Home / Browse projects / Raigarh, Maharashtra / RENAISSANCE ROYAL PHASE II
RENAISSANCE ROYAL PHASE II
By Shree Sharada Infrastructures
RG-MH-75762 · RERA PR1271012600760 · Last updated on MahaRERA portal: 4 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
RENAISSANCE ROYAL PHASE II is a Residential / Group Housing project by Shree Sharada Infrastructures in Raigarh, Maharashtra, registered with MahaRERA as PR1271012600760 on 12 Jun 2026. Possession is promised by 31 Dec 2028. 0 of the 160 units on this registration are recorded sold or booked, and 3 of 18 construction stages are filed complete.
At a glance
Project
- NameRENAISSANCE ROYAL PHASE II
- TypeResidential / Group Housing
- Location
- -
- Neral
- Karjat
- Raigarh
- 410101
- Pincode410101
- MapView location on Google Maps (as filed on RERA)
- RERA no.PR1271012600760
- ReraGenie IDRG-MH-75762
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on12 Jun 2026
- Promised completion31 Dec 2028
- Revised completionNone
- Buildings2 building records
- Documents filed12 files
Current status
Figures as on 4 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| C BUILDING | NA | 5 | 4 | 40 | 0 | 40 |
| G BUILDING | NA | 8 | 8 | 112 | 8 | 120 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 4 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 18 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 90%.
C BUILDING52%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 75% |
| Slabs of Super Structure | 90% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 25% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 75% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
G BUILDING19%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | 70% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 4 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | 80% |
| Water Supply | No | 20% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | 20% |
| Storm Water Drains | No | 80% |
| Landscaping & Tree Planting | No | 15% |
| Street Lighting | No | 40% |
| Community Buildings | No | 15% |
| Treatment And Disposal Of Sewage And Sullage Water | No | 0% |
| Solid Waste Management And Disposal | No | 0% |
| Water conservation /Rain water harvesting | No | 0% |
| Energy managemcnt | No | 0% |
| Fire protection and fire safety requirements | No | 30% |
| Electrical meter room, sub-station, receiving station | No | 30% |
| Aggregate area of recreational Open Space | No | 0% |
| Open Parking | No | 0% |
Parking filed202
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Stilt / Ground | Total |
|---|---|---|
| C BUILDING | 47 | 47 |
| G BUILDING | 155 | 155 |
Land and ownership23
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Ramchandra Aambo Chanche | - | Raigarh |
| Narayan Amboo Chanche | - | Raigarh |
| Sunil Aambo Chanche | - | Raigarh |
| Lilabai Atmaram Chanche | - | Raigarh |
| Arun Atmaram Chanche | - | Raigarh |
| Ashok Atmaram Chanche | - | Raigarh |
| Ranjana Sanjay Chanche | - | Raigarh |
| Shraddha Sanjay Chanche | - | Raigarh |
| Shreyas Sanjay Chanche | - | Raigarh |
| Kishor Narayan Patil | - | Raigarh |
| Ganesh Narayan Patil | - | Raigarh |
| Jayashri Balu Chanche | - | Raigarh |
| Maruti Balu Chanche | - | Raigarh |
| Laxman Balu Chanche | - | Raigarh |
| Radhika Kisan Chanche | - | Raigarh |
| Akash Kisan Chanche | - | Raigarh |
| Akshay Kisan Chanche | - | Raigarh |
| Bhavana Balchandra Chanche | - | Raigarh |
| Harshada Balchandra Chanche | - | Raigarh |
| Sarika Balchandra Chanche | - | Raigarh |
| Kalpana Krishna Dangare | - | Raigarh |
| Ulhas Bhaga Shingate | - | Raigarh |
| Ramchandra Kamlu Hable | - | Raigarh |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| G BUILDING | NA | Rs 12.91 cr | Rs 1.50 cr |
| C BUILDING | NA | Rs 5.00 cr | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Shree Sthapatya Asssociates |
| Engineer | ATUL KUDTARKAR |
| Engineer | VK DESIGN CONSULTANCY |
| Chartered Accountant | NB Sayed & Associates |
| Chartered Accountant | CAP & CO. |
| Partner | Role in project |
|---|---|
| Shree Sharada Infrastructures | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportNot on the file
A lawyer's report on who owns the land and what is registered against it.
- Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 19 Feb 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 19 Feb 2026 - Commencement CertificateNot on the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
- Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed12
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1_PHASE - II _QPR 1ST_APR 2026 YO JUNE 2026.pdf | 4 Aug 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 4 Aug 2026 |
| Withdrawal Update Form 3File: _FORM_3.pdf | 4 Aug 2026 |
| Declaration and undertaking (Annexure A)File: ANNEXURE A Order No 50.pdf | 27 Apr 2026 |
| Layout approvalFile: Plan 1.pdf | 19 Feb 2026 |
| Building plan approvalFile: Plan 2.pdf | 19 Feb 2026 |
| Building plan approvalFile: Plan 5.pdf | 19 Feb 2026 |
| Building plan approvalFile: Plan 6.pdf | 19 Feb 2026 |
| Building plan approvalFile: Plan 11.pdf | 19 Feb 2026 |
| Building plan approvalFile: Plan 12.pdf | 19 Feb 2026 |
| Building plan approvalFile: Plan 13.pdf | 19 Feb 2026 |
| Building plan approvalFile: Plan 16.pdf | 19 Feb 2026 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Renaissance Royal Phase 1P52000019557 | Neral, Raigarh | 216 | Feb 2019 | Certificate Signed | Dec 2025Registered original: Dec 2024 | Dec 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 12 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep RENAISSANCE ROYAL PHASE II on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Neral5,900+ in Raigarh
ForeverLand
HOABL IMPACTUM LAND PRIVATE LIMITED
Chitrapatjanak Dadasaheb Phalke Township - Pha
Anukarati Homes Pvt Ltd
Olympeo Neo City
PRIZTINE INFRA LLP
DEEPJYOTI CITY
DeepJyoti Infra
VISION AARAMBH
M/s Vision Aarambh ( AOP )
Olympeo Riverside - Phase 3
Olympeo Riverside Projects LLP
See every Raigarh project, with the district possession charts
Builder: Shree Sharada Infrastructures
Shree Sharada Infrastructures has 2 registrations on MahaRERA, including Renaissance Royal Phase 1 and RENAISSANCE ROYAL PHASE II. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if RENAISSANCE ROYAL PHASE II is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of RENAISSANCE ROYAL PHASE II?
The registered promoter entity is Shree Sharada Infrastructures, a partnership as per the filing. Its GSTIN 27ABWFS9545H1Z8 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in RENAISSANCE ROYAL PHASE II?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for RENAISSANCE ROYAL PHASE II?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at RENAISSANCE ROYAL PHASE II?
The professionals named in the filing: Architect: Shree Sthapatya Asssociates; Engineer: ATUL KUDTARKAR; Engineer: VK DESIGN CONSULTANCY; Chartered Accountant: NB Sayed & Associates; Chartered Accountant: CAP & CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in RENAISSANCE ROYAL PHASE II?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback