Builder
- NameROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED
- Entity typeCompany
- CINU45202PN2001PTC016352
- GSTIN27AABCR8171R1ZL
- DirectorsSUHAS KUSHALCHAND LUNKAD, SANJAY KUSHALCHAND LUNKAD, MILIND KUSHALCHAND LUNKAD, DEEPAK KUSHALCHAND BHATEWARA
- Other registrations27 more →
- Completed15 of 28
- Declared earlier projects15 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on16 Dec 2019
- Promised completion30 Dec 2026
- Revised completionRevised to 30 Dec 2026 (originally 30 Dec 2025)
- Buildings2 building records
- Documents filed131 files
Current status
Figures as on 20 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building A | NA | 12 | 11 | 131 | 0 | 131 |
| Building B | NA | 12 | 10 | 99 | 0 | 99 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 40%.
Building A49%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building B48%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 30% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 75% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 75% |
| Street Lighting | Yes | 75% |
| Community Buildings | Yes | 90% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 60% |
| Fire protection and fire safety requirements | Yes | 60% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed443
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Building A | 246 | 246 |
| Building B | 197 | 197 |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| STANDARD CAPACITOR PRIVATE LIMITED | - | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Building B | NA | Rs 24.03 cr | Rs 22.11 cr |
| Building A | NA | Rs 19.96 cr | Rs 17.99 cr |
| - | NA | Rs 3.41 cr | Rs 3.41 cr |
Certifying professionals and partners9
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ankur Associates |
| Architect | Ar Prakash Kulkarni |
| Engineer | Pratik Deepak Bhatewara |
| Engineer | SATISH PISE |
| Engineer | Mahesh Balurgi |
| Engineer | Jitendra Kumar Jain - |
| Chartered Accountant | MAHENDRA GOLESHA |
| Chartered Accountant | Khandelwal Jain & Associates |
| Chartered Accountant | Golesha & Company |
| Partner | Role in project |
|---|---|
| ROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe have not yet launched the project for sale and we have not received any advance from the customers. We have recently started the construction activity for this project. The project launch has been delayed because of market uncertainty as well as Covid-19 pandemic. We have attached latest commencement certificate and CA certificate confirming the same. Request you to consider our request for extension of the proposed date of completion to 30-12-2026
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| SM12600097 | Ram Gawali | ROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED | 23/01/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Nov 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 19 Jul 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 20 Apr 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 19 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Dec 2026
Documents filed131
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 131 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Rohan Anand Phase 2.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: Rohan Anand Phase 2.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: Rohan Anand Phase 2.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: Rohan Anand Phase 2.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: Rohan Anand Phase 2.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: Rohan Anand Phase 2.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: Rohan Anand Phase 2.pdf | 18 Oct 2025 |
| Withdrawal Update Form 2File: Rohan Anand Phase 2.pdf | 18 Oct 2025 |
| Withdrawal Update Form 3File: Rohan Anand Phase 2.pdf | 18 Oct 2025 |
| Form 5 (FY 2024-2025)File: Anand Phase 2.pdf | 15 Sep 2025 |
| Form 2A (FY 2024-2025)File: Rohan Anand Phase 2.pdf | 24 Jul 2025 |
| Layout approvalFile: Sanction Plan Rohan Anand 05 06 25.pdf | 19 Jul 2025 |
| Commencement certificateFile: Commencement Certificate_compressed.pdf | 19 Jul 2025 |
| Withdrawal Update Form 1File: Rohan Anand Phase 2.pdf | 19 Jul 2025 |
| Withdrawal Update Form 2File: Form 2 Anand Phase 2 June 25.pdf | 19 Jul 2025 |
| Withdrawal Update Form 3File: Rohan Anand.pdf | 19 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rohan Anand Phase II.pdf | 19 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rohan Anand Phase 2.pdf | 19 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rohan Anand Phase 2.pdf | 19 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Rohan Anand Phase 2.pdf | 19 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert Anand Phase 2 Dec 24.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Anand Phase 2 Dec 24.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Cert Anand Phase 2 Dec 24.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Inv Update Anand Phase 2 Dec 24.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Anand P II.pdf | 19 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rohan Anand P II.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Anand P II.pdf | 19 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Rohan Anand P 2.pdf | 19 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Anand Phase 2 FY 23-24.pdf | 9 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rohan Anand P II Jun 24.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rohan Anand P II.pdf | 20 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Rohan Anand P II.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rohan Anand PII June 24.pdf | 20 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert Rohan Anand Phase 2 Mar 24.pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Cert Rohan Anand Ph 2 Mar 24.pdf | 20 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance Rohan Anand Ph 2 Mar 24.pdf | 20 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory Update Rohan Anand Ph 2 Mar 24.pdf | 20 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Rohan Anand Ph 2 Mar 24.pdf | 20 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert Rohan Anand Ph 2 Dec 23.pdf | 20 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Cert Rohan Anand Ph 2 Dec 23.pdf | 20 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory Update Anand Ph 2 Dec 23.pdf | 20 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Rohan Anand Ph 2 Dec 23.pdf | 20 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert Anand Phase 2 Sep -23.pdf | 19 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Cert Anand Phase 2 Sep 23.pdf | 19 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Inventory Update Anand Phase 2 Sep 23.pdf | 19 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Engg Cert Anand Phase 2 Sep 23.pdf | 19 Oct 2023 |
| Declaration about Commencement CertificateFile: Format D Revised Commencement Declaration.pdf | 6 Oct 2023 |
| Declaration in FORM BFile: Form B - RBDPL date extension.pdf | 6 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Quality Assurance Mar 23.pdf | 6 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Inventory update - Sep 23.pdf | 6 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Cert Anand Ph 2.pdf | 6 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert - Sep 23-c.pdf | 6 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 FY 23 ANAND PH 2.pdf | 30 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch Cert Anand Ph 2.pdf | 20 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Anand Ph 2.pdf | 20 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Inventory Update Anand Ph 2.pdf | 20 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Cert Anand Ph 2.pdf | 20 Jul 2023 |
| Building plan approvalFile: Revised Sanction Plan_Anand_18 04 23.pdf | 20 Apr 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Revised Sanction Plan_Anand_18 04 23.pdf | 20 Apr 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Revised CC_Anand_18 04 23_c.pdf | 20 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert Anand Ph 2 Q4.pdf | 20 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Cert Anand Ph 2 Q4.pdf | 20 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Q4 Anand Ph 2.pdf | 20 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Inv Update Q4 Anand 2.pdf | 20 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Anand Ph 2 Q4.pdf | 20 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert Anand Phase 2 Dec 22.pdf | 20 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Cert Anand Phase 2 Dec 22.pdf | 20 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Inv update Anand Phase 2 Dec 22.pdf | 20 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Anand Phase 2 Dec 22.pdf | 20 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert Anand Phase 2 Sep 22.pdf | 7 Oct 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Cert Anand Phase 2 Sep 22.pdf | 7 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: Inv Update Anand Phase 2 Sep 22.pdf | 7 Oct 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Phase 2 Anand Sep 22.pdf | 7 Oct 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Anand Phase II FY 21 22.pdf | 30 Sep 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Anand Ph 2.pdf | 7 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Anand Ph 2.pdf | 7 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: Inventory Update Anand Ph 2.pdf | 7 Jul 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Anand Ph 2.pdf | 7 Jul 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Anand Ph 2 Mar 22.pdf | 7 Apr 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Cert Anand Phase 2 Mar 22.pdf | 7 Apr 2022 |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Rohan Ekam Phase 2PR1261012502532 | Balewadi, Pune | 100 | Feb 2026 | Ongoing | Mar 2030 | Not due yet |
| Rohan Ekam Phase 1P52100052298 | Balewadi, Pune | 414 | Aug 2023 | Ongoing | Dec 2027 | Not due yet |
| ROHAN VITIP52100046719 | Wakad, Pune | 93 | Sep 2022 | Ongoing | Dec 2027Registered original: Dec 2025 | Not due yet |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 27 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 131 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep ROHAN ANAND PHASE II on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SOMATANE PHATA13,700+ in Pune
Filed coordinates, straight-line distance. 59 registered projects within 2 km.
Everland
EVITA KRISALA TOWNSHIP LLP
EVERLYN
EVITA KRISALA TOWNSHIP LLP
ABHIMAAN HOMES PHASE 3
RISING PROPCON LLP
SURABHI CITY PHASE 1
Surabhi Group
ROHAN ANAND PHASE I
ROHAN BUILDERS & DEVELOPERS PRIVATE LIMITE
Urban Life Phase 1
Kakade Vtp Associates
Builder: ROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED
ROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED has 28 registrations on MahaRERA, including ROHAN KRITIKA WINGS A C and ROHAN LEHER 2 WING A. Its filings disclose 15 earlier MahaRERA projects: declares 9 of 10 past projects completed on time. Litigation is declared on 8 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if ROHAN ANAND PHASE II is delayed beyond 30 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ROHAN ANAND PHASE II?
The registered promoter entity is ROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED, a company as per the filing. Its CIN U45202PN2001PTC016352 and GSTIN 27AABCR8171R1ZL can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ROHAN ANAND PHASE II?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against ROHAN ANAND PHASE II?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for ROHAN ANAND PHASE II?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ROHAN ANAND PHASE II?
The professionals named in the filing: Architect: Ankur Associates; Architect: Ar Prakash Kulkarni; Engineer: Pratik Deepak Bhatewara; Engineer: SATISH PISE; Engineer: Mahesh Balurgi; Engineer: Jitendra Kumar Jain -. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ROHAN ANAND PHASE II?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback