Registration lapsed Litigation declared Residential / Group Housing project

Riverdale Grove

By Duville Estates Private Limited

RG-MH-17496 · RERA P52100029023 · Last updated on MahaRERA portal: 8 Oct 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 4 months past the filed date
  • Litigation declared, 5 cases
  • 7 complaints at MahaRERA

Clear

  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Jun 2026Possession promised4 months past this date
12 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 71%
7Complaints at MahaRERAon this registration
Jump to the 220 documents Report an error

Riverdale Grove is a Residential / Group Housing project by Duville Estates Private Limited in Kharadi, 411014, registered with MahaRERA as P52100029023 on 23 Apr 2021. Possession was promised by 30 Jun 2026 and is now 4 months past that date. 7 complaints are on record with the regulator.

At a glance

Project

  • NameRiverdale Grove
  • TypeResidential / Group Housing
  • Location
    • Off Nagar Road
    • Kharadi
    • 411014
  • Pincode411014
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100029023
  • ReraGenie IDRG-MH-17496

Builder

  • NameDuville Estates Private Limited
  • Entity typeCompany
  • GSTIN27AACCC8436BIZW
  • DirectorTushad Behram Dubash
  • Other registrations7 more →
  • Completed4 of 8
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

4 months past promisethis monthRegisteredApr 2021PromisedJun 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on23 Apr 2021
  • Promised completion30 Jun 2026
  • Revised completionNone
  • Buildings3 building records
  • Documents filed220 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B6NA3328000
B7NA3328000
B8NA3328000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 8 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 71%.

B651%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure71%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B751%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure67%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises24%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks65%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B850%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure64%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises21%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 8 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes55%
Water SupplyYes5%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes75%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes25%
Street LightingYes25%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes25%
Water conservation /Rain water harvestingYes50%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes15%
Electrical meter room, sub-station, receiving stationYes20%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed522

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots522
Closed/Covered522
BuildingClosed/CoveredTotal
B6174174
B7174174
B8174174

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area9,073 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI51447.23
Proposed, not sanctioned35,480 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFort Mumbai

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPinnac AECL consultancy PvtLtd
EngineerJ W Consultants
Chartered AccountantRabadia & Vekaria
PartnerRole in project
Duville Estates Private Limited-

Litigation declared5

CaseCourtStatus
1774/2015/2015Court of Civil Judge Senior Division PuneDismissed by Honble District and Sessions Court Pune
226/2015/2015Court of Civil Judge Senior Division PunePending
597/2015/2015Court of Civil Judge Sr Division PunePending
48/2016/2016Pune Civil CourtPending
48/2016Pune Civil CourtOngoing

Complaints filed with MahaRERA7

Case no.ComplainantRespondentFiled
CC12400656SATYAJIT BHUYANDuville Estates Private Limited05/11/2024
CC12502378Nikhil WadaskarDuville Estates Private Limited13/07/2025
CC12601422Alok JainDuville Estates Private Limited14/03/2026
CC12602791Ramdas Narsing DeokarDuville Estates Private Limited13/05/2026
CC12603248Rohit Dhananjay PandeDuville Estates Private Limited30/05/2026
CC12603563Jayant Arun ChaudhariDuville Estates Private Limited09/06/2026
CC12603447Ankur Satishkumar JoshiDuville Estates Private Limited04/06/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Apr 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Dec 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Dec 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed220

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 220 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Grove Form 1 June24.pdf8 Oct 2025
Form 2File: Grove Form 2 June 2024.pdf8 Oct 2025
Form 3File: Form 3 Grove June 2024.pdf8 Oct 2025
Disclosure of Sold and Booked InventoryFile: Grove Sales Data June 2024.pdf8 Oct 2025
Form 1File: Riverdale Grove Form 1 March 2024.pdf8 Oct 2025
Form 2File: Form 2 Grove March 2024.pdf8 Oct 2025
Form 3File: Form 3 Grove March 2024.pdf8 Oct 2025
Disclosure of Sold and Booked InventoryFile: Grove March 2024 sales data.pdf8 Oct 2025
Form 1File: Grove - Form 1 Dec 2023.pdf8 Oct 2025
Form 2File: Form 2 - Riverdale Grove - Dec 2023.pdf8 Oct 2025
Form 3File: Form-3 - Riverdale Grove - Dec 2023.pdf8 Oct 2025
Disclosure of Sold and Booked InventoryFile: Grove Sales Data Dec 2023.pdf8 Oct 2025
Form 1File: Grove Form 1 - Sep 2023.pdf8 Oct 2025
Form 2File: Grove Form 2 - Sept 2023.pdf8 Oct 2025
Form 3File: Form-3 - Riverdale Grove - Sep 2023.pdf8 Oct 2025
Disclosure of Sold and Booked InventoryFile: Grove Sales Data - Sept 2023.pdf8 Oct 2025
Form 1File: 5 Form 1 - Riverdale Grove - Jun 2023.pdf8 Oct 2025
Form 2File: 6 Form 2 - Riverdale Grove - Jun 2023.pdf8 Oct 2025
Form 3File: Form 3 - Riverdale Grove - June 2023.pdf8 Oct 2025
Disclosure of Sold and Booked InventoryFile: 6 Inventory Details - Jun 2023.pdf8 Oct 2025
Form 1File: 4 Form 1 - Riverdale Grove - Mar 2023 - Counter Signed.pdf8 Oct 2025
Form 2File: Form 2 - Riverdale Grove - Mar 2023 - Counter Signed.pdf8 Oct 2025
Form 3File: Form 3 - Riverdale Grove - Mar 2023.pdf8 Oct 2025
Disclosure of Sold and Booked InventoryFile: Grove Inventory Details -March 2023.pdf8 Oct 2025
Form 1File: Form 1 Grove Sept 2024.pdf17 Sep 2025
Form 2File: Grove Form 2 Sept 2024.pdf17 Sep 2025
Form 3File: Grove Form3 Sept2024.pdf17 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sales Data - Grove Sept 2024.pdf17 Sep 2025
Form 1File: RERA Form 1 - Riverdale Grove - 30-06-2025.pdf11 Sep 2025
Form 2File: Form 2 Grove June 2025.pdf11 Sep 2025
Form 3File: Grove - Form 3 June 2025.pdf11 Sep 2025
Disclosure of Sold and Booked InventoryFile: Grove Sales Data June 2025.pdf11 Sep 2025
Form 1File: RERA Form 1 - Riverdale Grove - 31-12-2024.pdf11 Sep 2025
Form 2File: FORM 2 Grove Dec 2024.pdf11 Sep 2025
Form 3File: Form 3 R Grove Dec 24.pdf11 Sep 2025
Disclosure of Sold and Booked InventoryFile: Grove sales data Dec2024 (2).pdf11 Sep 2025
Form 1File: Form 1 Riverdale Grove March 2025.pdf22 Jul 2025
Form 2File: Form 2 Riverdale Grove.pdf22 Jul 2025
Form 3File: Form 3 R Grove March 2025 (2).pdf22 Jul 2025
Disclosure of Sold and Booked InventoryFile: Grove March 2025.pdf22 Jul 2025
Disclosure of sold/ booked inventoryFile: Grove sales data Dec2024.pdf11 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 R Grove March 2025.pdf8 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec 24.pdf3 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Riverdale Grove March 2025.pdf9 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Riverdale Grove.pdf9 Jun 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Riverdale Grove.pdf9 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form 1 - Riverdale Grove - 31-12-2024.pdf21 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Grove.pdf21 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Grove.pdf21 Feb 2025
Disclosure of sold/ booked inventoryFile: Inventory Details - 03Dec2024.pdf4 Dec 2024
Disclosure of sold/ booked inventoryFile: Sales Data - 30Nov2024.pdf4 Dec 2024
Layout approvalFile: plan 01-53_compressed.pdf3 Dec 2024
Building plan approvalFile: plan 29-53_compressed - Basement Floor Plan.pdf3 Dec 2024
Building plan approvalFile: plan 30-53_compressed - P1 Level Floor Plan.pdf3 Dec 2024
Building plan approvalFile: plan 31-53_compressed - P2 and P3 Level Floor Plan.pdf3 Dec 2024
Building plan approvalFile: plan 32-53_compressed - P4 and P5 Level Floor Plan.pdf3 Dec 2024
Building plan approvalFile: plan 33-53_compressed - 1st Floor Plan.pdf3 Dec 2024
Building plan approvalFile: plan 34-53_compressed - 1st Floor B6.pdf3 Dec 2024
Building plan approvalFile: plan 35-53_compressed - Refuge Floor B6.pdf3 Dec 2024
Building plan approvalFile: plan 36-53_compressed - 20th Floor B6.pdf3 Dec 2024
Building plan approvalFile: plan 37-53_compressed - 22, 26, 28 Floor B6.pdf3 Dec 2024
Building plan approvalFile: plan 38-53_compressed - Section Plan B6.pdf3 Dec 2024
Building plan approvalFile: plan 39-53_compressed - Refuge Floor B7.pdf3 Dec 2024
Building plan approvalFile: plan 40-53_compressed - 20th Floor B7.pdf3 Dec 2024
Building plan approvalFile: plan 42-53_compressed - 22, 26, 28 Floor B7.pdf3 Dec 2024
Building plan approvalFile: plan 43-53_compressed - Section Plan B7.pdf3 Dec 2024
Building plan approvalFile: plan 44-53_compressed - 1st Floor B8.pdf3 Dec 2024
Building plan approvalFile: plan 45-53_compressed - Refuge FLoor B8.pdf3 Dec 2024
Building plan approvalFile: plan 46-53_compressed - 20th Floor B8.pdf3 Dec 2024
Building plan approvalFile: plan 47-53_compressed - 22, 26, 28 Floor B8.pdf3 Dec 2024
Building plan approvalFile: plan 48-53_compressed - Section Plan B8.pdf3 Dec 2024
Building plan approvalFile: plan 51-53_compressed - Ground Floor Plan Area.pdf3 Dec 2024
Copy of Layout Approval (in case of layout)File: plan 01-53_compressed.pdf3 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: cc.pdf3 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: plan 51-53_compressed - Ground Floor Plan Area.pdf3 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: plan 48-53_compressed - Section Plan B8.pdf3 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: plan 47-53_compressed - 22, 26, 28 Floor B8.pdf3 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: plan 46-53_compressed - 20th Floor B8.pdf3 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: plan 45-53_compressed - Refuge FLoor B8.pdf3 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: plan 44-53_compressed - 1st Floor B8.pdf3 Dec 2024

Keep Riverdale Grove on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kharadi

2 kmRiverdale GroveCompleted 6Lapsed / revoked 1Other 3Dot size: filed unitsN

Filed coordinates, straight-line distance. 10 registered projects within 2 km.

Builder: Duville Estates Private Limited

Duville Estates Private Limited has 8 registrations on MahaRERA, including Riverdale Heights and Riverdale Residences-I. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Litigation is declared on 4 of its registrations. Read the full track record.

Frequently asked questions

What does it mean that Riverdale Grove shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Riverdale Grove is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Riverdale Grove?

The registered promoter entity is Duville Estates Private Limited, a company as per the filing. Its GSTIN 27AACCC8436BIZW can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Riverdale Grove?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Riverdale Grove?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Riverdale Grove?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Riverdale Grove?

The professionals named in the filing: Architect: Pinnac AECL consultancy PvtLtd; Engineer: J W Consultants; Chartered Accountant: Rabadia & Vekaria. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Riverdale Grove?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Riverdale Grove. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Riverdale Grove to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.