Rohan Ekam Phase 1

By ROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED

RG-MH-95663 · RERA P52100052298 · Last updated on MahaRERA portal: 2 Sep 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 11 cases
  • 2 complaints at MahaRERA
  • Completion date moved by 4 months
  • 1 extension taken
  • Rs 120.00 crore secured on the land, in favour of Tata Capital Financial Services Limited

Clear

  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Apr 2028Possession promisedmoved 4 months from the original
17 of 44Construction stages doneacross 4 buildings; furthest along: Slabs of Super Structure, 85%
135 of 414Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 175 documents Report an error

Rohan Ekam Phase 1 is a Residential / Group Housing project by ROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100052298 on 9 Aug 2023. Possession is promised by 30 Apr 2028. The completion date has moved by 4 months from the original filing. 279 of the 414 units on this registration are recorded sold or booked, and 17 of 44 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameRohan Ekam Phase 1
  • TypeResidential / Group Housing
  • Location
    • Balewadi
    • Haveli
    • Pune
    • 411045
  • Pincode411045
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100052298
  • ReraGenie IDRG-MH-95663

Builder

  • NameROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED
  • Entity typeCompany
  • CINU45202PN2001PTC016352
  • GSTIN27AABCR8171R1ZL
  • DirectorsSUHAS KUSHALCHAND LUNKAD, SANJAY KUSHALCHAND LUNKAD, MILIND KUSHALCHAND LUNKAD, DEEPAK KUSHALCHAND BHATEWARA
  • Other registrations27 more →
  • Completed15 of 28
  • Declared earlier projects15 →

Key dates

this monthRegisteredAug 2023First promiseDec 2027Revised toApr 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Aug 2023
  • Promised completion30 Apr 2028
  • Revised completionRevised to 30 Apr 2028 (originally 31 Dec 2027)
  • Buildings4 building records
  • Documents filed175 files

Current status

67%279 of 414 units booked
59.1%Work done, per cost certificate

Figures as on 2 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WingNA32281320132
B WingNA32281320132
C WingNA171346046
I WingNA17131040104

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 2 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

17 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Slabs of Super Structure, at 85%.

A Wing45%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure60%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B Wing47%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C Wing50%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
I Wing39%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure30%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 2 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed763

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots763
Closed/Covered763
BuildingClosed/CoveredTotal
A Wing252252
B Wing251251
C Wing9696
I Wing164164

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area3,354 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofTata Capital Financial Services Limited
Secured amountRs 120.00 crore
Declared on30 Sep 2024
LandownerVillageDistrict
Ruturang Developers LLPPimpriPune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI71776.44
Proposed, not sanctioned63,553 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShivajinagar, Pune
Estimated costRs 251.33 cr
Cost incurredRs 148.60 cr
Work done59.12%
BuildingWingEstimatedIncurred
B WingNARs 101.67 crRs 64.78 cr
A WingNARs 67.26 crRs 42.86 cr
I WingNARs 34.23 crRs 21.31 cr
C WingNARs 27.67 crRs 18.13 cr
-NARs 20.50 crRs 1.52 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAnkur Associates
EngineerJitendra Kumar Jain
EngineerParesh Vartak
EngineerPratik Deepak Bhatewara
Chartered AccountantGolesha & Company
Chartered AccountantKhandelwal Jain & Associates
PartnerRole in project
ROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

P52100052298/WarDec 2027 → Apr 2028

Reason as filed by the promoterNA

Litigation declared11

CaseCourtStatus
1938/2022Civil Judge Sr Division PuneOngoing
564/2008Civil Judge Sr Division PuneOngoing
607/2021Civil Judge Sr Division PuneOngoing
759/2014Civil Judge Sr Division PuneOngoing
1637/2024Civil Judge Senior Division Pune at PuneOngoing
119/2025District and Session Court Pune at PuneOngoing
130/2025District and Session Court Pune at PuneOngoing
151/2025District and Session Court Pune at PuneOngoing
CRA/113/2025/2025High CourtOngoing
WP/11962/2024/2024High CourtClosed
1981/2025Civil Judge Sr Division PuneOngoing

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12501271GANPAT DHONDIBA DHENDEROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED16/04/2025
SM12600094Ram GawaliROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED23/01/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Jul 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Oct 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Oct 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2028

Documents filed175

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 175 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Rohan Ekam Phase 1.pdf2 Sep 2026
Form 5 (FY 2023-2024)File: Form 5 - Ekam Phase 1 FY 23-24.pdf25 Aug 2026
Withdrawal Update Form 1File: Rohan Ekam Phase 1.pdf20 Jul 2026
Withdrawal Update Form 2File: Rohan Ekam Phase 1.pdf20 Jul 2026
Withdrawal Update Form 3File: Rohan Ekam Phase 1.pdf20 Jul 2026
Withdrawal Update Form 1File: Rohan Ekam Phase 1.pdf20 Apr 2026
Withdrawal Update Form 2File: Rohan Ekam Phase 1.pdf20 Apr 2026
Withdrawal Update Form 3File: Rohan Ekam Phase 1.pdf20 Apr 2026
Withdrawal Update Form 1File: Rohan Ekam.pdf20 Jan 2026
Withdrawal Update Form 2File: Rohan Ekam Phase 1.pdf20 Jan 2026
Withdrawal Update Form 3File: Rohan Ekam.pdf20 Jan 2026
Withdrawal Update Form 1File: Rohan Ekam.pdf18 Oct 2025
Withdrawal Update Form 2File: Rohan Ekam.pdf18 Oct 2025
Withdrawal Update Form 3File: Rohan Ekam.pdf18 Oct 2025
Form 5 (FY 2024-2025)File: Ekam Phase 1.pdf15 Sep 2025
Form 2A (FY 2024-2025)File: Rohan Ekam.pdf24 Jul 2025
Withdrawal Update Form 1File: Rohan Ekam.pdf19 Jul 2025
Withdrawal Update Form 2File: Form 2 Ekam Phase 1 June 25.pdf19 Jul 2025
Withdrawal Update Form 3File: Rohan Ekam Phase 1.pdf19 Jul 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Rohan Ekam.pdf21 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rohan Ekam.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rohan Ekam Phase 1.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rohan Ekam Phase 1.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rohan Ekam Phase 1.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Rohan Ekam.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Ekam Phase 1 Dec 24.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Ekam Phase 1 Dec 24.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Cert Ekam Phase 1 Dec 24.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Inv Update Ekam Ph 1 Dec 24.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rohan Ekam.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ekam.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ekam P I.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: Ekam.pdf19 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Ekam Phase 1 FY 23-24.pdf9 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ekam June 24.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rohan Ekam.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Rohan Ekam.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rohan Ekam June 24.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert Rohan Ekam Phase 1 Mar 24.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Cert Rohan Ekam Ph 1 Mar 24.pdf20 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance Rohan Ekam Ph 1 Mar 24.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Inventory Update Rohan Ekam Ph 3 Mar 24.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Rohan Ekam Ph 1 Mar 24.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert Rohan Ekam Phase 1 Dec 23.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Cert Rohan Ekam Phase 1 Dec 23.pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: Inventory Update Ekam Ph 1 Dec 23.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Rohan Ekam Ph 1 Dec 23.pdf20 Jan 2024
Proforma of Agreement for saleFile: ATS Rohan Ekam Phase 1 Revised c.pdf26 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert Rohan Ekam Ph 1.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert Rohan Ekam Phase 1.pdf19 Oct 2023
Disclosure of sold/ booked inventoryFile: Inventory Update Rohan Ekam Phase 1.pdf19 Oct 2023
Layout approvalFile: 1 Revised Sanction Layout Rohan Ekam.pdf4 Oct 2023
Building plan approvalFile: 2 Ground Floor Parking Plan.pdf4 Oct 2023
Building plan approvalFile: 3 Podium 1 lvl parking plan.pdf4 Oct 2023
Building plan approvalFile: 4 Basement 2 Parking Plan.pdf4 Oct 2023
Building plan approvalFile: 5 Wing A.pdf4 Oct 2023
Building plan approvalFile: 6 Wing A.pdf4 Oct 2023
Building plan approvalFile: 7 Wing A.pdf4 Oct 2023
Building plan approvalFile: 8 Wing A.pdf4 Oct 2023
Building plan approvalFile: 9 Wing A.pdf4 Oct 2023
Building plan approvalFile: 10 Wing A.pdf4 Oct 2023
Building plan approvalFile: 11 Wing A.pdf4 Oct 2023
Building plan approvalFile: 12 Wing A.pdf4 Oct 2023
Building plan approvalFile: 13 Wing A.pdf4 Oct 2023
Building plan approvalFile: 14 Wing B.pdf4 Oct 2023
Building plan approvalFile: 15 Wing B.pdf4 Oct 2023
Building plan approvalFile: 16 Wing B.pdf4 Oct 2023
Building plan approvalFile: 17 Wing B.pdf4 Oct 2023
Building plan approvalFile: 18 Wing B.pdf4 Oct 2023
Building plan approvalFile: 19 Wing B.pdf4 Oct 2023
Building plan approvalFile: 20 Wing B.pdf4 Oct 2023
Building plan approvalFile: 21 Wing B.pdf4 Oct 2023
Building plan approvalFile: 22 Wing B.pdf4 Oct 2023
Building plan approvalFile: 23 Wing C.pdf4 Oct 2023
Building plan approvalFile: 24 Wing C.pdf4 Oct 2023
Building plan approvalFile: 25 Wing C.pdf4 Oct 2023
Building plan approvalFile: 26 Wing C.pdf4 Oct 2023
Building plan approvalFile: 27 Wing C.pdf4 Oct 2023
Building plan approvalFile: 28 Wing C.pdf4 Oct 2023
Building plan approvalFile: 29 Wing C.pdf4 Oct 2023

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Rohan Ekam Phase 2PR1261012502532Balewadi, Pune100Feb 2026OngoingMar 2030Not due yet
ROHAN VITIP52100046719Wakad, Pune93Sep 2022OngoingDec 2027Registered original: Dec 2025Not due yet
ROHAN ANAND PHASE IIP52100023451SOMATANE PHATA, Pune241Dec 2019OngoingDec 2026Registered original: Dec 2025Not due yet

How this compares with Pune

67%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 4 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Rohan Ekam Phase 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Balewadi13,700+ in Pune

2 kmRohan Ekam Phase 1Completed 120Lapsed / revoked 42Other 127Dot size: filed unitsN

Filed coordinates, straight-line distance. 289 registered projects within 2 km.

Builder: ROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED

ROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED has 28 registrations on MahaRERA, including ROHAN KRITIKA WINGS A C and ROHAN LEHER 2 WING A. Its filings disclose 15 earlier MahaRERA projects: declares 9 of 10 past projects completed on time. Litigation is declared on 8 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Rohan Ekam Phase 1 is delayed beyond 30 Apr 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Rohan Ekam Phase 1?

The registered promoter entity is ROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED, a company as per the filing. Its CIN U45202PN2001PTC016352 and GSTIN 27AABCR8171R1ZL can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Rohan Ekam Phase 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Rohan Ekam Phase 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Rohan Ekam Phase 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Rohan Ekam Phase 1?

The professionals named in the filing: Architect: Ankur Associates; Engineer: Jitendra Kumar Jain; Engineer: Paresh Vartak; Engineer: Pratik Deepak Bhatewara; Chartered Accountant: Golesha & Company; Chartered Accountant: Khandelwal Jain & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Rohan Ekam Phase 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Rohan Ekam Phase 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Rohan Ekam Phase 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.