ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Rezo Phase 1

Registered No litigation declared Others project

Rezo Phase 1

By Triaa Square LLP

RG-MH-19548 · RERA P52100078220 · Last updated on MahaRERA portal: 28 Apr 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Rs 40.00 crore secured on the land, in favour of Godrej Finance Limited

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedno revision filed
0 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 90%
76 of 86Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 108 documents Report an error

Rezo Phase 1 is a Others project by Triaa Square LLP in Pune, Maharashtra, registered with MahaRERA as P52100078220 on 29 Nov 2024. Possession is promised by 31 Dec 2030. 10 of the 86 units on this registration are recorded sold or booked, and 0 of 22 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameRezo Phase 1
  • TypeOthers
  • Location
    • Mohammadwadi
    • Haveli
    • Pune
    • 411060
  • Pincode411060
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100078220
  • ReraGenie IDRG-MH-19548

Builder

  • NameTriaa Square LLP
  • Entity typeOthers

Key dates

this monthRegisteredNov 2024PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Nov 2024
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings2 building records
  • Documents filed108 files

Current status

12%10 of 86 units booked
6.1%Work done, per cost certificate

Figures as on 28 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing- CommercialNA6302020
Wing - DNA211566066

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 28 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 90%.

Wing- Commercial24%
ActivityProgress
Excavation90%
Basement (if any)50%
Podiums (if any)30%
Plinth60%
Stilt Floor30%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing - D24%
ActivityProgress
Excavation90%
Basement (if any)50%
Podiums (if any)30%
Plinth60%
Stilt Floor30%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 28 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed292

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots292
Closed/Covered180
Open Space112
BuildingClosed/CoveredOpen SpaceTotal
Wing- Commercial38112150
Wing - D1420142

Land and ownership18

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area5,550 sq m
Land owned byThe promoter, with other names on the file
Named landowners18
Encumbrance on the landDeclared present
Charge in favour ofGodrej Finance Limited
Secured amountRs 40.00 crore
CERSAI search filedYes
Declared on24 Dec 2025
LandownerVillageDistrict
M/s. Pacific Orient Genesis AssociatesPune (M Corp.)Pune
Shankar Genba SawantSawantwadiPune
Jijabai Dadasaheb JadhavAkluj (CT)Solapur
Shaila Suresh ShindePune (M Corp.)Pune
Vijay Sahebrao GaikwadGhotavadePune
Vasanti Sanjay GaikwadGhotavadePune
Rekha Ajay DeshpandePune (CB)Pune
Kumudini Dattatray MorePune (M Corp.)Pune
Petar Benjamin D’SouzaSolapur (M Corp.)Solapur
Rajendra Bhagwan GhodakePune (M Corp.)Pune
Dilip Bhagwan GhodakePune (M Corp.)Pune
Ramesh Gajanan ShendePune (M Corp.)Pune
Snehalata S LondhePune (M Corp.)Pune
Vasudha Vasant KulkarniPune (M Corp.)Pune
Ashok Shankar KedgeSangli Miraj Kupwad (M Corp.)Sangli
Gopal Govind KulkarniPune (M Corp.)Pune
Uttamrao Damunna MarkundeSolapur (M Corp.)Solapur
Giridhar Ganpat DighePune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI11712.77
Proposed, not sanctioned11,713 sq m
Buildings approved3
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDHOLE PATIL ROAD –PUNE GROUND FLOOR & FIRST FLOOR SHOP NO.1, “MILLENNIUM STAR” SASON ROAD, DHOLE PATIL ROAD, PUNE-411001.
Estimated costRs 260.28 cr
Cost incurredRs 15.82 cr
Work done6.08%
BuildingWingEstimatedIncurred
Wing- CommercialNARs 104.11 crRs 7.91 cr
Wing - DNARs 104.11 crRs 7.91 cr
-NARs 52.06 cr-

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCubix Architects Associates
EngineerUrban Infracon
Chartered AccountantAmol Shah
PartnerRole in project
Triaa Square LLP-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12600230Ram GawaliTriaa Square LLP06/04/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Oct 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Dec 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Dec 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed108

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 108 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Scanned Form 1_Triaa Square LLP_Mar 26.pdf28 Apr 2026
Withdrawal Update Form 2File: Scanned Form 2_Triaa Square LLP_Mar 26.pdf28 Apr 2026
Withdrawal Update Form 3File: Scanned Form 3_Triaa Square LLP_Mar 26.pdf28 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf17 Feb 2026
Withdrawal Update Form 2File: Form 2.pdf17 Feb 2026
Withdrawal Update Form 3File: Form 3.pdf17 Feb 2026
Layout approvalFile: Plan 1.pdf18 Dec 2025
Layout approvalFile: Plan 2.pdf18 Dec 2025
Layout approvalFile: Plan 3.pdf18 Dec 2025
Layout approvalFile: Plan 4.pdf18 Dec 2025
Layout approvalFile: Plan 5.pdf18 Dec 2025
Layout approvalFile: Plan 6.pdf18 Dec 2025
Layout approvalFile: Plan 7.pdf18 Dec 2025
Layout approvalFile: Plan 8.pdf18 Dec 2025
Layout approvalFile: Plan 9.pdf18 Dec 2025
Layout approvalFile: Plan 10.pdf18 Dec 2025
Layout approvalFile: Plan 11.pdf18 Dec 2025
Layout approvalFile: Plan 12.pdf18 Dec 2025
Layout approvalFile: Plan 13.pdf18 Dec 2025
Layout approvalFile: Plan 14.pdf18 Dec 2025
Layout approvalFile: Plan 15.pdf18 Dec 2025
Layout approvalFile: Plan 16.pdf18 Dec 2025
Layout approvalFile: Plan 17.pdf18 Dec 2025
Layout approvalFile: Plan 18.pdf18 Dec 2025
Layout approvalFile: Plan 19.pdf18 Dec 2025
Layout approvalFile: Plan 20.pdf18 Dec 2025
Layout approvalFile: Plan 21.pdf18 Dec 2025
Layout approvalFile: Plan 22.pdf18 Dec 2025
Building plan approvalFile: Plan 1.pdf18 Dec 2025
Building plan approvalFile: Plan 2.pdf18 Dec 2025
Building plan approvalFile: Plan 3.pdf18 Dec 2025
Building plan approvalFile: Plan 4.pdf18 Dec 2025
Building plan approvalFile: Plan 5.pdf18 Dec 2025
Building plan approvalFile: Plan 6.pdf18 Dec 2025
Building plan approvalFile: Plan 7.pdf18 Dec 2025
Building plan approvalFile: Plan 8.pdf18 Dec 2025
Building plan approvalFile: Plan 9.pdf18 Dec 2025
Building plan approvalFile: Plan 10.pdf18 Dec 2025
Building plan approvalFile: Plan 11.pdf18 Dec 2025
Building plan approvalFile: Plan 12.pdf18 Dec 2025
Building plan approvalFile: Plan 13.pdf18 Dec 2025
Building plan approvalFile: Plan 14.pdf18 Dec 2025
Building plan approvalFile: Plan 15.pdf18 Dec 2025
Building plan approvalFile: Plan 16.pdf18 Dec 2025
Building plan approvalFile: Plan 17.pdf18 Dec 2025
Building plan approvalFile: Plan 18.pdf18 Dec 2025
Building plan approvalFile: Plan 19.pdf18 Dec 2025
Building plan approvalFile: Plan 20.pdf18 Dec 2025
Building plan approvalFile: Plan 21.pdf18 Dec 2025
Building plan approvalFile: Plan 22.pdf18 Dec 2025
Layout approvalFile: Layout.pdf5 Dec 2025
Building plan approvalFile: Plan 1.pdf5 Dec 2025
Building plan approvalFile: Plan 2.pdf5 Dec 2025
Building plan approvalFile: Plan 3.pdf5 Dec 2025
Building plan approvalFile: Plan 4.pdf5 Dec 2025
Layout approvalFile: Layout.pdf24 Nov 2025
Building plan approvalFile: Plan 1.pdf24 Nov 2025
Building plan approvalFile: Plan 2.pdf24 Nov 2025
Building plan approvalFile: Plan 3.pdf24 Nov 2025
Building plan approvalFile: Plan 4.pdf24 Nov 2025
Withdrawal Update Form 1File: Form 1.pdf24 Nov 2025
Withdrawal Update Form 1File: Form 1.pdf24 Nov 2025
Withdrawal Update Form 2File: Form 2.pdf24 Nov 2025
Withdrawal Update Form 2File: Form 2.pdf24 Nov 2025
Withdrawal Update Form 3File: Form 3.pdf24 Nov 2025
Withdrawal Update Form 3File: Form 3.pdf24 Nov 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Dec 2024.pdf1 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Dec 2024.pdf1 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Dec 2024.pdf1 Apr 2025
Disclosure of sold/ booked inventoryFile: Circular 29.pdf1 Apr 2025
Other - FinanceFile: 2 Other - Finance (4).pdf15 Nov 2024
Other - FinanceFile: 3 Other - Finance.pdf15 Nov 2024
Other - FinanceFile: 1 Other - Finance (15).pdf7 Nov 2024
Other - TechnicalFile: Index 2 rezoooo_merged_removed.pdf7 Nov 2024
Copy of the legal title reportFile: Revise title search.pdf16 Oct 2024
Other - TechnicalFile: Cc Verification- Rezo Phase 1.pdf16 Oct 2024
Building plan approvalFile: Building Plan Approval- Page 4.pdf14 Oct 2024
Building plan approvalFile: Building Plan Approval- Page 3.pdf14 Oct 2024
Building plan approvalFile: Building Plan Approval- Page 2.pdf14 Oct 2024
Building plan approvalFile: 1-34_11zon.pdf14 Oct 2024

How this compares with Pune

12%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Rezo Phase 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mohammadwadi13,700+ in Pune

2 kmRezo Phase 1Completed 66Lapsed / revoked 24Other 74Dot size: filed unitsN

Filed coordinates, straight-line distance. 164 registered projects within 2 km.

Builder: Triaa Square LLP

Triaa Square LLP has 1 registration on MahaRERA, including Rezo Phase 1. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Rezo Phase 1 is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Rezo Phase 1?

The registered promoter entity is Triaa Square LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Rezo Phase 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Rezo Phase 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Rezo Phase 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Rezo Phase 1?

The professionals named in the filing: Architect: Cubix Architects Associates; Engineer: Urban Infracon; Chartered Accountant: Amol Shah. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Rezo Phase 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Rezo Phase 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Rezo Phase 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.