ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / RIVA

Registered No litigation declared Residential / Group Housing project

RIVA

By ASIAN VENTURES

RG-MH-01300 · RERA P52100004157 · Last updated on MahaRERA portal: 10 Aug 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 86 months
  • 4 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Nov 2027Possession promisedmoved 86 months from the original
6 of 11Construction stages donefurthest along: Staircases, 85%
40 of 104Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 107 documents Report an error

RIVA is a Residential / Group Housing project by ASIAN VENTURES in Pune, Maharashtra, registered with MahaRERA as P52100004157 on 8 Aug 2017. Possession is promised by 20 Nov 2027. The completion date has moved by 86 months from the original filing. 64 of the 104 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameRIVA
  • TypeResidential / Group Housing
  • Location
    • MAHARTASHTRA
    • PISOLI
    • Haveli
    • Pune
    • 411060
  • Pincode411060
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100004157
  • ReraGenie IDRG-MH-01300

Builder

  • NameASIAN VENTURES
  • Entity typeOthers
  • Named personsMEHERNOSH DARA BOBINMAKER, RAKESH SUBHASHCHANDRA KHURANA, RAHIV SUBHASHCHANDRA KHURANA, BRIJESH RAKESH KHURANA

Key dates

this monthRegisteredAug 2017First promiseSep 2020Revised toNov 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on8 Aug 2017
  • Promised completion20 Nov 2027
  • Revised completionRevised to 20 Nov 2027 (originally 30 Sep 2020)
  • Buildings1 building record
  • Documents filed107 files

Current status

62%64 of 104 units booked
100.0%Work done, per cost certificate

Figures as on 10 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RIVANA16141040104

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 10 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 85%.

RIVA: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%

Progress on shared amenities15

As on 10 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes85%
Water SupplyYes70%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes65%
Storm Water DrainsYes80%
Landscaping & Tree PlantingYes100%
Street LightingYes80%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes80%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes20%
Electrical meter room, sub-station, receiving stationYes60%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed113

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots113
Closed/Covered98
Open Space15

Land and ownership7

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,000 sq m
Land owned byNot the promoter
Named landowners7
LandownerVillageDistrict
ASIAN VENTURESPune (CB)Pune
AISAN VENTURESSwargatePune
ASIANVENTURESSwargatePune
RAJIV SUBHASHCHANDRA KHURANASwargatePune
Rajiv Subhashchandra Khurana-Pune
Rakesh Subhashchandra Khurana-Pune
Brijesh Rakesh Khurana-Pune

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Development Authority
Permissible FSI7410.26
Proposed, not sanctioned7,407 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDR KETKAR MARG 79/3 KAMLA NEHRU PARK ERANDWANE PUNE 411004
Estimated costRs 13.00 cr
Cost incurredRs 13.00 cr
Work done100.0%
BuildingWingEstimatedIncurred
RIVANARs 12.35 crRs 12.35 cr
-NARs 65.00 lakhRs 65.00 lakh

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectA DESIGN STUDIO
ArchitectMangesh Gotal
EngineerDELCONS CONSULTANTS INDIA PVT LTD
EngineerNexus Consultants & Engineers
EngineerSK Consultants & Engineers
Chartered AccountantNB Sayed & Associates
Chartered AccountantRutuja Narsingh & Associates
Chartered AccountantP V Patadiya & Co
PartnerRole in project
ASIAN VENTURES-

Extensions applied for4

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100018973Sep 2020 → May 2026

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19. We have consent of 75.47% allottees for purpose of extension of RERA registration period of the said project.

EXT52100012504Sep 2020 → Mar 2024

Reason as filed by the promoterDue to the pandemic -19 the market scenario and labor availability issues we allottees agree with the delay of the project RIVA and we give our concern to the developer as per the given date 21/03/2024 by them to take more time to complete the project

EXT52100006230Sep 2020 → Mar 2022

Reason as filed by the promoterDue to Covid19 pandamic

EA31032620487Sep 2020 → Nov 2027

Reason as filed by the promoterWe, ASIAN VENTURES, hereby declare the following with respect to the project RIVA bearing Registration No. P52100004157 registered under MahaRERA. The delay in completion of the project has occurred due to procurement challenges, site-related issues, coordination constraints, and temporary financial constraints. We further submit that we are in the process of obtaining a part Occupancy Certificate from the Local Governing Authority for Floors 1 to 8 within the next two months, and subsequently for Floors 9 to 14. We are closely monitoring the progress and taking all necessary steps to ensure c

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC005000000290220Kaizad Fardun DadrewallaM/S ASIAN VENTURES03/02/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Aug 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Nov 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Nov 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 20 Nov 2027

Documents filed107

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 107 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - Riva June 2026.pdf10 Aug 2026
Withdrawal Update Form 2File: Form 2 - Riva June 2026.pdf10 Aug 2026
Withdrawal Update Form 3File: Form 3 - Riva June 2026.pdf10 Aug 2026
Withdrawal Update Form 1File: Form 1 - Riva June 2026.pdf30 Jul 2026
Withdrawal Update Form 2File: Form 2 - Riva June 2026.pdf30 Jul 2026
Withdrawal Update Form 3File: Form 3 - Riva June 2026.pdf30 Jul 2026
Form 5 (FY 2024-2025)File: Form 5 of RIVA for FY 2024-25.pdf6 Jun 2026
Withdrawal Update Form 1File: Form 1 - Riva as on March 2026.pdf18 Apr 2026
Withdrawal Update Form 2File: Form 2 - Riva as on March 2026.pdf18 Apr 2026
Withdrawal Update Form 3File: Form 3 - Riva as on March 2026.pdf18 Apr 2026
Withdrawal Update Form 1File: Form 1 - Riva_As on Dec 2025.pdf11 Feb 2026
Withdrawal Update Form 2File: Form 2 - Riva_As on Dec 2025.pdf11 Feb 2026
Withdrawal Update Form 3File: Form 3 - Riva_As on Dec 2025.pdf11 Feb 2026
Layout approvalFile: Plan- Highlighted.pdf26 Nov 2025
Building plan approvalFile: 2.pdf26 Nov 2025
Building plan approvalFile: 3.pdf26 Nov 2025
Building plan approvalFile: 4.pdf26 Nov 2025
Building plan approvalFile: 5.pdf26 Nov 2025
Building plan approvalFile: 6.pdf26 Nov 2025
Building plan approvalFile: 7.pdf26 Nov 2025
Withdrawal Update Form 1File: Form 1 - Riva as on Sep 2025.pdf19 Oct 2025
Withdrawal Update Form 2File: Form 2 - Riva as on Sep 2025.pdf19 Oct 2025
Withdrawal Update Form 3File: Form 3 - Riva as on Sep 2025.pdf19 Oct 2025
Withdrawal Update Form 1File: Form 1 - Riva as on June 2025.pdf15 Oct 2025
Withdrawal Update Form 2File: Form 2 - Riva as on June 2025.pdf15 Oct 2025
Withdrawal Update Form 3File: Form 3 - Riva as on June 2025.pdf15 Oct 2025
Layout approvalFile: 1.pdf8 Oct 2025
Building plan approvalFile: 2.pdf8 Oct 2025
Building plan approvalFile: 3.pdf8 Oct 2025
Building plan approvalFile: 4.pdf8 Oct 2025
Building plan approvalFile: 5.pdf8 Oct 2025
Building plan approvalFile: 6.pdf8 Oct 2025
Building plan approvalFile: 7.pdf8 Oct 2025
Certificates of CA (Form 3)File: Form 3 - Riva as on March 2025.pdf2 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Riva as on March 2025.pdf2 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Riva as on March 2025.pdf29 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 of RIVA for FY 2023-24.pdf5 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A For FY 2023-24.pdf27 Feb 2025
Certificates of CA (Form 3)File: Form 3 - Riva - Mar 2024.pdf25 Feb 2025
Certificates of CA (Form 3)File: Form 3 - Riva - June 2024.pdf25 Feb 2025
Certificates of CA (Form 3)File: Form 3 - Riva - Sept 2024.pdf25 Feb 2025
Certificates of CA (Form 3)File: Form 3 - Riva - Dec 2024.pdf25 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Riva as on Mar 2024.pdf25 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Riva as on June 2024.pdf25 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Riva as on Sept 2024.pdf25 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Riva as on Dec 2024.pdf25 Feb 2025
Declaration in FORM BFile: AFFIDAVIT CUM DECLARATION.pdf23 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 - RIVA.pdf23 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf23 Mar 2024
Disclosure of sold/ booked inventoryFile: CIRCULAR 29 (1).pdf23 Mar 2024
Certificates of CA (Form 3)File: FORM 3_11zon.pdf23 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A FOR DICSLOSURE OF INT.pdf23 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A FY 2021-2022.pdf22 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A FY 2023-2024.pdf22 Mar 2024
CERSAI detailsFile: CRESAI DECLARATION.pdf22 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: FORM 5 FY 2017-2018.pdf22 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 FY 2018-2019.pdf22 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 FY 2019-2020.pdf22 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 FY 2020-2021.pdf22 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 FY 2021-2022.pdf22 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A.pdf22 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2A.pdf11 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 AY 2023-2024.pdf11 Mar 2024
Layout approvalFile: 06.pdf21 Apr 2023
Building plan approvalFile: 01.pdf21 Apr 2023
Building plan approvalFile: 02.pdf21 Apr 2023
Copy of Layout Approval (in case of layout)File: 06.pdf21 Apr 2023
Building Plan Approval (IOD)File: 01.pdf21 Apr 2023
Building Plan Approval (IOD)File: 02.pdf21 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A FOR AY 2021-22.pdf14 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 FY 2021-22.pdf14 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORM 5 FY 2021-22.pdf14 Apr 2023
Details of encumbrances concerned to LegalFile: format A.pdf19 Sep 2022
Declaration about Commencement CertificateFile: FORM D DECLARTION ABOUT COMMENCEMENT CERTIFICATE.pdf19 Sep 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 2A QUALITY ASSURANCE CERTIFICATE 2021.pdf19 Sep 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A QUALITY ASSURANCE CERTIFICATE 2020.pdf19 Sep 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A QUALITY ASSURANCE CERTIFICATE 2021.pdf19 Sep 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A QUALITY ASSURANCE CERTIFICATE 2021.pdf19 Sep 2022
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY.pdf19 Sep 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Certificate 2017-18.pdf19 Sep 2022

How this compares with Pune

62%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 86 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RIVA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PISOLI13,700+ in Pune

2 kmRIVACompleted 91Lapsed / revoked 44Other 86Dot size: filed unitsN

Filed coordinates, straight-line distance. 221 registered projects within 2 km.

Builder: ASIAN VENTURES

ASIAN VENTURES has 1 registration on MahaRERA, including RIVA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if RIVA is delayed beyond 20 Nov 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RIVA?

The registered promoter entity is ASIAN VENTURES, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RIVA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against RIVA?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for RIVA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RIVA?

The professionals named in the filing: Architect: A DESIGN STUDIO; Architect: Mangesh Gotal; Engineer: DELCONS CONSULTANTS INDIA PVT LTD; Engineer: Nexus Consultants & Engineers; Engineer: SK Consultants & Engineers; Chartered Accountant: NB Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RIVA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RIVA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RIVA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.