Completed No litigation declared Residential / Group Housing project

ROHAN ANANTA PHASE I

By ROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED

RG-MH-03462 · RERA P52100019664 · Last updated on MahaRERA portal: 30 Sep 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 27 other registrations.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2024Possession promisedregistration recorded completed
40 of 44Construction stages doneacross 4 buildings; furthest along: Stilt Floor, 0%
0Complaints at MahaRERAon this registration
Jump to the 104 documents Report an error

ROHAN ANANTA PHASE I is a Residential / Group Housing project by ROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100019664 on 20 Feb 2019. The registration is recorded completed; possession was promised by 30 Mar 2024.

At a glance

Project

  • NameROHAN ANANTA PHASE I
  • TypeResidential / Group Housing
  • Location
    • Mumbai Bengaluru bypass
    • Tathawade
    • Tathwade
    • Mulshi
    • Pune
    • 411033
  • Pincode411033
  • RERA no.P52100019664
  • ReraGenie IDRG-MH-03462

Builder

  • NameROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED
  • Entity typeCompany
  • CINU45202PN2001PTC016352
  • GSTIN27AABCR8171R1ZL
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorsSUHAS KUSHALCHAND LUNKAD, SANJAY KUSHALCHAND LUNKAD, MILIND KUSHALCHAND LUNKAD, DEEPAK KUSHALCHAND BHATEWARA
  • Other registrations27 more →
  • Completed15 of 28
  • Declared earlier projects15 →

Key dates

this monthRegisteredFeb 2019PromisedMar 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on20 Feb 2019
  • Promised completion30 Mar 2024
  • Revised completionNone
  • Buildings4 building records
  • Documents filed104 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING A5NA140000
WING A6NA140000
WING A7NA140000
WING A8NA140000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 30 Sep 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

40 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Stilt Floor, at 0%.

WING A591%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING A691%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING A791%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING A891%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 30 Sep 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes50%
Street LightingYes50%
Community BuildingsYes25%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes50%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed27

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots27
Open Space27
BuildingOpen SpaceTotal
WING A577
WING A677
WING A799
WING A844

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,854 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI16282.93
Proposed, not sanctioned16,139 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAXIS BANK LTD PUNE MAIN, INDRA PUSHTI, OPP FERGUSSON COLLEGE GATE NO 2, PUNE 411004

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr Prakash Kulkarni
ArchitectAr Shashank P Phadke
PartnerRole in project
ROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED-

Litigation declared1

CaseCourtStatus
1318/2018/2018Joint CJSDSuit filed by promoter Summons to defendant

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Feb 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Oct 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Feb 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 19 May 2023

