Riverwood Park Building No -3
By Shree Khidkaleshwar Property Developers Pvt. Ltd.
RG-MH-30341 · RERA P51700030195 · Last updated on MahaRERA portal: 5 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Riverwood Park Building No -3 is a Residential / Group Housing project by Shree Khidkaleshwar Property Developers Pvt. Ltd. in Thane, Maharashtra, registered with MahaRERA as P51700030195 on 5 Aug 2021. Possession is promised by 30 Jun 2027. The completion date has moved by 12 months from the original filing. 140 of the 159 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameRiverwood Park Building No -3
- TypeResidential / Group Housing
- Location
- Kalyan Shill Road
- Sagarli
- Dombivili East
- Thane (M Corp.)
- Thane
- 421204
- Pincode421204
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700030195
- ReraGenie IDRG-MH-30341
Builder
- NameShree Khidkaleshwar Property Developers Pvt. Ltd.
- Entity typeCompany
- CINU45400MH2014PTC254482
- GSTIN27AAUCS4319K1ZP
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- Managing DirectorBharat Shah
- Other registrations4 more →
- Completed3 of 5
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on5 Aug 2021
- Promised completion30 Jun 2027
- Revised completionRevised to 30 Jun 2027 (originally 30 Jun 2026)
- Buildings1 building record
- Documents filed96 files
Current status
Figures as on 5 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Riverwood Park Building No -3 | NA | 28 | 24 | 159 | 0 | 159 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 5 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 95%.
Riverwood Park Building No -3: 83% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 95% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 25% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 5 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 40% |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 30% |
| Storm Water Drains | Yes | 30% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 20% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 50% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 35% |
| Electrical meter room, sub-station, receiving station | Yes | 20% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed100
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Riverwood Park Building No -3 | NA | Rs 39.45 cr | Rs 31.88 cr |
| - | NA | Rs 2.08 cr | Rs 54.30 lakh |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Vasturachna |
| Engineer | SK Consultants & Engineers |
| Engineer | Harish Vispute |
| Chartered Accountant | NB Sayed & Associates |
| Chartered Accountant | Vinod Patil & Associates |
| Partner | Role in project |
|---|---|
| Shree Khidkaleshwar Property Developers Pvt. Ltd. | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe hereby apply for extension under Section 6 of the Real Estate (Regulation and Development) Act, 2016. The primary reason for the delay in completion of the project has arisen due to compounding factors beyond our control, starting with post-pandemic labor and supply chain shortages following the project's registration on 05/08/2021. This momentum was further impacted by the unsatisfactory performance and eventual termination of our initial primary contractor in 2023, which caused significant transition delays and temporary cash flow issues. This financial strain was further compounded by Mi
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12604783 | Seshan Iyer | Shree Khidkaleshwar Property Developers Pvt. Ltd. | 29/07/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 24 Jul 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 23 Jul 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 24 Jul 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 23 Jul 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Jun 2027
Documents filed96
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 96 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 - Riverwood Park Building No -3 Q1 2026.pdf | 5 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 - Riverwood Park Building No -3 Q1 2026.pdf | 5 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 - Riverwood Park Building No -3 Q1 2026.pdf | 5 Aug 2026 |
| Form 5 (FY 2024-2025)File: Form 5 - Riverwood Park Building No 3 for FY 2024-25.pdf | 16 Jun 2026 |
| Form 2A (FY 2021-2022)File: Form 2A Riverwood Park Building No 3 For 2021-22.pdf | 15 Jun 2026 |
| Form 2A (FY 2022-2023)File: Form 2A Riverwood Park Building No 3 For 2022-23.pdf | 15 Jun 2026 |
| Form 2A (FY 2023-2024)File: Form 2A Riverwood Park Building No 3 For 2023-24.pdf | 15 Jun 2026 |
| Form 2A (FY 2024-2025)File: Form 2A Riverwood Park Building No 3 For 2024-25.pdf | 15 Jun 2026 |
| Form 2A (FY 2025-2026)File: Form-2A 2025-2026.pdf | 12 Jun 2026 |
| Withdrawal Update Form 1File: Architect Certificate Form 1.pdf | 10 Jun 2026 |
| Withdrawal Update Form 2File: Engineers Certificate_0002.pdf | 10 Jun 2026 |
| Withdrawal Update Form 3File: CA Certificate Riverwood building park 3.pdf | 10 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 - Riverwood Park Building No - 3 as on Sep 2025.pdf | 18 May 2026 |
| Withdrawal Update Form 1File: Form 1 - Riverwood Park Building No - 3 as on Sep 2025.pdf | 18 May 2026 |
| Withdrawal Update Form 1File: Form 1 - Riverwood Park Building No - 3 as on Dec 2025.pdf | 18 May 2026 |
| Withdrawal Update Form 2File: Form 2 - Riverwood Park Building No - 3 as on Sep 2025.pdf | 18 May 2026 |
| Withdrawal Update Form 2File: Form 2 - Riverwood Park Building No - 3 as on Sep 2025.pdf | 18 May 2026 |
| Withdrawal Update Form 2File: Form 2 - Riverwood Park Building No - 3 as on Dec 2025.pdf | 18 May 2026 |
| Withdrawal Update Form 3File: Form 3 Riverwood Park Building No3 as on june 2025.pdf | 18 May 2026 |
| Withdrawal Update Form 3File: Form 3 - Riverwood Park Building No - 3 as on Sep 2025.pdf | 18 May 2026 |
| Withdrawal Update Form 3File: Form 3 - Riverwood Park Building No - 3 as on Dec 2025.pdf | 18 May 2026 |
| Form 5 (FY 2023-2024)File: Form 5 - Riverwood Park Building No 3 for FY 2023-24.pdf | 1 Oct 2025 |
| Form 1File: Form 1-Riverwood Park Blgd no-3 as on March 2025.pdf | 11 Sep 2025 |
| Form 2File: Form 2 - Riverwood Park Building No 3 as on March 2025.pdf | 11 Sep 2025 |
| Form 3File: Form 3 - Riverwood Park Building No 3 as on March 2025.pdf | 11 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Riverwood Park Building No 3 as on March 2025.pdf | 11 Sep 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Riverwood Park Building No 3 as on Dec 2024.pdf | 24 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Riverwood Park Building No 3 as on Dec 2024.pdf | 24 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 11 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 15 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 16 CA Certificate on Project Cost Fund withdrawal (Form 3).pdf | 15 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 14 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 15 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sept 2024.pdf | 4 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Riverwood Park Building No 3 as on Sep 2024.pdf | 3 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Riverwood Park Building No 3 as on Sep 2024.pdf | 3 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Riverwood Park Building No 3 as on 30-06-2024.pdf | 11 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Riverwood Park Building No 3 as on June 2024.pdf | 11 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 9 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 16 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 11 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 16 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 13 CA Certificate on Project Cost Fund withdrawal (Form 3).pdf | 16 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Riverwood Park Building No 3 as on March 2024.pdf | 20 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Riverwood Park Building No 3 as on March 2024.pdf | 7 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Riverwood Park Building No 3 as on March 2024.pdf | 7 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 March 2023.pdf | 18 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: For 1 Architect Certificate Bldg 3 Dec 2023_17414331.pdf | 4 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Riverwood Park Building No 3 as on Dec 2023.pdf | 4 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Riverwood Park Building No 3 as on Dec 2023.pdf | 4 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Riverwood Park Building No 3 as on Sept 2023.pdf | 20 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Riverwood Park Building No 3 as on June 2023.pdf | 20 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Riverwood Park Building No 3 as on Sep 2023.pdf | 20 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Riverwood Park Building No 3 as on Sep 2023.pdf | 20 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Riverwood Park Building No 3 as on 30-06-2023.pdf | 21 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Building 3.pdf | 13 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Riverwood Park Building No 3 as on 31-03-2023.pdf | 20 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Riverwood Park Building No 3 as on 31-03-2023.pdf | 20 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Riverwood Park Building No 3.pdf | 14 Jun 2023 |
| Disclosure of sold/ booked inventoryFile: Circular 29- Riverwood Building No 3.pdf | 14 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Riverwood Park Building No 3.pdf | 7 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Riverwood Park Building No 3 Dec 22 - Form 2.pdf | 3 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Riverwood Park Building No 3 as on December 2022.pdf | 3 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Building No 3-2021 2022.pdf | 16 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Riverwood Park Building No 3- Form 2 June 2022.pdf | 7 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Riverwood Park Building No 3- Form 2 September 2022.pdf | 7 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Riverwood Park Building No 3 as on June 2022.pdf | 7 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Riverwood Park Building No 3- Form 2 September 2022.pdf | 7 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Riverwood Park Building No 3 as on September 2022.pdf | 7 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Riverwood Park Building No 3 as on June 2022.pdf | 19 Dec 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Riverwood Park Building No 3 as on September 2022.pdf | 19 Dec 2022 |
| Details of encumbrancesFile: Encumbrances Letter_0001.pdf | 24 Nov 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Riverwood Park Building No 3- Form 2 March 2022.pdf | 21 Oct 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Riverwood Park Building No 3- Form 2 March 2022.pdf | 21 Oct 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Riverwood Park Building No 3- Form 2 March 2022.pdf | 21 Oct 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Riverwood Park Building No 3_March 22.pdf | 21 Oct 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Riverwood Park Building No 3- Form 2.pdf | 19 May 2022 |
| CERSAI detailsFile: Riverwood Park Building 3.pdf | 19 May 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Riverwood Park Building No- 3_Dec-21 pdf_11zon.pdf | 19 May 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate dec 2021.pdf | 14 Mar 2022 |
| Disclosure of sold/ booked inventoryFile: Sold and unsold inventory dec 2021.pdf | 14 Mar 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3 Riverwood Park Building No 3.pdf | 31 Jul 2021 |
| Building plan approvalFile: Building 2 and 3 section_rotated.pdf | 24 Jul 2021 |
| Building plan approvalFile: Building 2 And 3 Refuge.pdf | 24 Jul 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 4 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 96 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Riverwood Park Building No -3 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Sagarli, Dombivili East7,600+ in Thane
Filed coordinates, straight-line distance. 64 registered projects within 2 km.
Constrcution of 2557 EWS tenements at S.No.157
ARUN SHANKARRAO BORGAVE
Runwal Gardens Phase I
Runwal Residency Private Limited
Runwal Garden City Cluster 6 Tower 6 to 9
HORIZON PROJECTS PVT LTD
Runwal Gardens Phase 6A Bldg No. 53-54
Runwal Residency Private Limited
RGC Runwal My City EWS - LIG Building
HORIZON PROJECTS PVT LTD
BALAJI ESTATE PHASE 2
M/S SAI BALAJI BUILDCON
See every Thane project, with the district possession charts
Builder: Shree Khidkaleshwar Property Developers Pvt. Ltd.
Shree Khidkaleshwar Property Developers Pvt. Ltd. has 5 registrations on MahaRERA, including Riverwood Park Building No. 2 and Riverwood Park Building No. 4. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if Riverwood Park Building No -3 is delayed beyond 30 Jun 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Riverwood Park Building No -3?
The registered promoter entity is Shree Khidkaleshwar Property Developers Pvt. Ltd., a company as per the filing. Its CIN U45400MH2014PTC254482 and GSTIN 27AAUCS4319K1ZP can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Riverwood Park Building No -3?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Riverwood Park Building No -3?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Riverwood Park Building No -3?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Riverwood Park Building No -3?
The professionals named in the filing: Architect: Vasturachna; Engineer: SK Consultants & Engineers; Engineer: Harish Vispute; Chartered Accountant: NB Sayed & Associates; Chartered Accountant: Vinod Patil & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Riverwood Park Building No -3?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback