Completed No litigation declared Others project

ROCKY RESIDENCY

By AJINKYA CONSTRUCTION

RG-MH-52094 · RERA P52900030417 · Last updated on MahaRERA portal: 2 May 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 3 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 7 other registrations.

See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.
Jul 2025Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 62 documents Report an error

ROCKY RESIDENCY is a Others project by AJINKYA CONSTRUCTION in Sindhudurg, Maharashtra, registered with MahaRERA as P52900030417 on 25 Aug 2021. The registration is recorded completed; possession was promised by 31 Jul 2025.

At a glance

Project

  • NameROCKY RESIDENCY
  • TypeOthers
  • Location
    • CHARATHA ROAD
    • CHARATHA MUNICIPAL LIMITS
    • Sawantwadi (M Cl)
    • Sawantwadi
    • Sindhudurg
    • 416510
  • Pincode416510
  • RERA no.P52900030417
  • ReraGenie IDRG-MH-52094

Builder

  • NameAJINKYA CONSTRUCTION
  • Entity typePartnership
  • GSTIN27ABAFA2966N1Z4
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnerMRS BHAGYALAXMI SANJAY SAWANT
  • Other registrations7 more →
  • Completed6 of 8
  • Declared earlier projects3 →

Key dates

this monthRegisteredAug 2021PromisedJul 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on25 Aug 2021
  • Promised completion31 Jul 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed62 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ROCKY RESIDENCYNA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 2 May 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

ROCKY RESIDENCY: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 2 May 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed2

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2
Closed/Covered1
Open Space1

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area555 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
AJINKYA CONSTRUCTIONSawantwadi (M Cl)Sindhudurg

Approvals and building plan

Permissible FSI1591.38
Proposed, not sanctioned1,591 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGALA NO 64-69, RAMESHWAR PLAZA, SAWANTWADI

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVIJAY NEPOLEAN KAMAT
EngineerVIJAY NEPOLEAN KAMAT
Chartered AccountantCA NAIK AND ASSOCIATESA SUDHIR
PartnerRole in project
AJINKYA CONSTRUCTION-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Aug 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Aug 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Aug 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 20 Apr 2024

Documents filed62

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf2 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 ROCKY RESIDENCY.pdf2 May 2024
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 ARCH CERT.pdf2 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A.pdf27 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 ROCKY RESIDENCY.pdf27 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 ROCKY RESIDENCY.pdf27 Apr 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: SOCIETY REGISTRATION CERT.pdf27 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM NO 2A.pdf20 Apr 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: COMPLETION - OC.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf13 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf13 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf13 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf13 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf13 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf13 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf13 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf13 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf13 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf13 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf13 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf13 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf13 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf13 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf13 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf13 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf13 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf13 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5.pdf15 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A ROCKY.pdf6 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_.pdf8 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_.pdf8 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_.pdf8 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_.pdf8 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_.pdf8 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_.pdf8 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_.pdf8 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_.pdf8 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_.pdf8 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTFICATE 1_.pdf19 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTFICATE 1_.pdf19 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTFICATE 2_.pdf19 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTFICATE 2_.pdf19 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTFICATE 3_.pdf19 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTFICATE 3_.pdf19 Jul 2022
Details of encumbrancesFile: NIL ENCUMBRANCES001.pdf10 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: NA ORDER - SANAD.pdf10 Aug 2021
Proforma of Allotment letterFile: AGREEMENT FOR SALE - FLAT ALLOTMENT.pdf10 Aug 2021
Declaration about Commencement CertificateFile: COMMENCEMENT CERTIFICATE DECLARATION.pdf9 Aug 2021
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF BOOKED NVENTORY.pdf9 Aug 2021
OtherFile: POA Rocky.pdf9 Aug 2021
OtherFile: DEVP AGREEMENT.pdf9 Aug 2021
Building plan approvalFile: ROCKY PLAN.pdf8 Aug 2021
Layout approvalFile: LAYOUT PLAN.pdf8 Aug 2021
PAN CardFile: PAN OF FIRM.pdf8 Aug 2021
Copy of the legal title reportFile: SEARCH REPORT_11zon.pdf8 Aug 2021
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN.pdf8 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: ROCKY PLAN.pdf8 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: MUNICIPAL PERMISSION AND COMMENCEMENT CERTIFICATE_11zon.pdf8 Aug 2021
Declaration in FORM BFile: Form B.pdf8 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT FORM 1.pdf8 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ARCHITECT FORM 2.pdf8 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CHARTERED ACCOUNTANT FORM 3 (2).pdf8 Aug 2021

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
AJINKYA ROYALP52900015368SABNISWADA, Sindhudurg-Feb 2018CompletedFeb 2022May 2020
KANCHANGANGA RESIDENCYJUSTIN NAGAR NEAR SHILPAGRAM SAWANTWADI21-CompletedDec 2017Jul 2017
BHAGYALAXMI EMPIRELAXMI NAGAR NEAR SHILPAGRAM BEHIND JAIL SAWANTWADI68-CompletedDec 2016May 2016

How this compares with Sindhudurg

21%of Sindhudurg projects moved their completion datethis one has not
30%of Sindhudurg registrations have lapsed or been cancelledthis one is completed

Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.

Keep ROCKY RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHARATHA MUNICIPAL LIMITS530+ in Sindhudurg

Builder: AJINKYA CONSTRUCTION

AJINKYA CONSTRUCTION has 8 registrations on MahaRERA, including AJINKYA ROYAL and SADANAND PLAZA. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Sindhudurg district page.

Frequently asked questions

What are my rights if ROCKY RESIDENCY is delayed beyond 31 Jul 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ROCKY RESIDENCY?

The registered promoter entity is AJINKYA CONSTRUCTION, a partnership as per the filing. Its GSTIN 27ABAFA2966N1Z4 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ROCKY RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ROCKY RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ROCKY RESIDENCY?

The professionals named in the filing: Architect: VIJAY NEPOLEAN KAMAT; Engineer: VIJAY NEPOLEAN KAMAT; Chartered Accountant: CA NAIK AND ASSOCIATESA SUDHIR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ROCKY RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ROCKY RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ROCKY RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.