Registered No litigation declared Residential / Group Housing project

REGENCY ASTRA PHASE IV

By Regency Aawishkar Sarsan Developers LLP

RG-MH-43441 · RERA P52100081020 · Last updated on MahaRERA portal: 18 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Slabs of Super Structure, 75%
146 of 146Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 88 documents Report an error

REGENCY ASTRA PHASE IV is a Residential / Group Housing project by Regency Aawishkar Sarsan Developers LLP in Pune, Maharashtra, registered with MahaRERA as P52100081020 on 16 Oct 2025. Possession is promised by 31 Mar 2027. 0 of the 146 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameREGENCY ASTRA PHASE IV
  • TypeResidential / Group Housing
  • Location
    • Baner
    • Pune
    • Haveli
    • 411045
  • Pincode411045
  • RERA no.P52100081020
  • ReraGenie IDRG-MH-43441

Builder

  • NameRegency Aawishkar Sarsan Developers LLP
  • Entity typePartnership
  • GSTIN27AAVFR2876G1ZI
  • PartnersREGENCY NIRMAN LIMITED REGENCY NIRMAN LIMITED, SANJAY BALKRISHNA BOOB, AMIN AMIRALI SOMJEE, RAHUL VILAS NAHATA, SARSAN DEVELOPERS PRIVATE LIMITED SARSAN DEVELOPERS PRIVATE LIMITED, PANKAJ DINESH PASSORIA, Kamal Vijaykumar Tulsian, Ramesh Samrathmal Oswal
  • Other registrations4 more →
  • Completed1 of 5
  • Declared earlier projects3 →

Key dates

this monthRegisteredOct 2025PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 Oct 2025
  • Promised completion31 Mar 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed88 files

Current status

0%0 of 146 units booked
53.3%Work done, per cost certificate

Figures as on 18 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
REGENCY ASTRA PHASE IVNA14141460146

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 75%.

REGENCY ASTRA PHASE IV: 68% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes70%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes80%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes50%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed72

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots72
Closed/Covered72

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,655 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on25 Feb 2026

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI10117.93
Proposed, not sanctioned4,885 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR, REGENCY HOUSE, OPP VISHNU DARSHAN APARTMENT, AMAN TALKIES ROAD ULHASNAGAR - 2
Estimated costRs 36.00 cr
Cost incurredRs 19.20 cr
Work done53.33%
BuildingWingEstimatedIncurred
REGENCY ASTRA PHASE IVNARs 33.00 crRs 18.00 cr
-NARs 3.00 crRs 1.20 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHIRISH DASNURKAR
EngineerVISHWANATHR PRAJAPATI
Chartered AccountantN G KUKREJA AND CO
Chartered AccountantAJAY HASSIJA & ASSOCIATES
PartnerRole in project
Regency Aawishkar Sarsan Developers LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Jul 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Oct 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 May 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Oct 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed88

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Archetect Certificate C1.pdf18 Jun 2026
Withdrawal Update Form 2File: Engineer Certificate.pdf18 Jun 2026
Withdrawal Update Form 3File: 3rd CA Certificate_Phase-IV_Signed.pdf18 Jun 2026
Withdrawal Update Form 1File: form 1.pdf27 Feb 2026
Withdrawal Update Form 2File: form 2.pdf27 Feb 2026
Withdrawal Update Form 3File: 2nd CA Certificate 3 rd.pdf27 Feb 2026
Layout approvalFile: 21 Other - Legal.pdf13 Oct 2025
Copy of Layout Approval (in case of layout)File: 21 Other - Legal.pdf13 Oct 2025
Commencement Certificates / NA Order for plotted developmentFile: Appendix F 23092025.pdf3 Oct 2025
Declaration about Commencement CertificateFile: Confimration by PMC through Mail.pdf3 Oct 2025
Declaration about Commencement CertificateFile: Format D_290825.pdf30 Aug 2025
Other - FinanceFile: Pointwise reply to scrutiny desk comments.pdf30 Aug 2025
Copy of the legal title reportFile: 1.pdf15 Jul 2025
Copy of the legal title reportFile: 2.pdf15 Jul 2025
Copy of the legal title reportFile: 3.pdf15 Jul 2025
Copy of the legal title reportFile: 4.pdf15 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revised CA Certificate - converted.pdf15 Jul 2025
Other - LegalFile: Layout - converted.pdf15 Jul 2025
Other - LegalFile: SUMMARY OF OTHER LEGAL TAB.pdf15 Jul 2025
Other - LegalFile: CC-1003-2023 Building Plan 0020 - converted.pdf15 Jul 2025
Other - LegalFile: CC-1003-2023 Building Plan 0021_compressed.pdf15 Jul 2025
Other - LegalFile: CC-1003-2023 Building Plan 0022_compressed.pdf15 Jul 2025
Other - LegalFile: CC-1003-2023 Building Plan 0023_compressed.pdf15 Jul 2025
Proforma of Agreement for saleFile: Agreement for sale.pdf15 Jul 2025
Building plan approvalFile: Layout 0001 - converted.pdf29 May 2025
Building plan approvalFile: Plan C1 Mahada and Sale LG and UG.PDF29 May 2025
Building plan approvalFile: Plan C1 Mahada and Sale P1 P2 Plus car parking.PDF29 May 2025
Building plan approvalFile: plan C1 Mahada and Sale.PDF29 May 2025
Building plan approvalFile: plan C1 Mahada.PDF29 May 2025
Proforma of Allotment letterFile: 3 Allotment Letter_.pdf29 May 2025
Building Plan Approval / NA Order for plotted developmentFile: plan C1 Mahada.PDF29 May 2025
Building Plan Approval / NA Order for plotted developmentFile: plan C1 Mahada and Sale.PDF29 May 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan C1 Mahada and Sale P1 P2 Plus car parking.PDF29 May 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan C1 Mahada and Sale LG and UG.PDF29 May 2025
Building Plan Approval / NA Order for plotted developmentFile: Layout 0001 - converted.pdf29 May 2025
Deviation Report with respect to model copy of AgreementFile: Revised Deviation.pdf29 May 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: 7 Bank letter for RERA Form-B.pdf29 May 2025
Details of encumbrances concerned to FinanceFile: 2 No Encumbrance Formt - LEGAL.pdf17 Feb 2025
Details of encumbrances concerned to FinanceFile: 8 No Encumberace certificate.pdf17 Feb 2025
Declaration in FORM BFile: 4 Form B.pdf17 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: Plinth Completion Certificate.pdf17 Feb 2025
Other - LegalFile: 54-11.pdf17 Feb 2025
Other - LegalFile: बाणेर_53_1 ते 4_8_54_8 ते 11_अॅमिनीटी स्पेस_Satbara dtd 13-02-25.pdf17 Feb 2025
Other - LegalFile: बाणेर_53_1 ते 4_8_54_8 ते 11_ओपन स्पेस_Satbara dtd 13-02-25.pdf17 Feb 2025
Other - LegalFile: बाणेर_53_1 ते 4_8_54_8 ते 11_प्लॉट_Satbara dtd 13-02-25.pdf17 Feb 2025
Other - LegalFile: बाणेर_53_1_1_Satbara dtd 13-02-25.pdf17 Feb 2025
Other - LegalFile: बाणेर_54_8_1_Satbara dtd 13-02-25.pdf17 Feb 2025
Other - LegalFile: 54-10.pdf17 Feb 2025
Other - LegalFile: 53-1-3-4-8, 54-8-9-10-11.pdf17 Feb 2025
Other - LegalFile: 54-10-.pdf17 Feb 2025
Other - LegalFile: 53-1.pdf17 Feb 2025
Other - LegalFile: 53-1-2-4,54-8-9-10-11.pdf17 Feb 2025
Other - LegalFile: 53-8.pdf17 Feb 2025
Other - LegalFile: 54-8.pdf17 Feb 2025
Other - LegalFile: 54-8-.pdf17 Feb 2025
Other - LegalFile: 54-8--.pdf17 Feb 2025
Other - LegalFile: 54-8---.pdf17 Feb 2025
Other - LegalFile: 54-9.pdf17 Feb 2025
Other - LegalFile: 54-9--.pdf17 Feb 2025
Other - LegalFile: 54-10, 54-11.pdf17 Feb 2025
CERSAI detailsFile: 9 Undertaking of Cersai Report.pdf17 Feb 2025
Deviation Report with respect to Allotment letterFile: 4 No Deviation Declaration - for Allottment Letter.pdf17 Feb 2025
Details of encumbrances concerned to LegalFile: 2 No Encumbrance Formt - LEGAL.pdf17 Feb 2025
Details of encumbrances concerned to LegalFile: 8 No Encumberace certificate.pdf17 Feb 2025
Other - TechnicalFile: 18 ANNEXURE A decalation cum undertaking.pdf17 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf25 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest RNL.pdf25 Jan 2025
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure of Secured unsecured loan.pdf25 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Engineer Certificate C1.pdf24 Jan 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Designated Bank Account.pdf24 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Ramesh Oswal.pdf24 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Kamal T.pdf24 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Pankaj Passoria.pdf24 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: RNL.pdf24 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Rahul Nahata.pdf24 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Sanjay boob.pdf24 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Amin Somjee.pdf24 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Sarsan Dev Pvt Ltd.pdf24 Jan 2025
Building plan approvalFile: plan C1 Mahada.PDF22 Jan 2025
Building plan approvalFile: Plan C1 Mahada and Sale LG and UG.PDF22 Jan 2025

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 not delivered by the promised date1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
REGENCY ASTRA PHASE IIIP52100053943Pune, Pune176Dec 2023OngoingDec 2026Not due yet
REGENCY ASTRA PHASE IIP52100046664PUNE CITY, Pune176Aug 2022OngoingNov 2025Not delivered
REGENCY ASTRA PHASE IP52100032177PUNE CITY, Pune-Dec 2021CompletedNov 2024Jan 1970

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep REGENCY ASTRA PHASE IV on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pune13,700+ in Pune

Builder: Regency Aawishkar Sarsan Developers LLP

Regency Aawishkar Sarsan Developers LLP has 5 registrations on MahaRERA, including REGENCY ASTRA PHASE I and REGENCY ASTRA PHASE II. Its filings disclose 3 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if REGENCY ASTRA PHASE IV is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of REGENCY ASTRA PHASE IV?

The registered promoter entity is Regency Aawishkar Sarsan Developers LLP, a partnership as per the filing. Its GSTIN 27AAVFR2876G1ZI can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in REGENCY ASTRA PHASE IV?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for REGENCY ASTRA PHASE IV?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at REGENCY ASTRA PHASE IV?

The professionals named in the filing: Architect: SHIRISH DASNURKAR; Engineer: VISHWANATHR PRAJAPATI; Chartered Accountant: N G KUKREJA AND CO; Chartered Accountant: AJAY HASSIJA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in REGENCY ASTRA PHASE IV?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About REGENCY ASTRA PHASE IV. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save REGENCY ASTRA PHASE IV to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.