ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / REDEVELOPMENT OF SHANKAR VIHAR CHS LTD

Registration lapsed No litigation declared Residential / Group Housing project

REDEVELOPMENT OF SHANKAR VIHAR CHS LTD

By Heritage Lifestyles &Developers

RG-MH-51761 · RERA P51800018909 · Last updated on MahaRERA portal: 24 Apr 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 17 months past the filed date
  • Completion date moved by 30 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
May 2025Possession promised17 months past this date
5 of 11Construction stages donefurthest along: Staircases, 95%
10 of 19Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 70 documents Report an error

REDEVELOPMENT OF SHANKAR VIHAR CHS LTD is a Residential / Group Housing project by Heritage Lifestyles &Developers in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800018909 on 12 Dec 2018. Possession was promised by 31 May 2025 and is now 17 months past that date. The completion date has moved by 30 months from the original filing. 9 of the 19 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameREDEVELOPMENT OF SHANKAR VIHAR CHS LTD
  • TypeResidential / Group Housing
  • Location
    • ROAD NO 17
    • CHEMBUR
    • Kurla
    • Mumbai Suburban
    • 400071
  • Pincode400071
  • RERA no.P51800018909
  • ReraGenie IDRG-MH-51761

Builder

  • NameHeritage Lifestyles &Developers
  • Entity typePartnership
  • PartnersGirish Partabrai Gangwani, Pradeep Somashekar Shetty

Key dates

17 months past promisethis monthRegisteredDec 2018First promiseNov 2022Revised toMay 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on12 Dec 2018
  • Promised completion31 May 2025
  • Revised completionRevised to 31 May 2025 (originally 30 Nov 2022)
  • Buildings1 building record
  • Documents filed70 files

Current status

47%9 of 19 units booked

Figures as on 24 Apr 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
HERITAGE SOLITAIRENA141218119

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 95%.

HERITAGE SOLITAIRE: 86% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 24 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes70%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes90%
Landscaping & Tree PlantingYes60%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes90%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes80%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed44

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots44
Closed/Covered38
Open Space6

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area811 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
SHANKAR VIHAR CHS LTDKurlaMumbai Suburban

Approvals and building plan

Sanctioning authorityBrihanmumbai Municipal Corporation
Permissible FSI2756.25
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNO 20 DAFFODILS SECTOR 14 VASHI NAVI MUMBAI 400703

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectConstructive India
EngineerVishwakarma Enterprises
Chartered AccountantShyam Agarwal
Chartered AccountantN.K Karla & Associates
PartnerRole in project
Heritage Lifestyles &Developers-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800019828Nov 2022 → May 2025

Reason as filed by the promoterDUE TO ROAD SETBACK ISSUE

EXT51800010692Nov 2022 → Nov 2023

Reason as filed by the promoterThe delay was caused first due to the ongoing project for COVID 19 Pandemic where in there was shortage of Labours and Manpower. However we have started the construction activities now and we expect to complete the project by 30th November 2023.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Nov 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Nov 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Nov 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed70

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Heritage Solitaire Form 5.pdf24 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: HERITAGE SOLITAIRE ANNEXURE B FORM 2_0001.pdf19 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: HERITAGE SOLITAIRE ANNEXURE C FORM 2A_0001.pdf19 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: SHANKAR VIHAR.PDF19 Apr 2025
Disclosure of sold/ booked inventoryFile: sold unsold inventory shankar vihar.pdf18 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SHANKAR VIHAR CHSL ANNEXURE A FORM 1 ARCHITECT CERTIFICATE (1).pdf17 Apr 2025
Certificates of CA (Form 3)File: HERITAGE SOLITARE CA Q4_compressed.pdf17 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: HERITAGE SOLITAIRE ANNEXURE B FORM 2 ENGINEER'S CERTIFICATE -SHANKAR VIHAR (1)_compressed.17 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: HERITAGE SOLITAIRE ANNEXURE C FORM 2A ENGINEER'S CERTIFICATE -SHANKAR VIHAR (1)_compressed17 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: HERITAGE SOLITAIRE ANNEXURE C FORM 2A ENGINEER'S CERTIFICATE -SHANKAR VIHAR (1)_compressed17 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: HERITAGE SOLITAIRE.pdf17 Jan 2025
Certificates of CA (Form 3)File: Solitaire CA.pdf17 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: HERITAGE SOLITAIRE ANNEXURE B FORM 2 ENGINEER'S CERTIFICATE_2.pdf17 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SHANKAR VIHAR.pdf19 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: HERITAGE SOLITAIRE.pdf19 Oct 2024
Certificates of CA (Form 3)File: heritage Solitaire.pdf19 Oct 2024
Certificates of CA (Form 3)File: sOLITAIRE CA.pdf19 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: HERITAGE SOLITAIRE ANNEXURE B FORM 2 ENGINEER CERTIFICATE.pdf19 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PDF.pdf19 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: HERITAGE SOLITAIRE ANNEXURE B FORM 2 ENGINEER CERTIFICATE.pdf19 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ANNEXURE B FORM 2 ENGINEERS CERTIFICATE.pdf29 May 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold inventory.pdf29 May 2024
Certificates of CA (Form 3)File: Shyam Agrawal.pdf29 May 2024
Declaration in FORM BFile: FORM B AFFIDAVIT.pdf28 May 2024
Declaration about Commencement CertificateFile: self declaration.pdf27 May 2024
Declaration about Commencement CertificateFile: SOLITAIRE SELF DECLRATION.pdf27 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ANNEXURE A FORM 1 ARCHITECT CERTIFICATE signed.pdf27 May 2024
Commencement Certificates / NA Order for plotted developmentFile: solitaire cc revalidation.pdf23 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: solitaire - form 5.pdf23 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: HERITAGE SOLITAIRE ANNEXURE A FORM 1 ARCHITECT CERTIFICATE.pdf21 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Heritage Solitaire Engineer Certificate.pdf21 Feb 2024
Certificates of CA (Form 3)File: CA Certificate Oct- Dec.pdf21 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: solitaire declaration for bank account.pdf27 Jun 2023
Certificates of CA (Form 3)File: CA Certificate - Heritage Soliatire.pdf21 Jun 2023
Details of encumbrances concerned to FinanceFile: Heritage Solitaire-Encumbrance Certificate.pdf23 Nov 2022
Details of encumbrances concerned to LegalFile: Heritage Solitaire-Encumbrance Certificate.pdf23 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: quality Assurance Certificate 19-20.pdf29 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: quality Assurance Certificate.pdf29 Nov 2021
CERSAI detailsFile: SV Self Declaration for Encumbrances.PDF27 Nov 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: fY 18-19.pdf27 Nov 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: fy 19-20.pdf27 Nov 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FY 20-21.pdf27 Nov 2021
Layout approvalFile: Drawing (24)_.pdf25 Nov 2021
Layout approvalFile: iod.pdf25 Nov 2021
Building plan approvalFile: IOD2.pdf25 Nov 2021
Copy of Layout Approval (in case of layout)File: Drawing (24)_.pdf25 Nov 2021
Copy of Layout Approval (in case of layout)File: iod.pdf25 Nov 2021
Building Plan Approval (IOD)File: IOD2.pdf25 Nov 2021
Declaration about Commencement CertificateFile: Declaration for Commencement Certificate.pdf25 Nov 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Shankar Vihar Architect's Certificate (Form-1) Ongoing Projects.pdf25 Nov 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Shankar Vihar Structural Engineer's Certificate (Form-2) Ongoing Projects.pdf25 Nov 2021
Disclosure of sold/ booked inventoryFile: iNVENTORY.pdf25 Nov 2021
Certificates of CA (Form 3)File: CA 2.pdf25 Nov 2021
Layout approvalFile: Shankar Vihar CTS Plan.pdf3 Dec 2018
Layout approvalFile: Shankar vihar DP remark 1991.pdf3 Dec 2018
Copy of Layout Approval (in case of layout)File: Shankar Vihar CTS Plan.pdf3 Dec 2018
Copy of Layout Approval (in case of layout)File: Shankar vihar DP remark 1991.pdf3 Dec 2018
OtherFile: Rera Area Statment.pdf3 Dec 2018
Building plan approvalFile: SV IOD O FSI.pdf30 Nov 2018
PAN CardFile: PAN HLD.pdf30 Nov 2018
Copy of the legal title reportFile: SV TitleCertificate.PDF30 Nov 2018
Details of encumbrancesFile: SV Self Declaration for Encumbrances.PDF30 Nov 2018
Building Plan Approval (IOD)File: SV IOD O FSI.pdf30 Nov 2018
Commencement Certificates / NA Order for plotted developmentFile: Shankar Vihar First CC.pdf30 Nov 2018
Declaration in FORM BFile: Declaration-Form-B.pdf30 Nov 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Heritage Solitaire Architect Form-1.PDF30 Nov 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Heritage Solitaire Engineers Form -2.PDF30 Nov 2018
Certificates of CA (Form 3)File: Heritage Solitaire-CA FORM-3.pdf30 Nov 2018
Proforma of Allotment letterFile: Allottment Letter Format.pdf30 Nov 2018
Proforma of Allotment letterFile: RERA Draft-Agreement-for-Sale.pdf30 Nov 2018

How this compares with Mumbai Suburban

47%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 30 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep REDEVELOPMENT OF SHANKAR VIHAR CHS LTD on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHEMBUR6,700+ in Mumbai Suburban

Builder: Heritage Lifestyles &Developers

Heritage Lifestyles &Developers has 1 registration on MahaRERA, including REDEVELOPMENT OF SHANKAR VIHAR CHS LTD. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that REDEVELOPMENT OF SHANKAR VIHAR CHS LTD shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if REDEVELOPMENT OF SHANKAR VIHAR CHS LTD is delayed beyond 31 May 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of REDEVELOPMENT OF SHANKAR VIHAR CHS LTD?

The registered promoter entity is Heritage Lifestyles &Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in REDEVELOPMENT OF SHANKAR VIHAR CHS LTD?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for REDEVELOPMENT OF SHANKAR VIHAR CHS LTD?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at REDEVELOPMENT OF SHANKAR VIHAR CHS LTD?

The professionals named in the filing: Architect: Constructive India; Engineer: Vishwakarma Enterprises; Chartered Accountant: Shyam Agarwal; Chartered Accountant: N.K Karla & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in REDEVELOPMENT OF SHANKAR VIHAR CHS LTD?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About REDEVELOPMENT OF SHANKAR VIHAR CHS LTD. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save REDEVELOPMENT OF SHANKAR VIHAR CHS LTD to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.