Documents filed104

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 104 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 FY 23 ANANTA PH 1.pdf30 Sep 2023
Architect’s Certificate on Completion of Project (Form 4)File: 22 Form 4 Ananta Phase 1 with OC.pdf30 Aug 2023
Other - TechnicalFile: Completion Certificate A5 to A8 Wing.pdf24 Aug 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Ananta Phase 1 OC.pdf19 May 2023
Disclosure of sold/ booked inventoryFile: Inv Update Q4 Ananta 1.pdf25 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Cert Ananta Ph 1 Q4.pdf20 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Cert Ananta Ph 1 Q4.pdf20 Apr 2023
Form 2AFile: Form 2A Q4 Ananta Ph 1.pdf20 Apr 2023
Certificates of CA (Form 3)File: CA Cert Ananta Ph 1 Q4.pdf20 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Cert Ananta 1 Dec 22.pdf20 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Cert Ananta 1 Dec 22.pdf20 Jan 2023
Disclosure of sold/ booked inventoryFile: Inv update Ananta 1 Dec 22.pdf20 Jan 2023
Certificates of CA (Form 3)File: CA Cert Ananta 1 Dec 22.pdf20 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Cert Ananta Phase 1 Sep 22.pdf7 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Cert Ananta Phase 1 Sep 22.pdf7 Oct 2022
Disclosure of sold/ booked inventoryFile: Inv Update Ananta 1 Sep 22.pdf7 Oct 2022
Certificates of CA (Form 3)File: CA Cert Ananta Phase I Sep 22.pdf7 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 1 Ananta I FY 21 22.pdf30 Sep 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Ananta Ph 1.pdf7 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Ananta Ph 1.pdf7 Jul 2022
Disclosure of sold/ booked inventoryFile: Inventory Update Ananta Ph 1.pdf7 Jul 2022
Certificates of CA (Form 3)File: Form 3 Ananta Ph 1.pdf7 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Ananta Ph 1 Mar 22.pdf7 Apr 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Cert Ananta Phase I Mar 22.pdf7 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A QA Certificate_Ananta Ph 1 Mar 22.pdf7 Apr 2022
Disclosure of sold/ booked inventoryFile: Inventory Ananta Ph 1 Mar 22.pdf7 Apr 2022
Certificates of CA (Form 3)File: Form 3 Ananta Ph 1 Mar 22.pdf7 Apr 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Cert Ananta Phase I Dec 21.pdf7 Jan 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Ananta I Dec21.pdf7 Jan 2022
Disclosure of sold/ booked inventoryFile: Ananta I Dec 21.pdf7 Jan 2022
Certificates of CA (Form 3)File: CA Rohan Ananta I Dec2021.pdf7 Jan 2022
Layout approvalFile: Revised sanction Ananta.pdf7 Oct 2021
Copy of Layout Approval (in case of layout)File: Revised sanction Ananta.pdf7 Oct 2021
Commencement Certificates / NA Order for plotted developmentFile: Revised CC Ananta.pdf7 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ananta Phase I Sept 21.pdf7 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Ananta Phase I Engg Sep 21.pdf7 Oct 2021
Form 2AFile: Ananta Phase I 2A - Sep 21.pdf7 Oct 2021
Disclosure of sold/ booked inventoryFile: Ananta I Inventory Update - Sep 21.pdf7 Oct 2021
Certificates of CA (Form 3)File: Ananta Phase I CA Cert Sep 21.pdf7 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Ananta Phase I Form 5.pdf30 Sep 2021
Details of encumbrancesFile: Index II ananta mortgage_ABFL.pdf29 Sep 2021
Details of encumbrancesFile: Ananta ABFL Mortgage.pdf29 Sep 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Rohan Ananta- Phase I Architect Cert June 21.pdf14 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Cert Ananta I June 21.pdf14 Aug 2021
Form 2AFile: Ananta I 2A Cert June 21.pdf14 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2A Ananta Phase I Mar 21.pdf14 Aug 2021
Disclosure of sold/ booked inventoryFile: Inventory Update Ananta Phase I June 21.pdf14 Aug 2021
Certificates of CA (Form 3)File: CA Cert Ananta I June 21.pdf14 Aug 2021
Layout approvalFile: Revised Plan Ananta July 21.pdf5 Aug 2021
Copy of Layout Approval (in case of layout)File: Revised Plan Ananta July 21.pdf5 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: Revised CC Ananta July 21.pdf5 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Ananta Phase I Mar 21.pdf1 Jul 2021
Form 2AFile: 2A Ananta Phase I Mar 21.pdf1 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ananta- Phase I.pdf30 Jun 2021
Certificates of CA (Form 3)File: CA Ananta I Mar 21.pdf30 Jun 2021
Disclosure of sold/ booked inventoryFile: Ananta I Sold Mar 21.pdf7 Jun 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ANANTA PHASE I Engg Cert DEC 20.pdf31 Mar 2021
Certificates of CA (Form 3)File: ANANTA PHASE 1 CA certificate DEC 2020 RotatePdf.pdf31 Mar 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ananta Phase I Dec 2020.pdf16 Feb 2021
Form 2AFile: 2A Rohan Ananta Phase I Dec 20.pdf16 Feb 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Ananta Phase I Engg Cert - Sep 20.pdf17 Dec 2020
Form 2AFile: 2A ANANTA PHASE I Sep 20.pdf17 Dec 2020
Certificates of CA (Form 3)File: ANANTA PHASE I CA CERT - SEP 20.pdf17 Dec 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Cert Ananta Phase I June 20.pdf3 Nov 2020
Certificates of CA (Form 3)File: CA Cert Ananta Phase I June 20.pdf3 Nov 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Ananta Phase I.pdf29 Oct 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Cert ANT PHASE I June 20.pdf16 Oct 2020
Form 2AFile: 2A Ananta Phase I June 20.pdf16 Oct 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Cert Ananta Phase I Mar 20.pdf17 Aug 2020
Form 2AFile: Engg 2A Ananta I Mar 20.pdf17 Aug 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Cert Ananta I Mar 20.pdf14 Aug 2020
Certificates of CA (Form 3)File: CA Cert Ananta I Mar 20.pdf14 Aug 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Cert Ananta I Dec 19.pdf28 Feb 2020
Certificates of CA (Form 3)File: CA Cert ANANTA I DEC 19.pdf28 Feb 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Rohan Ananta I DEC 19.pdf17 Feb 2020
Form 2AFile: 2A Ananta I DEC 19.pdf17 Feb 2020
Layout approvalFile: Revised Sactioned Plan Ananta.pdf12 Feb 2020
Copy of Layout Approval (in case of layout)File: Revised Sactioned Plan Ananta.pdf12 Feb 2020
Commencement Certificates / NA Order for plotted developmentFile: Revised CC - Ananta.pdf12 Feb 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Cert Ananta I Sep 19.pdf27 Nov 2019

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Rohan Ekam Phase 2PR1261012502532Balewadi, Pune100Feb 2026OngoingMar 2030Not due yet
Rohan Ekam Phase 1P52100052298Balewadi, Pune414Aug 2023OngoingDec 2027Not due yet
ROHAN VITIP52100046719Wakad, Pune93Sep 2022OngoingDec 2027Registered original: Dec 2025Not due yet
ROHAN ANAND PHASE IIP52100023451SOMATANE PHATA, Pune241Dec 2019OngoingDec 2026Registered original: Dec 2025Not due yet

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ROHAN ANANTA PHASE I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Tathawade13,700+ in Pune

Builder: ROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED

ROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED has 28 registrations on MahaRERA, including ROHAN KRITIKA WINGS A C and ROHAN LEHER 2 WING A. Its filings disclose 15 earlier MahaRERA projects: declares 9 of 10 past projects completed on time. Litigation is declared on 8 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if ROHAN ANANTA PHASE I is delayed beyond 30 Mar 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ROHAN ANANTA PHASE I?

The registered promoter entity is ROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED, a company as per the filing. Its CIN U45202PN2001PTC016352 and GSTIN 27AABCR8171R1ZL can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ROHAN ANANTA PHASE I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ROHAN ANANTA PHASE I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ROHAN ANANTA PHASE I?

The professionals named in the filing: Architect: Ar Prakash Kulkarni; Architect: Ar Shashank P Phadke. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ROHAN ANANTA PHASE I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ROHAN ANANTA PHASE I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ROHAN ANANTA PHASE I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.