ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / Riverwood Park Building No. 4

Completed No litigation declared Residential / Group Housing project

Riverwood Park Building No. 4

By Shree Khidkaleshwar Property Developers Pvt. Ltd.

RG-MH-19762 · RERA P51700004003 · Last updated on MahaRERA portal: 3 Aug 2023

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Oct 2023Possession promisedregistration recorded completed
6 of 11Construction stages donefurthest along: Internal walls, 95%
0Complaints at MahaRERAon this registration
Jump to the 101 documents Report an error

Riverwood Park Building No. 4 is a Residential / Group Housing project by Shree Khidkaleshwar Property Developers Pvt. Ltd. in Thane, Maharashtra, registered with MahaRERA as P51700004003 on 7 Aug 2017. The registration is recorded completed; possession was promised by 30 Oct 2023. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameRiverwood Park Building No. 4
  • TypeResidential / Group Housing
  • Location
    • Kalyan Shill Road
    • Dombivali East
    • Thane (M Corp.)
    • Thane
    • 421204
  • Pincode421204
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700004003
  • ReraGenie IDRG-MH-19762

Builder

  • NameShree Khidkaleshwar Property Developers Pvt. Ltd.
  • Entity typeCompany
  • CINU45400MH2014PTC254482
  • GSTIN27AAUCS4319K1ZP
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Managing DirectorBharat Shah
  • Other registrations4 more →
  • Completed3 of 5

Key dates

this monthRegisteredAug 2017First promiseOct 2022Revised toOct 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on7 Aug 2017
  • Promised completion30 Oct 2023
  • Revised completionRevised to 30 Oct 2023 (originally 30 Oct 2022)
  • Buildings1 building record
  • Documents filed101 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building No 4NA290000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Aug 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

Building No 4: 94% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities17

As on 3 Aug 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes0%
Street LightingYes50%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes95%
Electrical meter room, sub-station, receiving stationYes95%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
Club House and Swimming poolYes30%
NANoNot applicable

Parking filed110

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots110
Closed/Covered110

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,558 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI8416.16
Proposed, not sanctioned8,416 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSamachar MArg Fort Mumbai

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMS Vasturachana
EngineerMS Epicon Consultant Pvt Ltd
PartnerRole in project
Shree Khidkaleshwar Property Developers Pvt. Ltd.-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700012768Oct 2022 → Oct 2023

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 6 in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Aug 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Aug 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 1 Aug 2023

Documents filed101

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 101 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Completion Form-4 (Building No-4).pdf3 Aug 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC buliding u3 no2 and building u5 no 4.pdf1 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech Certificate March 2023 Building No 4_0001.pdf13 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate March 2023 Bldg 4.pdf13 Jun 2023
Form 2AFile: Form 2A March 2023 Bldg 4.pdf13 Jun 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold List.pdf13 Jun 2023
Certificates of CA (Form 3)File: CA Certificate mARCH 23 bLDG 4.pdf13 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf3 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Bldg No 4.pdf3 Apr 2023
Form 2AFile: Quality Assurance Certificate Building 4.pdf3 Apr 2023
Certificates of CA (Form 3)File: CA Certificate.pdf3 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: CA Form 5 bldg 4 2021 22.pdf16 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Riverwood Park Building No 4 as on March 2018.pdf2 Feb 2023
Certificates of CA (Form 5)File: CA Form 5 bldg 4 2021 22.pdf1 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Bldg 4 2018 2019.pdf1 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Bldg 4 2019 2020.pdf1 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 bldg 4 2020 2021.pdf1 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Bldg No 4 Sep 22.pdf20 Jan 2023
Form 2AFile: Quality Assurance Certificate Bldg No 4 Sep 22.pdf20 Jan 2023
Certificates of CA (Form 3)File: CA Certificate sept 22 bldg 4.pdf13 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Building 4 June 2022.pdf5 Jan 2023
Form 2AFile: Quality Assurance Certificate Building 4 June 2022.pdf5 Jan 2023
Certificates of CA (Form 3)File: CA Certificate June 2022 Bldg 4.pdf5 Jan 2023
Details of encumbrancesFile: Encumbrances Letter_0001.pdf24 Nov 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate March 22 bldg 4.pdf9 Nov 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate June 22 Bldg 4.pdf9 Nov 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Sept 22 Bldg 4.pdf9 Nov 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate March 22 bldg 4.pdf9 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance Certificate march 22 bldg 4.pdf9 Nov 2022
Certificates of CA (Form 3)File: CA Certificate MARCH 22.pdf22 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Bldg 2.pdf19 May 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Architect Cerificate DEC 21.pdf19 May 2022
Form 2AFile: QA Certificate Bldg 2.pdf19 May 2022
Form 2AFile: QA Certificate Bldg 4.pdf19 May 2022
Certificates of CA (Form 3)File: CA Certificate.pdf19 May 2022
Certificates of CA (Form 3)File: CA Certificate.pdf19 May 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Cerificate DEC 21.pdf14 Mar 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE.pdf31 Dec 2021
Disclosure of sold/ booked inventoryFile: Sold Inventory Sept 21.pdf31 Dec 2021
Certificates of CA (Form 5)File: Form 5 Bldg 4.pdf31 Dec 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificates_0001.pdf30 Dec 2021
Form 2AFile: Engineers Certificates Dor Quality Assurance_0001.pdf30 Dec 2021
Certificates of CA (Form 3)File: CA Certificate sept 2021.pdf30 Dec 2021
Layout approvalFile: layout.pdf14 Aug 2021
Building plan approvalFile: Building No 4 24th Floor Plan.pdf14 Aug 2021
Building plan approvalFile: Building No 4 Podium floor plan.pdf14 Aug 2021
Building plan approvalFile: Building No 4 Section Plan.pdf14 Aug 2021
Building plan approvalFile: Building No 4 building section.pdf14 Aug 2021
Building plan approvalFile: Building No 4 Typical and Refuje.pdf14 Aug 2021
Copy of Layout Approval (in case of layout)File: layout.pdf14 Aug 2021
Building Plan Approval (IOD)File: Building No 4 24th Floor Plan.pdf14 Aug 2021
Building Plan Approval (IOD)File: Building No 4 Podium floor plan.pdf14 Aug 2021
Building Plan Approval (IOD)File: Building No 4 Section Plan.pdf14 Aug 2021
Building Plan Approval (IOD)File: Building No 4 building section.pdf14 Aug 2021
Building Plan Approval (IOD)File: Building No 4 Typical and Refuje.pdf14 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: CC 21 07 2021.pdf14 Aug 2021
Declaration about Commencement CertificateFile: FORM 2 Engineers Certificate Bldg No 4 March 2021.pdf14 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architact Certificate Bld No 4 March 2021.pdf14 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architact Certificate June 2021.pdf14 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 Engineers Certificate Bldg No 4 June 2021.pdf14 Aug 2021
Form 2AFile: Form 2A Quality assurance Certificate Building 4 March 2021.pdf14 Aug 2021
Form 2AFile: Form 2A Quality assurance Certificate Building No 4 June2021.pdf14 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Quality assurance Certificate Building 4 March 2021.pdf14 Aug 2021
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventary Bldg No 4 June 2021.pdf14 Aug 2021
Certificates of CA (Form 3)File: CA FORM 3 MARCH 21 BLDG NO 4.pdf14 Aug 2021
Certificates of CA (Form 3)File: CA FORM 3 JUNE 21 BLDG NO 4.pdf14 Aug 2021
Certificates of CA (Form 3)File: Form 3 CA certificate Dec 2020.pdf21 May 2021
PAN CardFile: SKPDPL Pan Card.pdf14 May 2021
Commencement Certificates / NA Order for plotted developmentFile: CC 19 to 24 floors.pdf14 May 2021
Certificates of CA (Form 5)File: Form 5 March 2020.pdf14 May 2021
Proforma of Allotment letterFile: Riverwood Park RERA Agreement Building No 4.pdf14 May 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate-.pdf29 Oct 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Certificate Bldg No 4 June 2020.pdf29 Oct 2020
Form 2AFile: Form 2A Quality Assurance Certificate Bldg No 4 June 2020.pdf29 Oct 2020
Certificates of CA (Form 3)File: CA Certificate June 2020.pdf29 Oct 2020
Certificates of CA (Form 5)File: CA Form 5 September 2019.pdf26 Dec 2019
Certificates of CA (Form 3)File: FORM 3 CA CERTIFICATE BLDG NO 4 2.pdf23 Dec 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Bldg 4.pdf7 Aug 2019
Certificates of CA (Form 3)File: CA Certificate Building No4 June19.pdf7 Aug 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Small SizeEngineer Certificate March 19 Building No 04.pdf13 Jun 2019

How this compares with Thane

24%of Thane projects moved their completion datethis one moved by 12 months
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Riverwood Park Building No. 4 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dombivali East7,600+ in Thane

2 kmRiverwood Park Building Completed 26Lapsed / revoked 9Other 30Dot size: filed unitsN

Filed coordinates, straight-line distance. 65 registered projects within 2 km.

Builder: Shree Khidkaleshwar Property Developers Pvt. Ltd.

Shree Khidkaleshwar Property Developers Pvt. Ltd. has 5 registrations on MahaRERA, including Riverwood Park Building No. 2 and Riverwood Park Building No. 4. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Riverwood Park Building No. 4 is delayed beyond 30 Oct 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Riverwood Park Building No. 4?

The registered promoter entity is Shree Khidkaleshwar Property Developers Pvt. Ltd., a company as per the filing. Its CIN U45400MH2014PTC254482 and GSTIN 27AAUCS4319K1ZP can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Riverwood Park Building No. 4?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Riverwood Park Building No. 4?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Riverwood Park Building No. 4?

The professionals named in the filing: Architect: MS Vasturachana; Engineer: MS Epicon Consultant Pvt Ltd. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Riverwood Park Building No. 4?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Riverwood Park Building No. 4. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Riverwood Park Building No. 4 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.