DEEPJYOTI CITY

By DeepJyoti Infra

RG-MH-25459 · RERA P52000006352 · Last updated on MahaRERA portal: 18 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 72 months
  • 4 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Mar 2028Possession promisedmoved 72 months from the original
93 of 110Construction stages doneacross 10 buildings; furthest along: Installation of Lifts, 90%
114 of 462Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 311 documents Report an error

DEEPJYOTI CITY is a Others project by DeepJyoti Infra in Raigarh, Maharashtra, registered with MahaRERA as P52000006352 on 14 Aug 2017. Possession is promised by 31 Mar 2028. The completion date has moved by 72 months from the original filing. 348 of the 462 units on this registration are recorded sold or booked, and 93 of 110 construction stages are filed complete.

At a glance

Project

  • NameDEEPJYOTI CITY
  • TypeOthers
  • Location
    • Pashane Road
    • Pashane
    • Karjat
    • Raigarh
    • 410101
  • Pincode410101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000006352
  • ReraGenie IDRG-MH-25459

Builder

  • NameDeepJyoti Infra
  • Entity typePartnership
  • GSTIN27AAMFD3766C1ZE
  • PartnersDeepak Dattatrey Kudke, Jyoti Deepak Kudke, Dnyandev Deepak Kudke

Key dates

this monthRegisteredAug 2017First promiseMar 2022Revised toMar 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Aug 2017
  • Promised completion31 Mar 2028
  • Revised completionRevised to 31 Mar 2028 (originally 30 Mar 2022)
  • Buildings10 building records
  • Documents filed311 files

Current status

75%348 of 462 units booked
99.1%Work done, per cost certificate

Figures as on 18 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING 2 WING CNA5548048
BUILDING 3 WING D AND ENA5054054
BUILDING 4 WING F AND GNA5078078
BUILDING 5 WING HNA5034034
BUILDING 6 WING I AND JNA5050050
BUILDING 7 WING KNA5036036
BUILDING 8 WING LNA5038038
BUILDING 9 WING M AND NNA50401252
BUILDING 10 WING ONA5036036
BUILDING 11 WING PNA5036036

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building10

As on 18 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

93 of 110 construction stages are filed complete across 10 buildings. The stage furthest along is Installation of Lifts, at 90%.

BUILDING 2 WING C70%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING 3 WING D AND E90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
BUILDING 4 WING F AND G91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING 5 WING H91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING 6 WING I AND J91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING 7 WING K82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING 8 WING L82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING 9 WING M AND N91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING 10 WING O91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING 11 WING P91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 18 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes60%
Street LightingYes50%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes90%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed38

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots38
Closed/Covered12
Open Space26
BuildingClosed/CoveredOpen SpaceTotal
BUILDING 2 WING C123
BUILDING 3 WING D AND E224
BUILDING 4 WING F AND G033
BUILDING 5 WING H022
BUILDING 6 WING I AND J358
BUILDING 7 WING K224
BUILDING 8 WING L224
BUILDING 9 WING M AND N022
BUILDING 10 WING O134
BUILDING 11 WING P134

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area13,660 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Sep 2024

Approvals and building plan

Sanctioning authoritycollector office alibaug
Permissible FSI18097.12
Proposed, not sanctioned18,097 sq m
Buildings approved10
Buildings sanctioned10

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKALYAN WEST
Estimated costRs 38.21 cr
Cost incurredRs 37.88 cr
Work done99.12%
BuildingWingEstimatedIncurred
BUILDING 4 WING F AND GNARs 5.37 crRs 5.37 cr
-NARs 4.78 crRs 4.54 cr
BUILDING 6 WING I AND JNARs 3.88 crRs 3.88 cr
BUILDING 3 WING D AND ENARs 3.71 crRs 3.71 cr
BUILDING 2 WING CNARs 3.20 crRs 3.10 cr
BUILDING 9 WING M AND NNARs 3.10 crRs 3.10 cr
BUILDING 8 WING LNARs 2.96 crRs 2.96 cr
BUILDING 10 WING ONARs 2.96 crRs 2.96 cr
BUILDING 11 WING PNARs 2.96 crRs 2.96 cr
BUILDING 7 WING KNARs 2.75 crRs 2.75 cr
BUILDING 5 WING HNARs 2.54 crRs 2.54 cr

Certifying professionals and partners12

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAISINGH AHUJA & ASSOCIATES
ArchitectRAISINGH AHUJA
EngineerATUL KUDTARKAR & ASSOCIATES
EngineerATUL KUDTARKAR
EngineerKAUSHIK B. GANGANI
EngineerVIVEK BHOIR
EngineerAKON REALTY
Chartered AccountantPBG & Associates
Chartered AccountantPBG AND ASSOCIATES
Chartered AccountantPOOJA V JAIN AND CO
Chartered AccountantASHWINI K PRABHU AND ASSOCIATES
Chartered AccountantDARSHAN PANKAJ THAKKAR
PartnerRole in project
DeepJyoti Infra-

Extensions applied for4

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000015073Mar 2022 → Mar 2025

Reason as filed by the promoterExtension we needed is for construction of additional Area in Addition to existing Floor, There is no booking of Flats as expected. Shortage of fund is one of the reason.

EXT52000010937Mar 2022 → Mar 2023

Reason as filed by the promoterWe need extension for completion of project till 31.3.2023. Reason for delay in completion of project is because of Lockdown supply of building material and labour was not available Not only that there is no booking from customer during Lockdown

EXT52000027295Mar 2022 → Mar 2026

Reason as filed by the promoterDUE TO FINANCIAL CRISES AND FLAT BOOKING AND REGISTRATION IS SLOWDOWN AS PER EXPECTATION. AND SOME CONSTRUCTION WORK IS ALSO PENDING LIKE, CLUB HOUSE , ROAD, STREET LIGHT, WALL COMPOUND, GUTTER WORK AND OTHER AMENITIES ETC.

EA17042620655Mar 2022 → Mar 2028

Reason as filed by the promoterDUE TO FINANCIAL CRISES AND FLAT BOOKING AND REGISTRATION IS SLOWDOWN AS PER EXPECTATION. AND SOME CONSTRUCTION WORK IS ALSO PENDING LIKE WALL COMPOUND, GUTTER WORK, ENTRANCE GATE WORK, INTERENAL AND OUTTER BUILDING WORKS AND OTHER AMENITIES ETC

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 May 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 May 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 15 Aug 2021

Documents filed311

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 311 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: 01-04-2026 to 30-06-2026.pdf18 Jul 2026
Withdrawal Update Form 2File: Apr to June 26.pdf18 Jul 2026
Withdrawal Update Form 3File: form 3 april to june 2026.pdf18 Jul 2026
Form 5 (FY 2025-2026)File: form 5 march 2026.pdf24 Apr 2026
Withdrawal Update Form 1File: Form 1 Final Jan to Mar 26.pdf17 Apr 2026
Withdrawal Update Form 1File: Form 1 Final Jan to Mar 26.pdf17 Apr 2026
Withdrawal Update Form 2File: Form 2 (Jan to Mar 26).pdf17 Apr 2026
Withdrawal Update Form 2File: Form 2 (Jan to Mar 26).pdf17 Apr 2026
Withdrawal Update Form 3File: Deepjyoti_Form 3 Jan to Mar 26 Compress.pdf17 Apr 2026
Withdrawal Update Form 3File: Deepjyoti_Form 3 Jan to Mar 26 Compress.pdf17 Apr 2026
Form 2A (FY 2025-2026)File: Form 2A F Y 2025-26.pdf15 Apr 2026
Form 1File: July 17.pdf6 Mar 2026
Form 2File: Form-2 25-7-2017.pdf6 Mar 2026
Form 3File: June 17.pdf6 Mar 2026
Disclosure of Sold and Booked InventoryFile: sold and unsold details.pdf6 Mar 2026
Form 1File: Dec 17.pdf6 Mar 2026
Form 2File: Dec 17.pdf6 Mar 2026
Form 3File: Dec 17.pdf6 Mar 2026
Disclosure of Sold and Booked InventoryFile: sold and unsold details.pdf6 Mar 2026
Form 1File: Mar 18.pdf6 Mar 2026
Form 2File: Form-2 Mar.pdf6 Mar 2026
Form 3File: Apr-18.pdf6 Mar 2026
Disclosure of Sold and Booked InventoryFile: sold and unsold details.pdf6 Mar 2026
Form 1File: June.pdf6 Mar 2026
Form 2File: June.pdf6 Mar 2026
Form 3File: June 18.pdf6 Mar 2026
Disclosure of Sold and Booked InventoryFile: sold and unsold details.pdf6 Mar 2026
Form 1File: Sep.pdf6 Mar 2026
Form 2File: Form 2 Sep.pdf6 Mar 2026
Form 3File: Sep 18.pdf6 Mar 2026
Disclosure of Sold and Booked InventoryFile: sold and unsold details.pdf6 Mar 2026
Form 1File: Dec.pdf6 Mar 2026
Form 2File: Form 2 Dec.pdf6 Mar 2026
Form 3File: Dec-18.pdf6 Mar 2026
Disclosure of Sold and Booked InventoryFile: sold and unsold details.pdf6 Mar 2026
Form 1File: Mar.pdf6 Mar 2026
Form 2File: Form 2 Mar.pdf6 Mar 2026
Form 3File: Mar 19.pdf6 Mar 2026
Disclosure of Sold and Booked InventoryFile: sold and unsold details.pdf6 Mar 2026
Form 1File: June.pdf6 Mar 2026
Form 2File: Form-2 June.pdf6 Mar 2026
Form 3File: June 19.pdf6 Mar 2026
Disclosure of Sold and Booked InventoryFile: sold and unsold details.pdf6 Mar 2026
Form 1File: Sep.pdf6 Mar 2026
Form 2File: Form 2 Sep.pdf6 Mar 2026
Form 3File: Sep 19.pdf6 Mar 2026
Disclosure of Sold and Booked InventoryFile: sold and unsold details.pdf6 Mar 2026
Form 1File: Dec.pdf6 Mar 2026
Form 2File: Form 2 Dec.pdf6 Mar 2026
Form 3File: Dec 19.pdf6 Mar 2026
Disclosure of Sold and Booked InventoryFile: sold and unsold details.pdf6 Mar 2026
Form 1File: Mar.pdf6 Mar 2026
Form 2File: Form 2 Mar.pdf6 Mar 2026
Form 3File: Mar 20.pdf6 Mar 2026
Disclosure of Sold and Booked InventoryFile: sold and unsold details.pdf6 Mar 2026
Form 1File: June 20.pdf6 Mar 2026
Form 2File: June 20.pdf6 Mar 2026
Form 3File: June 20.pdf6 Mar 2026
Disclosure of Sold and Booked InventoryFile: sold and unsold details.pdf6 Mar 2026
Form 1File: Sep 20.pdf6 Mar 2026
Form 2File: Sep 20.pdf6 Mar 2026
Form 3File: Sep 20.pdf6 Mar 2026
Disclosure of Sold and Booked InventoryFile: sold and unsold details.pdf6 Mar 2026
Form 1File: Dec 20.pdf6 Mar 2026
Form 2File: Dec 20.pdf6 Mar 2026
Form 3File: Dec 20.pdf6 Mar 2026
Disclosure of Sold and Booked InventoryFile: sold and unsold details.pdf6 Mar 2026
Form 1File: Mar 21_compressed.pdf6 Mar 2026
Form 2File: Mar 21.pdf6 Mar 2026
Form 3File: Mar 21.pdf6 Mar 2026
Disclosure of Sold and Booked InventoryFile: sold and unsold details.pdf6 Mar 2026
Form 1File: June 21.pdf6 Mar 2026
Form 2File: June 21.pdf6 Mar 2026
Form 3File: 30-06-2021.pdf6 Mar 2026
Disclosure of Sold and Booked InventoryFile: sold and unsold details.pdf6 Mar 2026
Form 1File: Sep 21.pdf6 Mar 2026
Form 2File: Sep 21.pdf6 Mar 2026
Form 3File: 31-09-2021.pdf6 Mar 2026
Disclosure of Sold and Booked InventoryFile: sold and unsold details.pdf6 Mar 2026
Form 1File: Dec 21.pdf6 Mar 2026

How this compares with Raigarh

75%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 72 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep DEEPJYOTI CITY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pashane5,900+ in Raigarh

2 kmDEEPJYOTI CITYCompleted 8Lapsed / revoked 9Other 14Dot size: filed unitsN

Filed coordinates, straight-line distance. 31 registered projects within 2 km.

Builder: DeepJyoti Infra

DeepJyoti Infra has 1 registration on MahaRERA, including DEEPJYOTI CITY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if DEEPJYOTI CITY is delayed beyond 31 Mar 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DEEPJYOTI CITY?

The registered promoter entity is DeepJyoti Infra, a partnership as per the filing. Its GSTIN 27AAMFD3766C1ZE can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DEEPJYOTI CITY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for DEEPJYOTI CITY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DEEPJYOTI CITY?

The professionals named in the filing: Architect: RAISINGH AHUJA & ASSOCIATES; Architect: RAISINGH AHUJA; Engineer: ATUL KUDTARKAR & ASSOCIATES; Engineer: ATUL KUDTARKAR; Engineer: KAUSHIK B. GANGANI; Engineer: VIVEK BHOIR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DEEPJYOTI CITY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DEEPJYOTI CITY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DEEPJYOTI CITY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.